Gå til hovedinnhold

Figur

Figure 2. Left: Picture of Lander bottom frame, taken by ROV Freyja during pick up at Hywind Tampen. Right: Position of Lander at Hywind Tampen, depth is 280 m.
Fig 2 lander frame and map.png