Gå til hovedinnhold

Survey report from the Joint IMR-VNIRO Winter Survey in the Barents Sea 2026

Preface

Development of the Barents Sea winter survey began in the 1970s, when the Institute of Marine Research (IMR) began acoustic measurements of demersal fish. Since 1981, the winter survey has been designed to produce both acoustic and swept area estimates of fish abundance. Data and results from the survey are used both for stock assessments and by several research projects at IMR and PINRO, the Polar branch of the Russian Federal Research Institute of Fisheries and Oceanography (VNIRO). Since 2019, the winter survey has been a joint IMR-VNIRO survey with commitments from both institutes to obtain a total coverage of the main demersal fish resources in the area.

The main aims of the winter survey are to:

-    Obtain acoustic abundance indices by length and age for cod and haddock
-    Obtain swept area abundance indices by length and age for cod and haddock
-    Obtain swept area abundance indices by length for redfish, Greenland halibut and blue whiting
-    Map the geographical distribution of those fish stocks
-    Estimate length, weight and maturity at age for cod and haddock
-    Collect stomach samples from cod, for estimating predation by cod 
-    Map the distribution of capelin (pre-spawning) and polar cod

Some development of the survey has taken place since the 1970s, both in area coverage and in methodology. The development is described in detail by Jakobsen et al. (1997), Johannesen et al. (2009) and in Appendix 3, and the current survey design and methods for survey index calculation are presented in Appendix 2. 

This report presents the main results from the surveys in January-March 2026. The surveys were performed with the Norwegian research vessels “Kronprins Haakon” and “Johan Hjort”, and the Russian research vessel “Vilnyus”. Annual survey reports since 1981 are listed in Appendix 5, and names of scientific participants in 2026 are given in Appendix 4.

Annual catch quotas and other regulations of the Barents Sea fisheries are set through negotiations between Norway and Russia in the Joint Norwegian-Russian Fisheries Commission. Assessment of the state of the stocks and quota advice were historically given by the International Council for the Exploration of the Sea (ICES). Due to the temporary suspension of Russian scientists and subsequent permanent exit by Russia of Russian scientists from ICES in 2022/2025, assessment and advice have since 2022 been carried out by the Joint Russian-Norwegian working group on Arctic Fisheries (JRN-AFWG), consisting of scientists from VNIRO (Russia) and IMR (Norway). The results from the demersal fish winter surveys in the Barents Sea are an important source of information for the annual stock assessment.

Summary

The 2026 Joint IMR-VNIRO Winter Survey took place from 24 January–16 March and achieved good spatial coverage of the target species distributions.

The total acoustic echo abundance of cod and haddock has been below the long-term (1994-2026) mean since 2020, but since 2022 cod has had a flat trend while haddock increased until 2025 before a decline in 2026 that was mainly due to reduced abundance of 1-yearolds.

The highest bottom trawl catches of cod <=50 cm were found west of Svalbard and around Bear Island and also in the central part of the Barents Sea. For cod ≥ 50 cm there was as usual high catch rates along the Norwegian coast, but also around Bear Island and to the west of Svalbard. Catch rates in the southeastern Barents Sea were low for all length groups, in particular cod < 35 cm, and reflects changes seen in recent years of lower cod abundance in the Russian zone compared to historical distributions. Swept area indices for cod and haddock also declined sharply in 2020 and remain at low levels for cod while haddock indices are closer to the long-term average. The 2019-2020 and 2023-2025 year-classes of cod were among the lowest in the time series at age 1-3, while the 2021-2022 year-classes were moderate at these ages. For haddock, the 2021 and 2024 year-classes were strong, though the latter appears less strong at age 2. The 2025 year-class of haddock is close to average.

Analyses of cod stomachs from 2025 show that young cod had poorer feeding conditions compared to 2024, and that older cod had higher frequencies of feeding on haddock. Somatic growth of cod from 2025 to 2026 was well below the long-term mean for many age groups, especially age 3-5. Growth of haddock of age 3 and older was also low. These changes may be related to low capelin abundance.

Abundance, biomass and distribution of the three redfish species were similar to recent averages. Recent stronger year-classes include 2021, 2020 and 2022 for golden, beaked, and Norway redfish, respectively.

The observed distribution of Greenland halibut in 2026 was similar to that observed in previous years’ surveys, with highest abundances in the Bear Island trench and around Svalbard. Since 2023, abundance estimates have been at an all-time high, mainly due to an increase in abundance of 30-40 cm fish.

Distributions of capelin and polar cod were similar to recent years. Swept area indices for blue whiting gives a first indication of a strong 2025-year-class.

1 - Survey operation

The 2026 survey (24 January–16 March) achieved good coverage with 579 bottom trawl and 13 pelagic trawl hauls (Tables 1.1-1.2, Figure 1.1). Trawling was performed throughout open-water areas, as well as in partially ice-covered areas (strata 26) with Kronprins Haakon (Figure 1.1). Ice distribution showed the typical extension toward Bear Island, with the central-northern ice edge receding northward as early as late February while south-eastern ice cover increased throughout the survey (Figure 1.2).

Map showing cruise tracks and trawl stations in the 2026 survey. Strata to the north (25 and 26) were partially covered due to sea ice. Strata 20 in northeast just covered in the westernmost part. Otherwise good coverage and survey design followed as planned.
Figure 1.1. Survey tracks and all demersal (DT) and pelagic (PT) trawl stations in the winter survey 2026, by research vessel. The grey background shading represents the average ice cover during the survey (ice data downloaded from http://dx.doi.org/10.15770/EUM_SAF_OSI_NRT_2005 ). Polygons show the numbered strata system (before annual adjustments).

Table 1.1 Vessel participation by period and trawl station series numbers by vessel for the winter survey in 2026.

  Period IMR series no.
Johan Hjort 09.02-16.03 70001-70168
Kronprins Haakon 24.01-07.03 70301-70522
Vilnyus 02.02-11.03 70601-70811
Daily maps showing development of sea ice cover during the survey; in the central-northern parts ice covered parts of strata 25 and 26 until the end of February, while ice cover in the southeasternmost strata increased thoughout the survey period.
Figure 1.2. Daily sea ice maps for each survey day (ice data downloaded from http://dx.doi.org/10.15770/EUM_SAF_OSI_NRT_2005 ). Coloured points represent the trawl stations taken on each day.
Strata Area Number of stations within each trawl type
    B 1 B 2 P
1 A 23   1
2 A 18   2
3 A 11    
4 B 22    
5 B 14 1 1
6 C 18 1  
7 D 29   1
8 D 29   2
9 D 13   1
10 D 15    
11 D 27    
12 D 21    
13 D’ 30    
14 D’ 24 1  
15 D’ 14    
16 D’ 19    
17 D’ 19    
18 E 25 1  
19 E 18    
20 E 4    
21 S 19    
22 S 19    
23 S 28 1  
24 N 65   5
25 N 19    
26 N 10    
Inside standard strata system 554 5 13
Outside strata system 18 1  
Total 572 6 13

Table 1.2. Overview of trawl stations by strata, main area, and trawl type in the 2026 survey.

The coverage of the most northern and most eastern strata differs from year to year. The areas of these strata are therefore calculated according to the coverage each year. Table A1.1 gives the area covered by the survey every year since 1981. In that table “Extrapolated area” reflects the size of areas where some kind of extrapolations/adjustments have been made to take account of incomplete coverage (see also section 3.1). Table 1.3 summarizes the degree of coverage and main reasons for incomplete coverage in the whole period.

Year Coverage Comments
1981-1992 ABCD  
1993-1996 ABCDD’ES  
1997 Norwegian EEZ (NEZ), S Not allowed access to Russian EEZ
1998 NEZ, S, minor part of Russian EEZ Not allowed access to most of Russian EEZ
1999 ABCDD’ES Partly limited coverage due to westerly ice extension
2000 ABCDD’ES Russian participation starts
2001-2005 ABCDD’ES Russian vessel covered where Norwegians had no access
2006 ABCDD’ES No Russian vessel, not allowed access to Murman coast
2007 NEZ, S No Russian vessel, not allowed access to Russian EEZ
2008 ABCDD’ES Russian vessel covered where Norwegians had no access
2009 ABCDD’ES Reduced Norwegian coverage of Russian EEZ due to catch handling
2010 ABCDD’ES Reduced Norwegian coverage of Russian EEZ due to bad weather
2011 ABCDD’ES Russian vessel covered where Norwegians had no access
2012 ABCDD’ES No Norwegian coverage of Russian EEZ due to vessel problems
2013 ABCDD’ES No Norwegian coverage of Russian EEZ due to vessel shortage
2014 ABCDD’ESN Strata 24-26 (N) covered for the first time
2015 ABCDD’ESN Slightly reduced/more open coverage due to bad weather
2016 ABCDD’ESN No access to Russian EEZ, Russian vessel covered most of Russian EEZ
2017 ABCDD’ESN No Russian vessel, not allowed access to southwestern Russian EEZ
2018 ABCDD’ESN Russian vessel covered where Norwegians had no access
2019 ABCDD’ESN Russian vessel covered where Norwegians had no access
2020 ABCDD’ESN Reduced coverage of D’, E, and N due to bad weather, reduced survey time (medical emergency), and ice-cover
2021 ABCDD’ESN Reduced coverage of D’ and E due to ice cover and time constraints, and of area N due to ice cover.
2022 ABCDD’ESN Reduced coverage of D’ and E due to ice cover and time constraints, and of area N due to ice cover.
2023 ABCDD’ESN Reduced coverage of D’, E, and N due to ice cover and time constraints.
2024 ABCDD’ESN Reduced coverage of D’, E due to time constraints, and area N due to ice cover.
2025 ABCDD’ESN Reduced coverage of D’, E due to time constraints, and area N due to ice cover.
2026 ABCDD’ESN Generally good coverage. Reduced coverage in area N (strata 25 and 26) due to ice cover, and area E (strata 20) due to time constraints.

Table 1.3. Barents Sea winter surveys 1981-2025. Main Areas covered, and comments on incomplete coverage.

2 - Length and age material

Individual lengths are collected from all target species, while otoliths for age determination are taken from cod, haddock, and capelin. For cod and haddock, the otolith readings are key for splitting the survey indices by age.

Table A2.1 gives an account of the sampled length- and age material from bottom hauls and pelagic hauls from 1994 onwards.

Table A2.2. shows the number of age readings per age for cod from 1994 onwards, while table A2.3 shows the same for haddock. The number of age samples for fish age 10+ increased in the second half of the time series, reflecting changing age composition in the stock.

3 - Survey index calculation

Details on the calculation of survey indices, including StoX settings for different species, are found in Appendix 2.

In 2026, the swept area and acoustic1 estimation in StoX was based on the following biotic and acoustic snapshot files (versioned trawl and acoustic data):

Cod and haddock
biotic_cruiseNumber_0171_2026_UFJN_VILN_Vilnyus_2026-05-08T22.00.14.455Z.xml biotic_cruiseNumber_2026002001_Johan Hjort_2026-05-11T22.00.14.418Z.xml
biotic_cruiseNumber_2026007002_Kronprins Haakon_2026-05-11T22.00.08.309Z.xml
echosounder_cruiseNumber_0171_2026_UFJN_VILN_Vilnyus_2026-05-04T11.31.44.216Z.xml
echosounder_cruiseNumber_2026002001_Johan Hjort_2026-03-23T23.00.07.014Z.xml
echosounder_cruiseNumber_2026007002_Kronprins Haakon_2026-04-30T07.01.07.536Z.xml
Redfish (three species)
biotic_cruiseNumber_0171_2026_UFJN_VILN_Vilnyus_2026-05-08T22.00.14.455Z biotic_cruiseNumber_2026002001_Johan Hjort_2026-05-04T22.00.08.363Z biotic_cruiseNumber_2026007002_Kronprins Haakon_2026-05-04T22.00.02.473Z
Greenland halibut
biotic_cruiseNumber_0171_2026_UFJN_VILN_Vilnyus_2026-05-08T22.00.14.455Z.xml
biotic_cruiseNumber_2026002001_Johan Hjort_2026-05-11T22.00.14.418Z.xml
biotic_cruiseNumber_2026007002_Kronprins Haakon_2026-05-11T22.00.08.309Z.xml
Blue whiting
biotic_cruiseNumber_0171_2026_UFJN_VILN_Vilnyus_2026-05-08T22.00.14.455Z.xml
biotic_cruiseNumber_2026002001_Johan Hjort_2026-05-12T22.00.16.002Z.xml
biotic_cruiseNumber_2026007002_Kronprins Haakon_2026-05-12T22.00.06.950Z.xml

Table 3.1. Versions of acoustic and biotic data files (snapshots) used in StoX projects to calculate survey indices, by species.

1 Acoustic estimation is done for cod and haddock only. The biotic files are used in the acoustic StoX projects to split the acoustic backscatter by age.

