Gå til hovedinnhold

Figur

Figure 16. Depth profile of deployment from Brenke Sleds 1 (left) and 2 (right) through time with the recalculated bottom contact (green lines) and liftoff (red lines) timestamps logged by the transponder in comparison to the timestamps recorded by the bridge (black dotted lines).
Figur file_html_3ddf912c46581fe1.png