Gå til hovedinnhold

Figur

Figure 34. Depth profile of deployment from Brenke Sleds 5through time with the recalculated bottom contact (green lines) and liftoff (red lines) timestamps logged by the transponder in comparison to the timestamps recorded by the bridge (black dotted lines).
Figur file_html_bcf141682a70b13f.png