3.1 - Accounting for incomplete coverage

Incomplete coverage is not uncommon in the survey due to ice distribution, time constraints, unforeseen events or area restrictions. The list below details how incomplete coverage has been handled in survey index calculation. All strata adjustments are documented in the species-specific StoX projects. Note: annual adjustments below apply to cod and haddock only unless otherwise specified. Adjustments for other species are documented in the General Notes section.

3.1.1 - Survey Index Adjustments by Year

1997-1998, 2007 : Only Norwegian EEZ and Svalbard covered. Survey indices raised to represent the Russian EEZ using standardized methods (Mehl et al. 2016).

2006 : Southeast coverage incomplete due to area restrictions. Strata 7 observations extrapolated to full strata; strata 13 extrapolated to match 2005 coverage area.

2012 : Eastern areas incomplete. Estimates raised using average age-specific ratios (proportions of total index by age) observed in 2008–2011 for the same area.

2017 : Norwegian vessel operationally restricted (north of 70°10'N only); no Russian vessel participated. Strata 7 partially covered; strata 13, 15, 17, 20 not covered. Estimates raised using age-specific ratios from 2014–2016 average.

2020 : Strata 17, 19, 20 incomplete. Estimates raised using age-specific ratios from 2018–2019 average.

2021 : Strata 16, 19, 20 incomplete. Stratum 20 excluded from estimation (historically low abundance, ice coverage, no recent data). Stratum 16 (one trawl station only) raised using 2019–2020 age-specific average ratios.

2023 : Strata 16, 17, 20 incomplete; reduced coverage in strata 9, 13–15, 24–26 but deemed representative. Stratum 20 excluded (historically low abundances). Stratum 16 (two stations) included despite low coverage. Stratum 17 adjusted to 300 m isobath for cod to prevent inflating catches in historically productive southwest areas.

2024 : Generally good coverage. Strata 13–16, 24–26 partly reduced (time constraints, ice). Stratum 20 not covered and excluded. Standard ice-related strata border adjustments applied.

2025 : Strata 13–17 and 25–26 partly reduced (time constraints, ice). Coverage taken as representative in strata 13 and 17. Stratum borders adjusted to match covered areas in strata 14–16; strata 25–26 borders cut to match ice edge. Stratum 20 excluded.

2026 : Generally good coverage. Coverage of strata 25–26 impacted by ice; borders adjusted to ice edge. Russian stratum 20 partially covered for first time in recent years; border adjusted to covered area only due to lack of historical adjustment data.

3.1.2 - General Notes

Redfish : Survey indices revised in 2022. Annual strata adjustments are made regardless of the cause of incomplete coverage.

Greenland halibut : Survey indices revised in 2023. No adjustments made to ice-covered strata (assumes species distribution continues under ice); adjustments made only for uncovered open-water strata that contribute significantly to the total index. This is done by borrowing data from the same strata in neighboring years. The following adjustments have been made:

Stratum 12 and 16 in 1997 and stratum 16 in 1998-1999 – replaced by 1996 data

Stratum 16 and 19 in 2003 and 19 in 2004 – replaced by 2002 data

Stratum 19 in 2006 and 16 in 2007 – replaced by 2005 data

Stratum 16 in 2010 – replaced by 2009 data

Stratum 16 in 2012 – replaced by 2011 data

Stratum 17 in 2017 – replaced by 2016 data

Blue whiting : Indices not adjusted; this species is mainly distributed in the south-western Barents Sea which is usually well-covered.

4 - Total echo abundance of cod and haddock

Table 4.1 presents the time series of total echo abundance (mean sA multiplied by strata area and summed over all strata) of cod and haddock in the investigated areas. Echo abundance decreased for both species from 2025 to 2026, relatively more for haddock than for cod.

The lowest echo abundances of cod were recorded in 2004-2007, and in the last few years of the time series (2021-), while the highest values were seen in 1994 and 2013-2015. The very low value in 2007 likely reflects the lack of coverage of the Russian zone and is not directly comparable to the others, making 2023 the lowest observed echo abundance in the time series, reflecting the recent downwards trend in the stock.

The trend for haddock is similar, but with lowest abundances observed in the late 1990s and without the dip in 2004-2007. Peak values occurred five years earlier than cod (2008-2010). The sharp reduction in echo abundance between 2020 and 2021 were seen for both species, but while cod dropped from 2022 to 2023, haddock remained at similar levels.

  StoX
Year Cod Haddock Sum
1994 5282 3898 9180
1995 3671 2948 6619
1996 2789 1248 4037
19971 1355 832 2187
19981 2254 543 2797
1999 1517 771 2288
2000 2833 1534 4367
2001 2158 1488 3646
2002 1976 2247 4223
2003 3717 3570 7287
2004 1174 2087 3261
2005 1370 2519 3889
2006 1116 2541 3657
20071 675 2311 2986
2008 3510 6195 9705
2009 2452 5300 7752
2010 3526 5939 9465
2011 2967 3715 6682
2012 3478 4182 7660
2013 5026 3604 9656
2014 4847 2915 7762
2015 5245 2161 7406
2016 2879 1587 4466
20171 2139 2588 4732
2018 3537 2851 6388
2019 3282 3039 6321
20201 2676 2199 4875
20211 1128 983 2111
2022 1437 1624 3061
2023 948 1635 2583
2024 1146 2151 3297
2025 1436 3152 4588
2026 1232 1981 3213

Table 4.1. Cod and haddock. Total echo abundance in the Barents Sea winter survey 1994-2026 (m2 reflecting surface · 103) estimated by StoX. Observations outside main areas A-S are not included.

1 not scaled for uncovered areas

5 - Distribution and abundance of cod

For both the bottom trawl and acoustic estimates as well as the diet data, cod with all otolith types (coastal cod included) are included in the calculations.

5.1 - Acoustic estimation

Surveys in the Barents Sea at this time of the year mainly cover the immature part of the cod stock. Most of the mature cod (age 7 and older) have started on their spawning migration southwards out of the investigated area and are therefore to a lesser extent covered. There are indications that a higher proportion than normal spawned along Finnmark in some years, e.g., 2004-2006 and 2024-2026. Thereby, a higher proportion of spawners might have been covered by the survey in those years. Figure 5.1 shows the spatial distribution of acoustic registrations assigned to cod in 2026. The registrations reflect the general distribution of cod in the southwestern Barents Sea and on the west coast of Spitsbergen. The NASC values in 2026 were low, reflecting the overall low echo abundance.

Maps with circles proportional to acoustic registrations of cod in 2026. Largest registrations west of Svalbard and along the Norwegian coast, especially in the southwesternmost parts of the survey area. Low registreations in north/north-east.
Figure 5.1. COD NASC. Distribution of acoustic backscatter (m2/nmi2 ) assigned to cod in 2026. The black lines without yellow circles represent parts of the cruise track where the acoustic backscatter was scrutinized but not assigned to cod. Red circles indicate NASC >500. NASC values < 5 were set to zero for this illustration.

Table A5.1 shows the acoustic indices for each age group by main areas in 2026. 89 % of the 1-year-olds were found in the extended area (N) in 2026 compared to 67 % in 2025. Age 1 also had the highest percentage in area N of all age groups. The time series of total abundance at age (1994-2026) is presented in Table A5.2 and Figure 5.2.

Barplot showing time series of acoustic abundance indices by age since 1994, stacked to show total index. the 2026 bar is slightly lower than 2025 but similar to the average since 2020. Highest index in recent years were in 2014, 2015, 2019 and 2019, mainly due to high number of 1-yearolds.
Figure 5.2. Time series of total acoustic abundance at age for cod (1994-2026). The dotted line separates the periods before and after the survey area was extended to include also area N.

As cod grow older it gets a more south-westerly distribution during winter, so that it “grows into” the covered area with increasing age. This is especially evident for the strong 2004 and 2005 year classes, which as 6-11-year-olds stand out as the strongest in the time series. The acoustic estimates have been variable in later years. The 2019-2020 and 2023-2025 year classes were among the lowest in the time series at age 1-3 while the 2021-2022 year classes were moderate at age 1-3. Table A5.3 shows time series for strata 24-26 (area N) in 2014-2026, which are included in the main time series.

Table A5.4 presents estimated coefficients of variation (CV) for cod age groups 1-14 in 1994-2026. These estimates were obtained by using StoX with a stratified bootstrap routine treating each transect as the primary sampling unit. In addition, a bootstrap routine for all trawl stations by strata was carried out within each run. The estimated CV (Standard Deviation ∙ 100/mean) is estimated from 500 iterations . A CV of 20% or less could be viewed as acceptable in a traditional stock assessment approach if the indices are unbiased (conditional on a catchability model). In 2026 the age groups 3-11 fall into this category. Values above this indicate higher uncertainty of the estimated index, with reduced information regarding year class strength. In all years, CVs for age groups older than 10 years are at or above what could be considered as acceptable. This is to a large degree related to low catch rates resulting in fewer age samples for these age groups (Table A2.2).

5.2 - Swept area estimation

Figures 5.3 - 5.6 show the geographic distribution of bottom trawl catch rates (number of fish per NM2 ), for cod size groups < 20 cm, 20-34 cm, 35-49 cm and ≥ 50 cm. For cod <=50 cm the highest catch rates were found west of Svalbard /Spitsbergen and around Bear Island and also in the central part of the Barents Sea (cod 35-49 cm only). For cod ≥ 50 cm there was as usual high catch rates along the Norwegian coast, but also around Bear Island and to the west of Svalbard /Spitsbergen (Fig. 5.6). Catch rates in the southeastern Barents Sea were low for all length groups.

Distribution map for small cod (<20 cm). Cod of this size were found south and west of Svalbard and in the central-northern Barents Sea. Very low catches in the south and east.
Figure 5.3. COD < 20 cm. Distribution in valid bottom trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

 

Distribution of cod 20-34 cm. Found mainly west and north in the survey area, very low catches in south and east.
Figure 5.4. COD 20-34 cm. Distribution in valid bottom trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

 

Distribution of cod 35-49 cm. Found mainly northwest and in the central-eastern parts of the survey area. Very low catches in the southern areas.
Figure 5.5. COD 35-49 cm. Distribution in valid bottom trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

 

Distribution of cod >50 cm. Found mainly northwest, central and southern parts of the survey area. Low catches in the east.
Figure 5.6. COD ≥ 50 cm. Distribution in valid bottom trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

Table A5.5 presents abundance indices by main areas and age, and the full time series 1994-2026 is shown in Table A5.6 and Figure 5.7. The bottom trawl indices have fluctuated somewhat for the same reasons as the acoustic indices, and the 2004 and 2005 year-classes stand out as the strongest in the time series. The 2009, 2011 and 2014 year-classes seemed to be strong as 1-year olds but have later been reduced to average level or below. The year classes 2017 and 2018 also seemed strong at age one but are more average as 2- and 3-year-olds. The 2019-2020 and 2023-2025 year classes were among the lowest in the time series both at age 1 and 2 while the 2021-2022 year classes were moderate at age 1-3. 74 % of the 1-year olds were found in the extended area (N) in 2026 compared to 51 % in 2025. Age 1 also had the highest percentage in area N of all age groups (Table A5.5). Table A5.7 shows the time series for strata 24-26 (area N) in 2014-2026, which are included in the main time series. In 2023, there was hardly any coverage northeast of the extended area, i.e., north of Svalbard /Spitsbergen outside of the survey stratification, where fair amounts of cod have been observed prior to 2023 and also in 2024-2026.

Time series of swept area abundance of cod, shown as age-specific indices stacked on top of each other, by year. The 2026 index was slightly lower than the 2025 index. The index has been at a lower level since 2020. Higher recent years include 2014, 2015, 2018, 2020, reflecting better recruitment the year previously.
Figure 5.7. Time series of total bottom trawl abundance at age for cod (1994-2026). The dotted line separates the periods before and after the survey area was extended to include also area N.

Table A5.8 presents estimated coefficients of variation (CV) for cod age groups 1-15 in 1994-2026. In 2026, age groups 2-11 have CVs below or equal to 20 %. Values above this indicate higher uncertainty of the estimated index, with reduced information regarding year class strength. In all years, CVs for age groups older than 10 years are above what could be considered as acceptable. This is to a large degree related to low catch rates resulting in fewer age samples for these age groups (Table A2.2).

5.3 - Survey mortalities

Table A5.9 and Figure 5.8a-b show the time series of survey-based mortalities (natural log ratios between survey indices of the same year class in two successive years) for the acoustic and swept area indices since 1994. These mortalities are influenced by natural and fishing mortality, age reading errors, and the catchability and availability (coverage) at age for the survey. In the period 1994-1999 there was an increasing trend in the survey mortalities. Most later surveys show lower mortalities, but there are some fluctuations for the same reasons as mentioned for the acoustic and swept area indices. Presumably the mortality of the youngest age groups (ages 1-3) is mainly caused by predation, while for the older age groups the fishery is the main cause. Although the survey mortalities are noisy, the mortalities for age 4 and older correspond well with the strong decrease in fishing mortality around 2007 in the stock assessment. The low survey mortalities in the 2010s, even with “impossible” negative values, could partly be caused by fish gradually “growing into” the covered area at increasing age. 2019-2020 and 2020-2021 estimates suggest higher survey mortalities than in previous years, while mortality decreased for most age groups in 2021-2022, increased again in 2022-2023 and then decreased again in 2023-2024 before increasing in 2024-2025. The survey mortality in 2025-2026 was higher than in 2024-2025 for most ages.

