Figure 8. Drawing shows the transect conducted by G.O. Sars trough the Hywind Tampen (dotted blue line). It starts and ends 3 nm (5.5 km) from the safety zone (yellow line). Dotted circle between HY07 and HY08 (turbine 7 and 8) is the Lander site shown in Figure 3. Suction anchors are marked SA- and turbines HY-number. Brown full and - dotted lines are cables.