Survey mortality (negative ratio of log survey indices for age a+1 in year y+1 and age a in year y) shown as line graph by age over time. Survey mortalities went up for most ages from 2024-2025 to 2025-2026.
Figure 5.8a. Survey mortalities for cod calculated from acoustic abundance indices.

 

Survey mortality for bottom trawl survey by age over time. Survey mortalities went up for ages 1-2, 2-3 and 8-9 compared to 2024-2025.
Figure 5.8b. Survey mortalities for cod calculated from bottom trawl abundance indices.

 

5.4 - Growth and maturity

Tables A5.10-11 and figures 5.9-5.10 present the time series for mean length and mean weight at age. For age groups 1-2 and 5-6 and older, growth from 2025 to 2026 was close to average and size at age is now close to the long-term mean (Table A5.12 and Fig 5.11). However, growth from age 2-3, 3-4 and 4-5 was well below the long-term mean and thus weight at age 3-5 in 2026 is well below the long-term mean and close to the lowest observed values in the time-series.

Mean length at age over time shown as a line graph. Length went up for ages 9 and 10 and down for ages 3-6 compared to 2025.
Figure 5.9. Mean length at age for cod in the winter surveys in 1994-2026.

 

Line graph of mean weight at age across years. In 2026 mean weights went up for ages 9-10 and down for ages 5-6, while it was similar compared to 2025 for the other ages.
Figure 5.10. Mean weight at age for cod in the winter surveys in 1994-2026.

 

Bar plot showing weight increments by age for each age for recent survey years. Growth of most ages <8 was lower from 2025 to 2026 compared to recent years.
Figure 5.11. Mean weight increment at age for cod for the period 2014-2026.

The proportion mature at age is presented in Table A5.13 and Fig 5.12. The proportions increased slightly from 2025 to 2026 for ages 6-10 but are lower than in 2024.

Cod maturity ogive showing proportion mature at different ages as one line for each year. 2026-values were similar to recent years, with the age at 50 % maturity at approximately 7 years.
Figure 5.12. Proportion mature-at-age for cod from 2014-2026.

The degree of coverage of the Russian zone (REZ) may also influence the biological parameters, as body size tends to decrease towards the northeast in the survey area. In addition, length, weight and maturity at age of older ages has higher uncertainty due to fewer samples (c.f. table A2.2).

5.5 - Stomach sampling

Since 1984, cod stomachs have been sampled regularly during the winter survey. The sampling strategy has generally been the same as that for sampling otoliths. Stomach have been frozen on board and analysed in the laboratory, except for the period 1994-2000, when some of the stomachs were analysed on board and only the main prey categories were identified. For details about the sampling methodology and the Norwegian-Russian cooperation on diet investigations in the Barents Sea, see Mehl and Yaragina (1992) and Dolgov et al . (2007).

The number of stations and stomachs sampled as well as the proportion of empty stomachs and the mean stomach fullness index (SFI, see below) for each of four size groups (≤ 19 cm, 20-34 cm, 35-49 cm, ≥ 50 cm) is given in Table A5.14 and Fig. 5.13. Tables A5.15 - A5.18 and Figs. 5.14-5.17 show the mean stomach content composition by prey species/groups by year for each size group. Note that in the years 1994-2000, blue whiting, long rough dab and Norway pout were included in the category ‘other fish’ when stomachs were analysed on board.

The stomach fullness index is calculated as SFIi=100*ΣWSi/Wi, where WSi is the weight (g) of the stomach content of fish i, and Wi is the weight (g) of fish i . For 1987 SFI has not been calculated, because very few fish were weighed that year due to technical problems. The distribution on prey groups has been adjusted by distributing the unidentified component of the diet proportionally among the various components, taking into account the level of identification.

The proportion of empty stomachs is the largest for the smallest fish (Table A5.14), a pattern seen for all years. The stomach fullness in 2025 was lower than in 2024, in particular for cod 20-34 cm. Capelin is the dominating prey for cod ≥ 20 cm, followed by shrimp and a variety of fish prey (Tables A5.16-A5.18), while for the smallest cod, krill is also important (Table A5.15). However, in many years, including 2025, capelin is the most important prey also for the smallest cod. The proportion of haddock and cod in the stomach content of cod >=35cm increased from 2024 to 2025, with haddock making up 27% of the stomach content for cod >=50cm.

Mean stomach fullness of cod over time, shown as lines for different size categories. The fullness is expressed as a percentage of cod body weight and falls 1.5 and 3 % in recent years.
Figure 5.13. Mean stomach fullness index for cod in the winter surveys 1984-2025.

 

Stomach content for cod < 20 cm shown as bar plot filled with percent mean stomach content composition (different prey). Stomachs in 2025 contained less capelin and herring, but more shrimp, amphipods and other invertebrates compared to 2024.
Figure 5.14. Diet composition for cod <20 cm in the winter surveys 2014-2025, % by weight.

 

Stomach content for cod 20-34 cm shown as bar plot filled with percent mean stomach content composition (different prey). Stomachs in 2025 contained less capelin and herring, but more cod and invertebrates compared to 2024.
Figure 5.15. Stomach content composition for cod 20-34 cm in the winter surveys 2014-2025, % by weight.

 

Stomach content for cod 35-49 cm shown as bar plot filled with percent mean stomach content composition (different prey). Stomachs in 2025 were dominated by capelin prey as usual, at a level similar to 2024. Stomachs contained less krill and shrimp and more of the category 'other invertebrates', as well as more haddock and less cod, compared to 2024.
Figure 5.16. Stomach content composition for cod 35-49 cm in the winter surveys 2014-2025, % by weight.

 

Stomach content for cod > 50 cm shown as bar plot filled with percent mean stomach content composition (different prey). Stomachs in 2025 contained less capelin (just below 50 % which is the lowest in the years 2014-2025 shown in the graph) and much more haddock compared to 2024. There was also less cod in the 2025 stomachs.
Figure 5.17. Stomach content composition for cod >=50 cm in the winter surveys 2014-2025, % by weight.

 

6 - Distribution and abundance of haddock

6.1 - Acoustic estimation

The survey covers best the immature part of the haddock stock. At this time of the year an unknown proportion of the mature haddock (age 6 and older) is on its spawning migration south-westwards out of the investigated area. In some earlier years, e.g., 2004 and 2005, concentrations of mature haddock have been observed pelagically rather far above bottom along the shelf edge. The bottom trawl sampling poorly covers these concentrations. There are indications that the distribution of age groups 1 and 2 in some years are concentrated in coastal areas not well covered by the survey. This occurred in the late 1990s and will have strongest effect on estimates of abundance of the poor year-classes. In the later surveys, small haddock have been widely distributed, and the strong year-classes have been found unusually far to the north. Favourably hydrographic conditions and/or density dependent mechanisms might cause this. However, it is difficult to separate the two factors.

Figure 6.1 shows the spatial distribution of acoustic registrations assigned to haddock in 2026. The registrations reflect the general distribution of haddock in the southern and eastern Barents Sea. The registrations were highest in the south-eastern Barents Sea.

Acoustic registrations of haddock shown on map of the survey area. Highest registrations found in south-eastern parts as usual. Little to no registrations in central and central-eastern parts. Some registrations west of Svalbard.
Figure 6.1. HADDOCK NASC. Distribution of acoustic backscatter (m2/nmi2 ) assigned to haddock in 2026. The black lines without yellow circles represent parts of the cruise track where the acoustic backscatter was scrutinized but not assigned to haddock. Red circles indicate NASC >500. NASC values < 5 was set to zero for this illustration.

 

The acoustic abundance indices by age and the main areas in 2026 are presented in Table A6.1. The highest registrations of haddock were in main areas D which includes strata 7-12. The full time series is presented in Table A6.2 and Figure 6.2. Abundance of age 1 in 2026 decreased compared to 2025. The 2025 age 1 acoustic index was the highest recorded. Abundance of fish older than 5 was low.

Acoustic survey index for haddock shown as bar plot of age-specific indices stacked on top of each other. Good recruitment caused spikes in the index of 1-yearolds in 2017-2018 and 2025. 2026 indices are more average compared to recent years.
Figure 6.2. HADDOCK abundance (acoustic indices) 1994-2026. The different colours represent the ages from 1 to 8+. The dashed vertical line indicates 2014 when the survey area was extended to include main area N.

The year classes 2016 and 2017 have high indices at age 1-2. The year class 2019 appears to be much weaker as the abundance of 1-year-olds observed in 2020 is the third lowest in the time series, and the weakest in the time series at ages 2, 3,4 and 5. Abundance of the 2020 year-class, while still low, is still almost 7 times higher than the 2019 year-class as 3 year olds. The 2021 year-class index is much higher and above average in the time series, whereas the 2024 year-class appear to be very strong as 1-year olds, but not as strong at age 2. The 2025 year -class acoustic index is close to average.

Table A 6.4 presents estimated coefficients of variation (CV) for haddock age groups 1-14. In most years, CVs for age groups older than 8 years are above what could be considered as acceptable (approximately 20 %). In 2025, the CVs for ages 9+ were considerably higher than 20%.

6.2 - Swept area estimation

Figures 6.3 - 6.6 show the geographic distribution of bottom trawl catch rates (number of fish per NM 2 ) for haddock size groups < 20 cm, 20-34 cm, 35-49 cm and ≥ 50 cm. Like in previous years, the distribution extends further to the north and to the east than what was usual in the 1990s. The catches north of smaller haddock Svalbard are unusually far north, but the same was observed last year. This area is outside the strata system for the winter survey and cannot be surveyed every year due to ice.

Table A6.5 presents the indices for each age group by main areas.

Distribution of haddock < 20 cm based on bottom trawl catches. Highest catches found west of Svalbard and in the central-southern Barents Sea.
Figure 6.3. HADDOCK < 20 cm. Distribution in valid bottom trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

 

Distribution of haddock 20-34 cm based on bottom trawl catches. Highest catches found in the central-eastern Barents Sea.
Figure 6.4. HADDOCK 20-34 cm. Distribution in valid bottom trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

 

Distribution of haddock 34-49 cm based on bottom trawl catches. Highest catches found in the southern-eastern Barents Sea.
Figure 6.5. HADDOCK 35-49 cm. Distribution in valid bottom trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

 

Distribution of haddock > 50 cm based on bottom trawl catches. Highest catches found in the southern-eastern Barents Sea.
Figure 6.6. HADDOCK ≥ 50 cm. Distribution in valid bottom trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

The full time series is shown in Table A6.6 and Figure 6.7. The swept area estimates, too, are highest in the east in area D. The weak 2019 year-class noted for the acoustic index is evident also in the swept area estimates. Overall, this survey tracks both strong and poor year-classes fairly well.

Bottom trawl survey index for haddock shown as stacked bar plot of age-specific indices for each year since 1995. 2026 total indices were similar to 2024  but considerably lower than 2025 because of lower age 1 index.
Figure 6.7. HADDOCK abundance (swept area indices) in winter surveys 1994-2026. The different colours represent the ages 1-9+. The dashed vertical line indicates 2014 when the survey area was extended to include main area N.

Table A6.8 presents estimated coefficients of variation (CV) for haddock age groups 1-14. CVs tend to by higher for less abundant ages/year-classes. In most years, CVs for age groups older than 7 years are above what could be considered as acceptable (approximately 20 %) . In 2026, CVs were higher than 28% for age 6+, also high (26%) for the age 4.

6.3 - Survey mortalities

Survey mortalities based on the acoustic and swept area indices (Table A 6.9, Figure 6.8) have varied between years, and for most age groups there are no obvious trends. However, there are signs of co-variability within years. In 2026, it is notable that survey mortalities increased for the youngest ages. The survey mortality for the 2019-year class from 2025 to 2026 was negative.

Survey mortality for acoustic survey for haddock. Mortalities went up for most ages from 2024-2025 to 2025-2026, except for ages 6-7 which was negative, meaning more of this age class was measured in 2026 compared to 2025.

 

Survey mortality for bottom trawlsurvey for haddock. Mortalities went up for ages 1-2 and 2-3 from 2024-2025 to 2025-2026 and down for almost other ages. Survey mortality for age 6-7 was negative, meaning more of this age class was measured in 2026 compared to 2025.
Figure 6.8. HADDOCK, survey mortalities in winter surveys 1994-2026. Top: acoustic indices. Bottom: swept area indices.

 

6.4 - Growth and maturity

Tables A 6.10 and Figure 6.9 present the time series for mean length. Table A 6.11 and Figure 6.10 present mean weight at age. Length and weight estimates have been quite variable over time. In 2026, the length of all ages except 2 and 7 has declined. The same patterns can also be seen in the weights. The weight increments are shown in Figure 6.11. Growth has declined from 2025 to 2026, compared to from 2024 to 2025 for all ages except growth from age 1 to age 2 and from age 2 to age 3.

mean length at age for haddock shown as lines for each age over time. Length went up for age 7 compared to 2025 and down for ages 4-6.
Figure 6.9. HADDOCK, mean length (cm) by age in winter surveys 1994-2026. Yellow diamonds indicate ages with < 5 individuals sampled.

 

Mean weight at age for haddock shown as lines for each age over time. Weight at ages 4-6 and 8-9 went down compared to 2025, which weight of age 7 went slightly up.
Figure 6.10. HADDOCK, mean weight (kg) by age in winter surveys 1994-2026. Yellow diamonds indicate ages with < 5 individuals sampled.

 

Growth of haddock was much lower in 2025-2026 for most ages compared to 2024-2025 and other recent years.
Figure 6.11. HADDOCK, annual weight increments.

The proportion mature at age also shows large variations between years (Table A 6.13, Figure 6.12). The estimates from 2015 seems particular deviant. In the haddock stock assessment, length, weight and maturity at age are modelled from the empirical data to account for inconsistencies due to high sampling variance and to fill in missing age-year combinations. The assessment input data for these variables therefore differ from what presented here. The degree of coverage of the Russian Exclusive economic zone (EEZ) may influence the biological parameters, as body size tends to decrease towards the northeast in the survey area. In addition, length, weight and maturity at age of older ages has higher uncertainty due to fewer samples.

Maturity ogives by year for haddock. 2026 values were on the higher end, but difficult to see clear trends as maturity is quite variable between years.
Figure 6.12 HADDOCK, proportion mature at age. Yellow diamonds indicate ages with < 5 individuals sampled.

 

7 - Distribution and abundance of redfish

Earlier reports from this survey (before 2003) have presented distribution maps and abundance indices based on acoustic observations of redfish. In later years, blue whiting has dominated the acoustic records in some of the main redfish areas. Due to incomplete pelagic trawl sampling, the splitting of acoustic records between blue whiting and redfish has been very uncertain, and these species categories are therefore no longer differentiated in the acoustic scrutinization. Results on redfish are therefore presented here based on bottom trawl catches only.

7.1 - Golden redfish (Sebastes norvegicus)

Figure 7.1 shows the geographical distribution of golden redfish in the survey area based on the catch rates in the bottom trawl. In most years, the distribution is completely covered except towards the northwest. Figure 7.2 and Table A7.1 presents the time series (1994-2026) of swept area indices by 5 cm length groups for the standard area (strata 1-23). The relatively high abundances in the mid 1990’s was followed by a prolonged period of weak year classes and poor recruitment. The 2006 and 2007 year classes were seemingly strong due to a high number of fish < 15 cm in 2008. From 2011, the stock index gradually improved as seen by an increase of fish in the younger size classes, followed by an expansion in the mid-size classes between 2017 and 2022, whereas in 2019 the total abundance and biomass were the highest since 1998. In 2021, the abundance of fish < 20 cm was particularly low, but the 2021 year class appears to have been strong since the number of <10 cm fish in 2022 was the highest in the series and the numbers in the 15-19 cm length class in 2024 was the highest since 1995, followed by high numbers in the 20-25 cm length class in 2025. In 2026, the biomass and abundance were slightly lower than in 2025.

Table A7.2 presents swept area abundance indices by length groups for area N in 2014-2026. Golden redfish was found in this extended survey area in 2014-2026, mainly west of Spitsbergen (strata 24). 15% of the total abundance and 8.5 % of total biomass was found in the extended area in 2026. Table A7.3 presents estimates of coefficients of variation (%) by length groups. The CVs for most length groups are consistently above what could be considered as acceptable in stock assessment (approximately 20 %).

test
Figure 7.1. GOLDEN REDFISH (Sebastes norvegicus). Distribution in the trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

 

 

Swept area abundance index for golden redfish shown as age-specific indices stacked in bars for each year. Indices in 2026 was similar to recent years and at a moderate level.
Figure 7.2. GOLDEN REDFISH (Sebastes norvegicus). Abundance indices (numbers in thousands) from bottom trawl surveys in the Barents Sea standard area winter 1994-2026.

 

7.2 - Beaked redfish (Sebastes mentella)

Figure 7.3 shows the geographical distribution of beaked redfish in the survey area based on the catch rates in bottom trawl. Figure 7.4 and Table A7.4 presents the time series (1994-2026) of swept area abundance indices by 5 cm length group for beaked redfish in the standard area (strata 1-23), while Table A7.5 present indices for new strata 24-26 in 2014-2026.

In the late 1990’s and early 2000’s, the index was low and unstable, due to poor recruitment, but since 2008, there have been a few strong recruitment events and a moderately high and stable abundance of beaked redfish. In 2015 and 2016, the estimated indices for 20-35 cm beaked redfish were among the highest in the time series, and in 2017 the indices for 30-39 cm beaked redfish were the highest in the time series. The 2020, year class, appears to have been strong as the 2021 estimate of fish < 10 cm, the 2022-2023 estimate of 10-15 cm fish and the 2024 estimate of 15-19 cm fish were the highest in the time series. In 2026, the highest number of fish were in the 20-24 cm class.

In the extended area, 2026 had the highest catches of fish <10 cm since it was included in 2014. The coverage of the beaked redfish distribution was not complete west and north of Spitsbergen (Fig. 7.3). The extended survey area in 2026 contributed about 9.9% of the total abundance index.

Table A7.6 presents estimates of coefficients of variation (%) by length groups. In most years, CVs for length groups between 10 and 29 cm are at a level that could be considered as acceptable for stock assessment, and in most recent years up to 44 cm.

Distribution of beaked redfish catches in 2026. Main catches were taken in the deeper through in the central-western Barents Sea.
Figure 7.3. BEAKED REDFISH (Sebastes mentella). Distribution in the trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

 

Swept area abundance index by length group for beaked redfish. The total index was similar to 2024 and 2025 and contained a higher proportion of medium-sized fish.
Figure 7.4. BEAKED REDFISH (Sebastes mentella). Abundance indices (numbers in millions) from bottom trawl surveys in the Barents Sea standard area in winter 1994-2026.

 

7.3 - Norway redfish (Sebastes viviparus)

Figure 7.5 shows the geographical distribution of Norway redfish in 2026. Figure 7.6 and Table A7.7 presents the time series (1994-2026) of swept area indices by 5 cm length groups in the standard area (strata 1-23). Almost all Norway redfish are found in areas ABCD, mainly in main area B, and very few in the extended survey area (Table A7.8). In 2021, the smallest fish (< 10 cm) were found in the extended survey area for the first time.

A few large catches and recruitment events seem to drive the indices for Norway redfish. After a prolonged period of low catches in the 2000’s, the index has been steadily high since 2014, with two large year classes in 2013 and 2022.

The 2022 cohort provides high numbers in sequential size classes in subsequent years. The total abundance was at its highest in 2021, driven by high abundance of 15-24 cm fish.

Table A7.9 presents estimates of coefficients of variation (%) by length groups. In most years, CVs for most length groups are far above what could be considered as acceptable for stock assessment.

Distribution of Norway redfish catches in 2026. This species was caught almost exclusively in the south-westernmost parts of the survey area.
Figure 7.5. NORWAY REDFISH (Sebastes viviparus). Distribution in the trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

 

Swept area abundance index for Norway redfish. Total index in 2026 was a bit higher than in 2025 and at the generally higher level seen since 2014.
Figure 7.6. NORWAY REDFISH (Sebastes viviparus). Abundance indices (numbers in thousands) from bottom trawl surveys in the Barents Sea standard area winter 1994-2026.

 

8 - Distribution and abundance of Greenland halibut

Figure 8.1 shows the distribution of bottom trawl catch rates of Greenland halibut. The most important distribution areas for the adult fish (depths between 500 and 1000 m along the western slope), are not covered by this survey. The observed distribution pattern in 2026 was similar to those observed in previous years’ surveys, with highest abundances in the Bear Island trench and around Svalbard.

Distribution of Greenland halibut based on bottom trawl catches in 2026. Highest densities were found in the northern-central parts of the survey area, particularly in the west but the species was also caught further east. This species is found also in ice-covered areas.
Figure 8.1. GREENLAND HALIBUT. Distribution in the trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

The time series (1994-2026) of swept area abundance indices by 5 cm length groups in the standard area is presented in Table A8.1 and Figure 8.2. The abundance indices were lower in the early 2000’s but increased after 2005 and have remained at a higher level since then, with a peak in 2015. After decreasing indices from 2016-2018, there has been an increase in abundance indices. The abundances from 2023 and on, are at an all-time high, mainly due to an increase in abundance of length groups 30-34 and 35-39 cm.

Swept area abundance indices for different length groups of Greenland halibut, stacked on top of each other by year to form a time series. The total index in 2026 increased from 2025 and is at an all-time high, reflecting increased abundance of <40 cm fish.
Figure 8.2. GREENLAND HALIBUT. Abundance indices (numbers in thousands) from bottom trawl surveys in the Barents Sea standard area winter 1994-2026.

Swept area abundance indices by length groups for the new strata (24-26) in 2014-2026 are presented in table A8.2. The abundance index for the new strata has shown considerably variability over the years, with several sharp rises and falls. It showed an increasing trend up to 2022, when it peaked at an all-time high (at that time), followed by a near all-time low in 2023. In 2024, the index rebounded to a new all-time high, primarily driven by a surge in fish under 25 cm in length. This upward trend continued into 2025, setting yet another record high abundance. The 2026 index is much lower than the two previous years, comparable to the lower values in the time-series.

Table A8.3 presents estimates of coefficients of variation (%) for length groups. In most years, only CVs for length groups between 40 and 65 cm are at a level that could be considered as acceptable for stock assessment.

9 - Distribution and abundance of capelin, polar cod and blue whiting

9.1 - Capelin

Although capelin is primarily a pelagic species, small amounts of capelin are normally caught in the bottom trawl throughout most of the investigated area. In Figure 9.1 catch rates of capelin smaller and larger than 14 cm are shown for the winter survey in 2026. Capelin smaller than 14 cm during this period will mainly comprise the immature stock component, while the larger capelin constitutes the pre-spawning capelin stock. We do not present swept area-based indices for capelin since it is uncertain how estimates from demersal trawl reflects the capelin stock which is mainly distributed in the pelagic, and there is no method established in the estimation for handling exceptionally large catches occurring in the demersal trawl (ICES, 2023).

At this time of the year, maturing capelin have started their approach to the spawning areas along the coast of Troms, Finnmark and the Kola peninsula, while immature capelin will normally be found further north and east, in the wintering areas. This is reflected on the maps of capelin distribution, even though some large capelin is always found north of 75°N, and smaller capelin are found sporadically in near-coastal areas. The geographical coverage of the capelin stock is incomplete, but the maturing component is probably better covered than the immature.

9.2 - Polar cod

Polar cod are not well represented in the trawl hauls conducted during the winter surveys (Figure 9.2). This is because this endemic arctic species has a more northern and eastern distribution in the Barents Sea than the area covered by the survey. During this time of the year, polar cod are known to be spawning under the ice in the Pechora Sea, close to Novaya Zemlya archipelago and around Svalbard. It is not clear whether the concentrations found in open water at this time of the year are maturing fish either on their way to spawning or from the spawning areas, or if this is immature fish. In 2026, the observed distribution of polar cod stretched almost along the entire ice edge and continued along the west and north coast of Svalbard/Spitsbergen, in a similar manner as in 2025.

Distribution map of capelin of two size classes. The smaller fish (<14 cm, assumed immature) were distributed mainly in the northern parts of the survey area as usual, while larger fish (>=14 cm, assumed mature) were found in the central-southern parts.
Figure 9.1. CAPELIN. Distribution based on trawl catches in the winter survey 2026 (number per nm2) for immature capelin (<14 cm; beige circles, appearing green when placed on top of blue) and maturing capelin (≥14 cm; blue circles). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

 

Distribution of polar cod based on bottom trawl catches. Highest catches found in northern parts of survey area, from west of Svalbard to the easternmost strata.
Figure 9.2. POLAR COD. Distribution in the trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey.

 

9.3 - Blue whiting

The distribution of blue whiting in the Barents Sea has varied between yeas and the distribution of bottom trawl catch rates in 2026 is given in Figure 9.3.1. Blue whiting showed a similar distribution as in the most recent years. Since the fish is mainly found pelagically, the bottom trawl does not reflect the real density distribution but gives some indication of the distribution limits. Acoustic observations would better reflect the relative density distribution. The number of pelagic hauls has, however, been too low to properly separate the pelagic recordings. During the years with high abundance of blue whiting, dense concentrations of blue whiting might have masked recordings of pelagic redfish, haddock and small cod.

Figure 9.3.2 and Table A9.1 shows the bottom trawl swept area estimates by 5 cm length groups for the years 1994-2026. High abundance of fish below 20 cm in several years, e.g., 2001, 2004, 2012, 2015, and 2021 reflects abundant recruiting year-classes (age 1). The distribution of blue whiting in the Barents Sea reflects mostly abundance of younger age groups, i.e., when there are strong year-classes coming into the stock they are seen in the winter survey in the Barents Sea as 1-group the year after. The 2014 year-class is very strong, and this is reflected in the survey in 2015 as fish smaller than 20 cm. 2020 and 2021 year-classes are also regarded as very strong. The 2025 year-class is above median in the time series, thus this gives the first indication of a stronger 2025 year-class of blue whiting.

Relatively high abundance of blue whiting was found in the extended survey area the last years, similar to the situation with abundant recruiting year-classes (Table A9.2). Table A9.3 presents estimates of coefficients of variation (%) by length groups. In most years, CVs for most length groups are above what could be considered as acceptable for stock assessment.

Distribution of blue whiting based on bottom trawl catches. This species is only found in the western parts of the survey area, mainly in the southern-central parts but also west of Svalbard.
Figure 9.3. BLUE WHITING. Distribution in the trawl catches in winter survey 2026 (number per nm2). Black crosses indicate zero catches and the shaded area the ice coverage early in the survey .

 

swept area abundance index for blue whiting shown as stacked indices by length group for each year. The total index in 2026 was similar to 2025 and further indicated a fairly good 2025 year-class.
Figure 9.4. BLUE WHITING. Time series of total bottom trawl abundance at length for blue whiting (1994-2026). The dotted line separates the periods before and after the survey area was extended to include also area N.

 

10 - References

Aglen, A. and Nakken, O. 1997. Improving time series of abundance indices applying new knowledge. Fisheries Research, 30: 17-26.  

Aglen, A., Dingsør, G., Mehl, S., Murashko, P.  and Wenneck, T. de L. 2012. Results from the Joint IMR-PINRO Barents Sea demersal fish survey 21 January – 15 March 2012. WD #3 ICES Arctic Fisheries Working Group, Copenhagen, Denmark 20-26 April 2012.  

Aschan, M. and Sunnanå, K. 1997. Evaluation of the Norwegian shrimp surveys conducted in the Barents Sea and Svalbard area 1980-1997. ICES C M 1997/Y:07. 24pp.  

Bogstad, B., Fotland, Å. and Mehl, S. 1999. A revision of the abundance indices for cod and haddock from the Norwegian winter survey in the Barents Sea, 1983-1999. Working Document, ICES Arctic Fisheries Working Group, 23 August - 1 September 1999.  

Dalen, J. and Nakken, O. 1983. On the application of the echo integration method. ICES CM 1983/B: 19, 30 pp.  

Dalen, J. and Smedstad, O. 1979. Acoustic method for estimating absolute abundance of young cod and haddock in the Barents Sea. ICES CM 1979/G:51, 24pp.  

Dalen, J. and Smedstad, O. 1983. Abundance estimation of demersal fish in the Barents Sea by an extended acoustic method. In Nakken, O. and S.C. Venema (eds.), Symposium on fisheries acoustics. Selected papers of the ICES/FAO Symposium on fisheries acoustics. Bergen, Norway, 21-24 June 1982. FAO Fish Rep., (300): 232-239.  

Dickson, W. 1993a. Estimation of the capture efficiency of trawl gear. I: Development of a theoretical model. Fisheries Research 16: 239-253.  

Dickson, W. 1993b. Estimation of the capture efficiency of trawl gear. II: Testing a theoretical model. Fisheries Research 16: 255-272.   

Dolgov, A. V., Yaragina, N.A., Orlova, E.L., Bogstad, B., Johannesen, E., and Mehl, S. 2007. 20 th anniversary of the PINRO-IMR cooperation in the investigations of feeding in the Barents Sea – results and perspectives. Pp. 44-78 in ‘Long-term bilateral Russian-Norwegian scientific cooperation as a basis for sustainable management of living marine resources in the Barents Sea.’ Proceedings of the 12th Norwegian- Russian symposium, Tromsø, 21-22 August 2007. IMR/PINRO report series 5/2007, 212 pp.   

Engås, A. 1995. Trålmanual Campelen 1800. Versjon 1, 17. januar 1995, Havforskningsinstituttet, Bergen. 16 s. (upubl.).  

Engås, A. and Godø, O.R. 1989. Escape of fish under the fishing line of a Norwegian sampling trawl and its influence on survey results. Journal du Conseil International pour l'Exploration de la Mer, 45: 269-276  

Engås, A. and Ona, E. 1993. Experiences using the constraint technique on bottom trawl doors. ICES CM 1993/B:18, 10pp.  

Fall, J. 2020. NEA cod and haddock indices from the Barents Sea winter survey 2020. Working Document # 10 Arctic Fisheries Working Group, ICES HQ (via webex), Copenhagen, Denmark, 16-22 April 2020  

Foote, K.G. 1987. Fish target strengths for use in echo integrator surveys. Journal of the Acoustical Society of America, 82: 981-987.  

Godø, O.R. and Sunnanå, K. 1992. Size selection during trawl sampling of cod and haddock and its effect on abundance indices at age. Fisheries Research, 13: 293-310.  

Howell et al. 2024. Report of the Joint Russian-Norwegian Arctic Fisheries Working Group (JRN-AFWG). IMR. PINRO 2024-7. https://www.hi.no/hi/nettrapporter/imr-pinro-en-2024-7

ICES 2012. ICES. (Aglen, A., Bogstad, B., Dingsør, G.E., Gjøsæter, H., Hallfredsson, E.H., Mehl, S., Planque, B. et al.) 2012. Report of the Arctic Fisheries Working Group, ICES Headquarters, Copenhagen 20-26 April 2012. ICES CM 2012/ACOM: 05. 633 pp.  

ICES. 2020. Benchmark Workshop for Demersal Species (WKDEM). ICES Scientific Reports. 2:31. 136 pp. http://doi.org/10.17895/ices.pub.5548  

ICES. 2021. Benchmark Workshop for Barents Sea and Faroese Stocks (WKBARFAR). ICES Scientific Reports. 3:21. 2015 pp. https://doi.org/10.17895/ices.pub.7920  

ICES 2023. Benchmark workshop on capelin (WKCAPELIN). ICES Scientific Reports. 5:62. 282 pp. https://doi.org/10.17895/ices.pub.23260388

Jakobsen, T., Korsbrekke, K., Mehl, S. and Nakken, O. 1997. Norwegian combined acoustic and bottom trawl surveys for demersal fish in the Barents Sea during winter. ICES CM 1997/Y: 17, 26 pp.  

Johannesen, E., Wenneck, T. de L., Høines, Å., Aglen, A., Mehl, S., Mjanger, H., Fotland, Å., Halland, T. I. and Jakobsen, T. 2009. Egner vintertoktet seg til overvåking av endringer i fiskesamfunnet i Barentshavet? En gjennomgang av metodikk og data fra 1981-2007. Fisken og Havet nr. 7/2009. 29s.  

Johnsen, E., Totland, A., Skålevik, Å., Holmin, A. J., Dingsør, G. E., Fuglebakk, E., & Handegard, N. O. (2019). StoX: An open source software for marine survey analyses. Methods in Ecology and Evolution, 10(9), 1523-1528.  

Jolly, G. M., & Hampton, I. (1990). A stratified random transect design for acoustic surveys of fish stocks. Canadian Journal of Fisheries and Aquatic Sciences, 47(7), 1282-1291.  

Knudsen, H.P. 1990. The Bergen Echo Integrator: an introduction. - Journal du Conseil International pour l’Exploration de la Mer, 47: 167-174.  

Korneliussen, R. J., Heggelund, Y., Macaulay, G. J., Patel, D., Johnsen, E., & Eliassen, I. K. (2016). Acoustic identification of marine species using a feature library. Methods in Oceanography, 17, 187-205.  

Korsbrekke, K. 1996. Brukerveiledning for TOKT312 versjon 6.3. Intern program dokumentasjon., Havforskningsinstituttet, september 1996. 20s. (upubl.).  

Korsbrekke, K., Mehl, S., Nakken, O. og Sunnanå, K. 1995. Bunnfiskundersøkelser i Barentshavet vinteren 1995. Fisken og Havet nr. 13 - 1995, Havforskningsinstituttet, 86 s.  

MacLennan, D.N. and Simmonds, E.J. 1991. Fisheries Acoustics. Chapman Hall, London, England. 336pp.  

Mehl, S., Aglen, A. and Johnsen, E. 2016. Re-estimation of swept area indices with CVs for main demersal fish species in the Barents Sea winter survey 1994-2016 applying the Sea2Data StoX software. Fisken og havet 10/2016. Institute of Marine Research, Bergen, Norway. 43 pp.  

Mehl, S., Aglen, A., Johnsen, E. and Skålevik, Å. 2018. Estimation of acoustic indices with CVs for cod and haddock in the Barents Sea winter survey 1994 – 2017 applying the Sea2Data StoX software. Fisken og havet no. 5-2018. ISSN 0071-5638. Institute of Marine Research, Bergen, Norway. 29 pp.  

Mehl, S. and Yaragina, N.A. 1992. Methods and results in the joint PINRO-IMR stomach sampling program.  Pp. 5-16 in Bogstad, B. and Tjelmeland, S. (eds.): Interrelations between fish populations in the Barents Sea. Proceedings of the fifth PINRO-IMR Symposium, Murmansk, 12-16 August 1991. Institute of Marine Research, Bergen, Norway.  

Mjanger, H., Svendsen, B.V., Fuglebakk, E., Skage, M.L., Diaz, J, Johansen, G.O., Vollen, T, Bruck, S. A., and Gundersen, S. 2021. Handbook for sampling fish, crustaceans and other invertebrates. Version 16.00. October 2021. Ref.id.: FOU.SPD.HB-05, Institute of Marine Research. 146 pp.  

Totland, A. and Godø, OR. 2001. BEAM – an interactive GIS application for acoustic abundance estimation. In T. Nishida, P.R. Kailola and C.E. Hollingworth (eds.): Proceedings of the First Symposium on Geographic Information System (GIS) in Fisheries Science. Fishery GIS Research Group. Saitama, Japan.  

11 - Appendix 1. Data tables

11.1 - Area covered and biological samples

  Main Area     Extrapolated area
Year A B C D D' E S N Total excluding N
1981-92 23299 8372 5348 51116 - - -   88135  
1993 23929 8372 5348 51186 23152 8965 16690   137642  
1994 27180 9854 5165 53394 36543 11417 17557   161110  
1995 26797 9854 5165 53394 58605 13304 24783   191904  
1996 26182 9854 5165 53394 54047 5738 11809   166190  
19971 27785 9854 5165 23964 2670 0 18932   88371 56200
19981 27785 9854 5165 23964 5911 3829 23931   100440 51100
1999 27785 9854 5165 43230 8031 5742 18737   118545  
2000 27173 9854 5165 52314 29438 14207 25053   163204  
2001 26609 9854 5165 53394 29694 15777 24157   164652  
2002 26594 9854 5165 53394 21914 15757 24689   157369  
2003 26621 9897 5165 52072 23947 6259 23400   147361  
2004 27785 9854 5165 53394 42731 4739 20760   164428  
2005 27785 9854 5165 53394 39104 19931 24648   179883  
20062 27785 9854 5165 53394 35302 13872 24691   170064 18100
20071 27785 9854 5165 23911 8498 20822 27858   123894 56700
2008 27785 9854 5165 53394 23792 18873 26313   165176  
2009 27785 9854 5165 53394 31978 15739 27858   171774  
2010 27785 9854 5165 53394 17882 18562 27858   160501  
2011 27785 9854 5165 53394 33432 16835 27858   174324  
20122 27785 9854 5165 53394 9917 17289 27858   151263 16700
2013 27785 9854 5165 53394 58183 21118 27858   203358  
20143 27785 9854 5165 53394 54800 29897 27858 58048 208754  
2015 27785 9854 5165 53394 45449 26541 27858 47263 196047  
2016 27785 9854 5165 53526 29266 20342 27630 54387 173568  
20172 27785 9854 5165 45493 12223 18524 27858 38786 146903 37460
2018 27785 9854 5165 53394 45193 23095 27630 44186 192117  
2019 27785 9854 5165 53394 56452 26788 27630 34035 207121  
20202 27785 9854 5165 53394 47002 11475 26881 21614 181557 25148
20212 27785 9854 5165 52848 33050 26897 27630 48777 183230 10933
2022 27785 9854 5165 53395 44972 26897 26095 27630 206631  
2023 27785 9854 5165 53394 60456 26897 42069 27630 211181  
2024 27785 9854 5165 53394 63546 26897 39148 27630 214271  
2025 27785 9854 5165 53394 40139 26897 27630 41242 190865  
2026 27785 9854 5165 53394 63546 30254 27630 34789 217628  

Table A1.1. Area (nm2) covered in the bottom trawl surveys in the Barents Sea winter 1981-2023. 1994-2026 are StoX estimates.

1 Russian EEZ not covered. 2 Russian EEZ not completely covered (Strata 7 and 13 in 2006, Area D’ in 2012, strata 7, 13, 15, 7 and 20 in 2017, strata 17, 19, and 20 in 2020, and strata 16, 19, and 20 in 2021). 3 Additional northern areas (N) covered from this year.


Year Cod Haddock Golden redfish Beaked redfish Greenland halibut Blue whiting Capelin Polar cod
L A L A L L L L L A L
1994 57290 3400 40608 1808 3157 12389 525        
1995 66264 3547 37775 1692 3785 9622 583        
1996 61559 3304 34497 1416 2510 10206 587        
1997 35381 2381 30054 1003 5429 10997 675        
1998 39044 2843 12512 859 1739 9664 649        
1999 22971 2321 12752 926 1266 6677 397        
2000 31543 2871 25881 1426 1161 8739 546   9172 1860 3702
2001 36789 2998 30921 1657 1173 7323 499   8079 2402 5955
2002 45399 3730 58464 2057 1143 6660 688   10643 2387 7283
2003 59573 2857 54838 1883 1102 4654 657   10390 1742 2510
2004 40851 3175 51705 1874 1438 5507 459   11633 1994 6080
2005 33582 3216 67921 2060 835 5166 832   12482 1892 6052
2006 19319 2683 23611 1899 728 3356 962   6851 2232 1362
2007 16556 2954 26610 2023 798 4544 973 4657 5475 1186 203
2008 26844 3809 50195 2490 897 8568 1020 1350 13772 886 3166
2009 22528 3486 40872 2433 455 9205 807 891 7636 776 617
2010 30209 4085 35881 2367 429 8564 984 626 12337 1189 551
2011 26913 3959 29180 2260 286 6885 607 105 11073 829 1492
2012 17139 3020 33524 1854 574 5721 354 2441 11047 1256 601
2013 14525 2451 19142 1671 479 6087 263 1091 15962 1591 3517
2014 22624 4501 35940 2586 563 9310 444 1846 32811 3647 6879
2015 25401 3795 18483 2038 395 8933 541 1991 15578 300 408
2016 16636 3368 25423 2067 614 8668 425 2396 11423 150 681
2017 12402 2851 15689 1955 576 8898 448 4799 5140 671 578
2018 42462 5178 43294 3307 1211 11500 548 1443 16219 788 876
2019 16217 5260 15967 3072 761 8981 413 886 13771 821 748
2020 19971 3770 11047 1641 1040 11853 711 866 16801 745 1569
2021 13714 4020 15253 1950 810 11292 1076 1722 16179 1377 5567
2022 20294 4160 25161 2288 1176 9826 945 1520 18371 2072 4115
2023 11492 3472 27026 2960 696 9752 704 1571 12650 2483 793
2024 20846 4398 30125 2872 780 9448 1298 606 10667 800 2910
2025 15275 3185 17321 2169 789 5939 980 2413 7227 1027 1113
2026 15749 4058 41906 3417 762 7051 1100 1670 14660 433 5728

Table A2.1. Number of fish measured for length (L) and age (A) in the Barents Sea winter survey 1994-2026.

Age/Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1994 283 354 392 652 571 363 124 54 37 16 19 3 2 - - - - - - -
1995 409 360 461 528 714 532 268 47 16 13 8 6 - - - - - - - -
1996 304 564 359 400 462 584 384 108 23 8 6 5 3 1 - - - - - -
1997 257 322 321 224 264 310 310 108 27 5 2 - - - - - - - - -
1998 331 311 445 425 220 242 257 193 39 6 3 - 1 - 2 - - - - -
1999 250 323 365 450 334 185 159 110 38 5 1 1 1 - - - - - - -
2000 256 365 470 491 578 340 119 66 50 12 4 2 1 - - - - - - -
2001 437 259 440 544 513 484 201 44 19 13 3 - - - 1 - - - - -
2002 162 650 478 661 607 506 345 90 16 7 3 - - - 1 - - - - -
2003 246 108 545 391 434 456 304 175 48 7 3 - 2 2 - - - - - -
2004 311 493 260 599 368 407 387 254 87 17 6 1 1 - - - - - - -
2005 341 386 619 309 565 306 388 196 56 21 3 2 4 1 - - - - - -
2006 291 364 423 521 234 430 194 162 68 18 6 3 - - - - - - - -
2007 295 258 474 358 453 205 369 159 95 22 10 6 1 - - - - - - -
2008 169 366 676 866 471 532 246 300 72 17 2 1 1 - - - - - - -
2009 319 276 445 635 695 420 292 124 120 24 9 2 1 - - - - - - -
2010 429 369 292 489 571 745 371 247 93 64 25 2 2 3 - - 1 - - -
2011 373 526 484 319 436 621 677 226 76 34 14 7 4 2 1 - - - - -
2012 275 214 319 330 198 303 504 415 100 47 25 10 9 2 1 1 - - - -
2013 149 251 232 330 296 188 282 426 215 38 20 8 5 1 1 - - - - -
2014 414 301 571 387 415 341 186 368 308 89 18 12 4 1 2 1 - - - -
2015 479 413 369 589 396 457 290 173 267 176 51 11 3 2 1 - - - - -
2016 235 529 405 484 678 437 418 323 164 178 86 20 15 3 3 1 1 - - -
2017 296 248 449 299 323 494 274 191 110 44 37 33 9 7 1 1 - - - -
2018 508 762 592 901 438 491 673 338 186 91 45 51 23 4 4 3 1 - - -
2019 465 632 892 651 839 435 356 508 149 66 17 10 6 8 2 1 - - - -
2020 265 523 755 830 585 673 432 305 310 88 41 11 16 10 10 7 - - - -
2021 270 235 537 630 683 503 445 226 145 103 32 12 6 1 6 3 - - - 1
2022 709 340 293 450 550 530 460 378 128 53 28 17 7 - 7 1 1 3 1 -
2023 396 602 348 301 416 475 439 253 143 41 12 5 3 - - 2 2 - - -
2024 413 627 881 480 353 391 433 315 183 59 14 4 1 1 - - - 1 - -
2025 358 344 692 884 478 350 363 353 211 94 24 8 3 1 1 - 2 - - -
2026 374 254 290 693 947 489 329 301 217 111 38 13 1 - - - - - - 1

Table A2.2. Number of age samples from cod by age in the Barents Sea winter survey 1994-2026. Year-age combinations with < 5 aged individuals are highlighted in yellow. Abundance indices are still presented for ages with < 5 age samples but note the uncertainty level (c. f. tables A5.4 and A5.8). Biological parameters by age are presented for ages with a minimum of three age readings (c. f. tables A5.10-A5.13).

Age/Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1994 212 192 250 432 219 40 4 5 8 5 13 1 - - - - - -
1995 289 177 131 241 543 156 15 1 2 1 - 5 1 - - - - -
1996 225 236 155 106 228 343 52 9 - 1 - 2 1 - - - - -
1997 169 62 147 86 44 113 163 19 4 - - - 2 1 - - - -
1998 151 178 68 147 74 38 73 112 12 1 1 - - - 2 1 - -
1999 251 112 238 81 98 44 19 23 24 1 - 1 - - - - - -
2000 327 321 138 344 64 72 16 3 20 9 2 1 1 - - - - -
2001 388 339 430 99 315 26 23 3 3 3 8 1 2 - - 1 - -
2002 445 354 382 450 84 123 19 7 1 2 5 3 2 - - - - -
2003 376 234 154 268 298 42 32 5 3 3 3 1 1 - - - - -
2004 303 464 254 232 277 251 50 22 7 4 3 1 2 3 - - - -
2005 487 263 437 247 189 284 125 4 4 1 - - - - - - - -
2006 458 516 141 356 166 108 104 45 4 2 - 2 - - 1 1 - -
2007 422 404 372 116 257 107 51 34 15 4 2 - - - 1 - - -
2008 317 525 584 470 168 237 46 23 8 1 2 1 - - - - - -
2009 298 318 562 488 473 114 78 13 2 5 - 1 - - - - - -
2010 448 190 272 519 462 294 41 19 8 7 2 2 - - - - - -
2011 337 394 123 205 494 440 159 15 3 - - 2 1 - - - - -
2012 355 112 338 58 116 408 291 73 4 6 1 3 - - - - - -
2013 176 377 134 328 56 75 286 204 35 3 - - - - - - - -
2014 449 116 455 98 202 57 96 202 90 11 4 - - 1 - - - -
2015 429 371 88 524 81 160 43 110 123 55 6 3 1 - - - - -
2016 430 282 430 99 452 88 126 87 175 129 39 6 - 2 2 1 - -
2017 449 385 250 294 43 236 54 62 21 68 48 26 3 - - - - -
2018 704 696 596 372 424 62 160 45 44 35 56 48 19 3 - - - -
2019 644 630 679 486 211 187 39 46 14 24 7 12 8 3 - 1 - 1
2020 219 359 498 622 339 141 80 22 16 10 8 13 15 10 1 - - -
2021 439 68 244 373 501 172 51 19 5 5 4 3 6 2 - 1 - -
2022 618 301 68 243 305 437 99 16 4 4 6 - - 2 - - - -
2023 751 646 343 97 324 389 339 44 3 5 1 1 - - - - 1 -
2024 739 553 628 266 60 207 187 124 5 - 2 - - - - - - -
2025 768 478 529 667 194 50 151 131 59 4 2 - - - - - - -
2026 670 696 391 603 694 119 93 80 51 18 1 1 - - - - - -

Table A2.3. Number of age samples from haddock by age in the Barents Sea winter survey 1994-2026. Year-age combinations with < 5 aged individuals are highlighted in yellow. Abundance indices are still presented for ages with < 5 age samples but note the uncertainty level (c. f. tables A6.4 and A6.8). Biological parameters by age are presented for ages with a minimum of three age readings (c. f. tables A6.10-A6.13).

Age group Total Biomass (‘000 t)
Area 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15+
A 0.98 0.26 0.53 4.42 16.48 8.34 4.16 3.23 1.35 0.37 0.51 0.01 0.00 0.00 0.00 40.64 71.90
B 0.44 0.26 1.56 3.34 5.06 6.09 2.58 3.00 3.67 1.80 0.23 0.01 0.00 0.00 0.00 28.02 92.59
C 0.76 0.24 0.13 1.36 5.61 4.56 2.51 1.63 1.48 0.59 0.18 0.03 0.00 0.00 0.00 19.09 45.62
D 3.12 2.85 2.46 11.97 27.66 10.39 3.08 2.54 1.33 0.97 0.36 0.15 0.00 0.00 0.00 66.89 91.91
D' 1.21 0.64 0.55 1.97 2.24 1.02 0.44 0.14 0.10 0.15 0.03 0.01 0.01 0.00 0.01 8.52 8.82
E 2.84 5.76 4.11 4.66 2.54 0.54 0.22 0.22 0.06 0.02 0.02 0.00 0.00 0.00 0.00 20.98 7.16
S 22.83 4.50 6.56 18.87 16.95 4.39 1.33 1.25 0.77 0.30 0.01 0.08 0.00 0.00 0.00 77.84 43.11
N 260.94 17.87 9.45 22.48 15.69 4.41 6.48 3.50 1.69 0.20 0.10 0.15 0.00 0.00 0.00 342.95 84.98
ABCD 5.31 3.62 4.67 21.08 54.81 29.37 12.33 10.40 7.84 3.73 1.29 0.19 0.00 0.00 0.00 154.64 302.02
Sum 293.13 32.38 25.34 69.06 92.23 39.73 20.80 15.51 10.46 4.39 1.45 0.44 0.01 0.00 0.01 604.93 446.09

11.2 - Cod

Table A5.1. COD. Abundance indices (numbers in millions) for the main areas of the Barents Sea from acoustic survey winter 2026 estimated by StoX software. Bootstrap mean estimates.

Age group Total Biomass (‘000 t)4
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15+
1994 902.64 624.38 323.88 374.47 205.53 70.24 13.00 3.59 2.60 0.71 1.15 0.11 0.13 0.00 0.00 2522.43 1060.26
1995 2175.25 212.29 137.74 139.49 197.08 66.38 15.73 2.43 0.91 0.32 0.48 0.17 0.00 0.00 0.00 2948.27 665.14
1996 1826.33 271.71 99.40 89.62 111.34 82.96 22.17 2.22 0.30 0.10 0.07 0.05 0.10 0.01 0.00 2506.38 504.47
19971 1698.49 565.31 158.57 44.22 49.91 40.91 23.48 5.02 0.84 0.27 0.09 0.00 0.00 0.01 0.00 2587.12 346.39
19981 2523.56 475.15 391.16 189.79 44.87 41.22 27.85 16.06 1.81 0.50 0.04 0.00 0.00 0.00 0.06 3712.07 563.03
1999 364.84 231.51 147.62 130.29 52.03 11.93 6.94 4.13 1.47 0.24 0.01 0.03 0.01 0.00 0.00 951.05 262.81
2000 153.42 262.81 294.83 167.25 145.55 50.75 11.33 4.70 2.75 0.85 0.18 0.11 0.03 0.00 0.00 1094.56 545.52
2001 363.55 51.45 177.44 160.63 80.80 44.47 11.10 1.73 0.46 0.19 0.08 0.00 0.00 0.00 0.01 891.91 435.40
2002 19.22 209.10 61.37 106.23 98.78 52.18 20.07 2.90 0.32 0.52 0.09 0.00 0.00 0.00 0.02 570.8 428.50
2003 1505.00 52.53 306.71 116.80 124.62 116.52 37.69 10.05 1.93 0.31 0.07 0.00 0.08 0.07 0.00 2272.38 755.03
2004 161.20 117.19 33.41 85.21 32.96 28.03 18.14 5.33 1.16 0.31 0.08 0.00 0.01 0.00 0.00 483.03 244.57
2005 499.71 138.66 125.03 33.28 65.94 21.21 15.02 4.95 1.01 0.25 0.05 0.07 0.05 0.03 0.00 905.26 259.70
20062 411.21 157.95 64.77 53.82 18.35 29.52 9.50 4.90 1.28 0.20 0.13 0.30 0.00 0.00 0.00 751.93 227.27
20071 85.13 47.09 58.49 30.40 29.35 9.04 18.07 6.41 2.67 0.53 0.24 0.07 0.00 0.00 0.00 287.49 213.63
2008 50.87 94.20 199.85 288.71 116.17 72.91 21.82 14.43 2.80 0.81 0.04 0.01 0.01 0.00 0.00 862.63 822.87
2009 204.90 25.46 107.83 182.54 138.08 41.48 13.87 4.69 4.32 0.50 0.14 0.02 0.01 0.00 0.00 723.84 536.93
2010 620.25 43.56 22.82 87.98 160.16 154.39 44.56 14.57 3.90 2.89 0.94 0.11 0.12 0.09 0.01 1156.35 885.82
2011 266.00 91.00 40.36 28.32 65.20 106.97 101.80 19.76 6.11 1.70 0.92 0.25 0.15 0.09 0.02 728.65 787.82
20123 496.49 40.23 82.79 49.38 33.77 72.53 132.31 65.59 8.37 4.39 1.21 0.66 0.47 0.04 0.10 988.33 969.09
2013 313.11 89.17 60.55 84.49 72.18 47.75 98.41 130.54 55.32 5.41 4.02 1.30 0.73 0.20 0.07 963.25 1494.33
2014 1758.58 211.04 286.89 124.18 111.14 74.47 39.41 89.89 61.31 22.64 2.56 1.31 0.16 0.05 0.19 2783.82 1437.38
2015 1903.54 211.41 138.71 235.58 128.80 140.36 80.55 35.07 53.80 24.38 7.91 0.80 0.13 0.05 0.01 2961.1 1469.58
2016 240.80 201.89 56.29 76.91 119.38 64.84 50.17 25.80 13.49 17.83 7.35 2.15 0.72 0.22 0.10 877.94 873.17
20173 439.40 73.30 111.54 42.35 44.25 65.30 35.75 24.31 11.97 4.00 2.88 3.15 0.67 0.19 0.11 859.17 680.62
2018 2057.60 280.29 109.03 149.94 53.40 54.93 66.09 34.35 10.78 6.27 1.73 2.25 1.50 0.15 0.23 2828.54 883.80
2019 1437.21 362.38 203.63 125.42 144.06 60.98 34.99 37.86 9.64 3.47 0.55 0.32 0.18 0.28 0.24 2421.21 842.03
20203 92.68 157.92 117.32 117.32 81.36 90.60 42.35 26.57 21.41 6.23 1.75 0.67 0.66 0.51 0.89 758.24 809.18
20213 45.92 28.51 64.86 59.08 55.48 38.54 30.80 12.41 6.32 4.67 2.17 0.29 0.18 0.00 0.21 349.45 400.67
2022 524.71 43.42 29.42 52.98 56.69 47.05 42.94 27.77 7.85 2.44 1.51 0.94 0.18 0.00 0.28 838.17 519.36
2023 244.43 103.24 28.66 26.54 33.54 33.83 23.81 12.62 7.08 1.58 0.33 0.11 0.04 0.00 0.08 515.90 319.74
2024 328.44 200.98 150.72 50.97 29.34 27.31 28.25 18.83 11.29 3.82 0.43 0.12 0.02 0.05 0.01 850.58 422.36
2025 198.95 106.07 130.40 153.29 54.85 27.37 23.40 19.65 8.96 3.39 0.92 0.33 0.09 0.01 0.08 727.76 470.56
2026 293.13 32.38 25.34 69.06 92.23 39.73 20.80 15.51 10.46 4.39 1.45 0.44 0.01 0.00 0.01 604.93 446.09

 

Table A5.2. COD. Abundance indices (numbers in millions) from acoustic surveys in the Barents Sea winter 1994-2026 estimated by StoX software. Area N included from 2014 onwards. Bootstrap mean estimates.

1 Indices raised to also represent the Russian EEZ. 2 Not complete coverage in southeast due to restrictions, strata 7 area set to default and strata 13 as in 2005. 3 Indices raised to also represent uncovered parts of the Russian EEZ. 4 1994-2020: bootstrap mean biomass estimated based on relationship between (unraised) numbers-at-age and biomass-at-age from StoX baseline run. From 2021: bootstrap mean biomass estimated directly in StoX; in years with adjustments for lack of coverage it is estimated based on relationship between unraised bootstrap mean numbers-at-age and unraised bootstrap mean biomass-at-age.

Age group Total Biomass (‘000 t)
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15+
2014 1112.50 53.97 54.53 11.67 14.62 7.31 2.26 4.73 2.98 0.27 0.02 0.00 0.00 0.00 0.00 1264.87 103.44
2015 589.67 88.32 25.22 49.00 12.68 11.24 5.34 1.08 3.40 1.16 0.77 0.05 0.00 0.00 0.00 787.93 122.36
2016 104.90 84.60 17.95 14.58 16.83 2.47 2.94 1.86 0.30 0.67 0.17 0.02 0.01 0.00 0.00 247.30 60.15
2017 31.09 28.70 26.54 5.44 5.68 4.13 1.54 0.65 0.24 0.05 0.28 0.04 0.00 0.00 0.00 104.37 40.15
2018 514.18 50.59 16.17 16.74 6.96 4.35 8.64 0.99 0.76 0.25 0.08 0.12 0.01 0.00 0.00 619.85 76.08
2019 371.39 75.30 20.87 27.74 20.56 7.98 3.63 5.27 0.42 0.44 0.14 0.04 0.01 0.03 0.00 533.82 112.10
2020 12.66 13.01 16.05 11.60 12.75 7.53 3.10 1.87 2.67 0.44 0.25 0.09 0.06 0.00 0.08 82.15 71.84
2021 3.35 1.85 4.11 6.72 4.13 3.70 1.61 0.45 0.20 0.21 0.01 0.01 0.00 0.00 0.01 26.36 24.23
2022 135.8 14.0 10.4 12.1 9.16 4.19 2.53 1.13 0.21 0.08 0.04 0.00 0.01 0.00 0.01 189.6 40.6
2023 179.0 32.1 6.28 6.32 7.62 7.53 2.69 1.51 0.60 0.07 0.00 0.02 0.00 0.00 0.00 243.7 49.7
2024 184.69 79.48 42.35 10.47 10.47 6.48 5.29 1.62 1.01 0.28 0.11 0.03 0.02 0.00 0.00 342.32 74.1
2025 132.38 51.15 50.82 39.28 8.90 6.62 6.07 4.12 1.15 0.55 0.13 0.00 0.00 0.00 0.02 301.19 99.38
2026 260.94 17.87 9.45 22.48 15.69 4.41 6.48 3.50 1.69 0.20 0.10 0.15 0.00 0.00 0.00 342.95 84.98

 

Table A5.3. COD. Abundance indices (numbers in millions) for new strata 24-26 from acoustic surveys in the Barents Sea winter 2014-2026 estimated by StoX software. 2014-2020: baseline estimates, from 2021: bootstrap mean estimates.


Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1994 30 41 29 12 7 10 13 19 20 29 29 69 89 -
1995 14 24 15 9 7 8 12 23 26 35 54 50 - -
1996 11 15 14 10 10 11 14 16 29 43 58 54 100 110
19971 33 29 14 11 10 10 8 13 22 54 63 - - 129
19981 23 18 11 9 10 8 8 11 22 36 45 - 101 -
1999 22 23 17 15 10 11 11 13 25 58 114 121 107 -
2000 31 26 17 10 7 10 17 21 22 42 72 68 110 -
2001 13 15 11 9 10 9 13 22 32 36 78 - - -
2002 18 16 10 6 7 10 15 17 32 78 73 - - -
2003 26 31 15 13 8 8 13 17 20 40 59 - 99 94
2004 18 16 13 10 10 10 9 13 16 45 58 95 125 -
2005 26 49 19 14 14 14 12 20 26 24 62 90 49 91
20062 24 14 11 8 8 10 16 18 19 37 61 66 - -
20071 27 24 14 14 11 17 21 24 27 36 42 44 92 -
2008 18 24 15 16 13 10 16 14 20 44 75 65 100 -
2009 21 20 26 22 18 17 13 14 19 32 45 71 112 -
2010 36 17 19 25 17 12 11 13 17 22 28 86 74 70
2011 13 27 12 11 11 10 9 15 28 29 35 39 66 86
20122 36 14 53 11 19 19 17 13 19 35 33 55 52 81
2013 15 21 13 9 11 11 14 11 18 35 44 55 66 108
2014 15 10 11 10 13 8 11 11 14 21 30 53 59 96
2015 27 22 15 15 10 14 18 21 19 29 48 55 63 70
2016 36 20 13 13 11 15 17 16 23 23 32 46 55 87
20172 15 19 12 11 10 8 11 14 21 22 19 25 31 58
2018 11 9 9 9 9 8 8 13 15 24 24 33 53 51
2019 12 12 8 7 6 11 12 10 14 23 32 55 49 60
20202 15 15 10 7 10 11 15 16 18 23 29 38 31 38
20212 32 42 34 21 13 13 17 16 20 20 29 44 69 175
2022 20 25 20 17 11 11 19 21 31 36 48 52 74 -
2023 30 14 13 13 12 11 9 11 16 22 43 71 72 -
2024 20 13 10 12 11 14 17 23 31 36 37 71 99 113
2025 38 23 13 10 9 9 9 9 10 15 29 45 62 113
2026 69 30 20 15 9 10 10 12 17 20 20 39 148 -

Table A5.4. COD. Estimates of coefficients of variation (%) for acoustic abundance indices. Barents Sea winter 1994-2026.

1REZ not covered. 2REZ partly covered.

Age group Total Biomass (‘000 t)
Area 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15+
A 0.85 0.21 0.37 3.76 13.59 6.04 3.13 2.89 0.85 0.26 0.39 0.00 0.00 0.00 0.00 32.33 56.89
B 0.19 0.10 0.97 1.31 2.86 2.04 0.65 0.99 1.37 0.65 0.03 0.00 0.00 0.00 0.00 11.16 36.38
C 0.44 0.11 0.05 0.69 2.81 1.86 1.24 0.73 0.79 0.25 0.09 0.01 0.00 0.00 0.00 9.07 21.72
D 5.04 5.08 5.36 20.73 40.68 13.17 4.41 3.08 1.78 1.17 0.43 0.15 0.00 0.00 0.00 101.08 122.50
D' 5.69 4.10 3.43 15.00 16.05 5.71 1.80 0.55 0.31 0.48 0.11 0.03 0.03 0.00 0.03 53.33 43.23
E 5.96 17.13 13.57 12.02 5.92 0.73 0.36 0.41 0.09 0.08 0.07 0.00 0.00 0.00 0.00 56.33 14.99
S 41.22 6.27 11.79 30.07 37.60 8.40 2.35 2.96 1.30 0.40 0.00 0.07 0.00 0.00 0.00 142.42 85.13
N 165.34 12.50 7.50 21.48 14.04 4.33 7.07 3.60 1.40 0.23 0.10 0.10 0.00 0.00 0.00 237.68 80.67
ABCD 6.52 5.49 6.77 26.50 59.94 23.10 9.43 7.68 4.79 2.33 0.95 0.16 0.00 0.00 0.00 153.65 237.49
Sum 224.72 45.49 43.06 105.07 133.55 42.26 21.00 15.20 7.89 3.51 1.22 0.36 0.03 0.00 0.03 643.40 461.51

Table A5.5. COD. Abundance indices from bottom trawl hauls for main areas of the Barents Sea winter 2026 (numbers in millions). Bootstrap mean estimates.

Age group Total Biomass (‘000 t)
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15+
1994 1043.78 556.68 293.92 307.04 153.33 45.72 7.95 2.61 1.48 0.55 0.55 0.08 0.05 0 0 2413.74 763.41
1995 5356.43 541.25 282.84 242.36 251.01 76.42 17.98 2.42 1.07 0.50 0.61 0.19 0 0 0 6773.08 937.79
1996 5899.23 791.62 163.08 117.43 138.59 108.88 24.43 2.64 0.37 0.17 0.12 0.07 0.07 0.02 0 7246.72 718.00
19971 5044.09 1422.92 317.99 68.44 74.26 59.99 26.67 4.85 0.64 0.91 0.08 0 0 0 0 7020.84 558.85
19981 2490.54 496.48 355.10 166.94 31.67 26.15 17.52 8.16 0.79 0.52 0.04 0 0 0 0.04 3593.95 432.77
1999 473.04 350.21 188.48 180.75 61.39 12.71 6.81 5.14 1.01 0.26 0.02 0.04 0.02 0 0 1279.88 322.68
2000 128.57 242.33 245.81 130.03 111.73 26.75 4.56 1.84 1.21 0.33 0.10 0.03 0.02 0 0 893.31 363.23
2001 712.77 78.03 182.79 195.11 82.90 37.96 9.45 1.17 0.44 0.19 0.04 0 0 0 0.01 1300.86 436.57
2002 34.11 418.73 118.36 137.56 108.95 45.79 14.40 2.20 0.32 0.18 0.05 0 0 0 0.02 880.67 447.43
2003 3022.23 65.78 376.70 126.31 93.93 66.88 17.50 4.67 1.02 0.17 0.04 0 0.02 0.02 0 3775.27 546.13
2004 322.87 242.94 63.88 184.62 53.46 43.24 30.59 6.85 1.65 0.28 0.07 0.01 0.01 0 0 950.47 415.07
2005 853.43 216.67 248.88 55.06 102.97 22.38 16.36 3.81 0.92 0.30 0.04 0.02 0.04 0.04 0 1520.92 359.76
20062 674.21 289.39 116.49 115.38 28.32 43.42 13.72 5.24 1.36 0.24 0.18 0.18 0 0 0 1288.13 334.94
20071 594.69 369.74 361.13 127.73 68.51 13.65 23.60 6.82 2.30 0.41 0.11 0.10 0 0 0 1568.79 444.84
2008 68.83 101.96 194.37 300.59 111.90 40.24 17.34 8.11 1.79 0.36 0.03 0.02 0.01 0 0 845.55 686.98
2009 389.48 35.59 126.28 196.70 220.23 60.69 17.90 9.02 5.24 0.51 0.17 0.03 0.04 0 0 1061.88 757.32
2010 1027.59 95.14 36.81 114.25 154.80 144.50 39.56 11.24 3.67 1.60 0.58 0.04 0.02 0.04 0.02 1629.86 827.36
2011 617.18 225.81 85.40 50.37 129.70 138.66 103.51 16.37 4.36 1.20 0.82 0.19 0.14 0.04 0.02 1373.77 891.44
20123 702.97 100.30 75.72 64.59 33.71 90.69 132.58 48.61 9.02 2.26 0.88 0.55 0.44 0.07 0.05 1262.44 879.93
2013 435.72 142.96 68.84 114.09 63.18 40.43 64.54 76.38 33.52 2.22 2.87 0.40 0.35 0.06 0.03 1045.59 951.73
2014 1245.71 191.48 226.85 93.79 88.59 56.39 32.74 53.05 36.19 9.81 1.01 0.95 0.15 0.02 0.08 2036.81 897.87
2015 1642.00 342.76 144.07 228.25 147.29 113.53 74.43 29.22 53.51 18.08 3.38 0.75 0.12 0.07 0.04 2797.50 1338.73
2016 312.16 305.57 99.37 135.48 188.31 113.47 72.33 28.56 13.17 16.06 6.77 0.97 0.52 0.17 0.14 1293.05 1085.06
20173 644.51 128.92 179.25 62.15 84.54 90.16 37.82 26.33 8.18 3.26 2.61 3.70 0.58 0.17 0.06 1272.24 753.67
2018 2714.35 500.69 139.41 184.78 61.81 64.17 73.88 25.88 9.28 5.87 1.29 2.46 1.23 0.13 0.37 3785.60 908.45
2019 1790.57 559.44 281.57 179.15 221.90 79.65 32.96 38.31 8.15 2.62 0.54 0.24 0.16 0.18 0.12 3195.56 974.96
20203 164.75 273.82 237.73 160.24 131.56 114.88 49.83 24.26 20.44 4.53 1.66 0.93 0.51 0.26 0.73 1186.13 857.96
20213 80.88 34.87 111.50 119.35 112.31 54.28 37.98 13.57 7.27 3.53 1.25 0.42 0.25 0.04 0.32 577.83 528.35
2022 667.82 65.64 51.98 88.68 86.60 66.51 44.60 30.42 5.70 2.29 2.08 1.49 0.16 0.00 0.90 1114.9 634.0
2023 305.40 163.06 41.21 39.82 46.52 43.17 32.24 14.26 7.49 1.58 0.34 0.14 0.06 0.00 0.14 695.4 458.72
2024 377.9 307.04 198.71 63.31 36.21 29.96 28.22 16.15 8.9 2.68 0.37 0.1 0.02 0.01 0.06 1069.4 419.08
2025 165.47 119.23 154.43 168.18 57.63 29.76 23.50 18.97 9.53 3.55 0.85 0.33 0.08 0.01 0.07 751.59 484.27
2026 224.72 45.49 43.06 105.07 133.55 42.26 21.00 15.20 7.89 3.51 1.22 0.36 0.03 0.00 0.03 643.40 461.51

 

Table A5.6. COD. Abundance indices (numbers in millions) from bottom trawl surveys in the Barents Sea winter 1994-2026. Area N included from 2014 onwards. Bootstrap mean estimates.

1 Indices raised to also represent the Russian EEZ. 2 Not complete coverage in southeast due to restrictions, strata 7 area set to default and strata 13 as in 2005. 3 Indices raised to also represent uncovered parts of the Russian EEZ. 4 1994-2020: bootstrap mean biomass estimated based on relationship between (unraised) numbers-at-age and biomass-at-age from StoX baseline run. From 2021: bootstrap mean biomass estimated directly in StoX; in years with adjustments for lack of coverage it is estimated based on relationship between unraised bootstrap mean numbers-at-age and unraised bootstrap mean biomass-at-age.


Age group Total Biomass (‘000 t)
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15+
2014 713.08 77.53 42.89 18.72 15.38 9.93 2.90 5.31 3.65 0.55 0.06 0.01 0.00 0.00 0.00 890.00 117.15
2015 403.27 85.44 26.44 46.50 20.73 11.77 5.27 1.82 2.47 1.44 0.45 0.06 0.00 0.00 0.00 605.64 129.79
2016 101.28 92.79 27.21 24.25 28.17 9.40 5.58 2.52 0.61 0.96 0.35 0.05 0.02 0.00 0.00 293.19 109.39
2017 182.91 49.50 60.34 27.67 28.94 31.41 10.26 3.29 0.60 0.26 0.33 0.08 0.00 0.00 1.72 397.32 187.18
2018 1010.90 115.27 29.03 42.62 13.37 11.59 14.39 4.05 1.55 0.40 0.19 0.24 0.03 0.00 0.00 1243.61 170.48
2019 493.52 119.15 40.37 33.55 42.75 12.63 6.88 8.39 1.43 0.61 0.14 0.08 0.02 0.06 0.00 759.60 190.84
2020 25.44 30.50 36.58 33.77 22.46 21.42 8.16 4.32 3.99 0.85 0.44 0.06 0.11 0.00 0.09 188.20 162.34
2021 31.98 12.50 22.74 32.50 26.64 14.80 7.51 1.66 1.13 0.86 0.04 0.08 0.00 0.00 0.02 152.45 115.76
2022 158.91 18.08 15.83 22.22 21.53 9.86 6.33 3.96 0.58 0.26 0.15 0.00 0.02 NA 0.03 257.76 99.69
2023 215.0 41.5 7.82 9.03 9.40 9.45 2.37 1.88 0.77 0.11 0.00 0.02 0.00 0.00 0.00 297.3 60.6
2024 236.87 111.88 49.32 8.49 12.11 6.54 5.62 1.63 1.17 0.33 0.13 0.04 0.02 0.00 0.00 434.13 82.2
2025 84.56 36.54 43.78 33.44 6.96 5.21 6.77 3.91 1.02 0.53 0.10 0.00 0.00 0.00 0.02 222.84 90.4
2026 165.34 12.50 7.50 21.48 14.04 4.33 7.07 3.60 1.40 0.23 0.10 0.10 0.00 0.00 0.00 237.68 80.67

Table A5.7. COD. Abundance indices (numbers in millions) for new strata 24-26 from bottom trawl surveys in the Barents Sea winter 2014-2026. Bootstrap mean estimates.

Age group
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1994 7 15 10 10 10 9 13 24 23 25 18 72 69 - -
1995 8 14 11 12 10 10 12 23 33 27 42 39 - - -
1996 7 12 19 10 12 9 13 13 25 40 50 39 48 92 -
19971 27 29 17 14 13 10 9 15 21 56 70 - - - -
19981 8 12 15 11 11 11 8 10 17 48 61 - 95 - 68
1999 18 28 17 14 9 10 14 29 22 62 106 95 91 - -
2000 12 18 15 8 9 10 12 11 15 32 55 65 84 - -
2001 11 15 17 14 10 11 16 23 28 36 57 - - - 96
2002 13 23 24 7 9 13 9 14 26 40 63 - - - 93
2003 25 33 26 19 8 7 10 12 17 40 55 - 71 69 -
2004 12 13 19 14 10 12 14 12 14 36 40 106 101 - -
2005 9 18 27 20 18 14 11 10 16 23 61 66 49 94 -
20062 12 13 14 27 17 13 21 12 17 27 55 63 - - -
20071 25 21 16 25 7 10 10 14 19 19 34 47 84 - -
2008 9 16 16 23 31 9 37 14 25 24 70 83 99 - -
2009 10 10 16 11 19 13 16 23 22 31 33 61 91 - -
2010 33 10 13 19 13 10 21 11 22 21 25 71 57 60 -
2011 6 24 11 15 16 10 9 10 26 19 48 36 58 64 99
20122 9 14 13 12 15 20 20 12 24 19 23 39 52 76 100
2013 10 19 14 17 12 10 12 10 17 21 55 34 43 102 94
2014 11 9 10 11 11 7 16 12 11 19 26 33 61 117 68
2015 7 19 12 13 15 16 27 21 40 16 21 28 74 71 82
2016 9 11 15 11 8 17 19 11 15 25 20 33 31 53 52
20172 10 11 12 14 26 15 19 23 11 18 20 26 43 37 96
2018 6 14 7 9 8 12 8 12 12 29 20 34 48 46 48
2019 8 8 9 9 16 16 12 8 14 15 24 35 40 35 82
20202 14 10 13 16 11 11 12 10 12 14 21 52 29 39 30
20212 15 10 16 11 10 12 10 16 15 13 24 38 68 91 46
2022 7 12 22 21 15 10 16 18 15 27 58 72 41 - 91
2023 23 9 11 11 10 9 9 10 20 18 39 45 62 - -
2024 10 13 8 12 11 8 8 8 21 21 28 47 99 90 -
2025 13 12 10 10 11 11 9 9 12 15 26 46 55 97 100
2026 27 12 12 10 9 8 10 8 8 11 16 27 95 - -

Table A5.8. COD. Estimates of coefficients of variation (%) for swept area abundance indices. Barents Sea winter 1994-2026.

1 REZ not covered. 2 REZ partly covered.

  Age
Year 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9
  Acoustic investigations
1994-95 1.45 1.51 0.84 0.64 1.13 1.50 1.68 1.37
1995-96 2.08 0.76 0.43 0.23 0.87 1.10 1.96 2.09
1996-97 1.17 0.54 0.81 0.59 1.00 1.26 1.49 0.97
1997-98 1.27 0.37 -0.18 -0.01 0.19 0.38 0.38 1.02
1998-99 2.39 1.17 1.10 1.29 1.32 1.78 1.91 2.39
1999-00 0.33 -0.24 -0.12 -0.11 0.02 0.05 0.39 0.41
2000-01 1.09 0.39 0.61 0.73 1.19 1.52 1.88 2.32
2001-02 0.55 -0.18 0.51 0.49 0.44 0.80 1.34 1.69
2002-03 -1.01 -0.38 -0.64 -0.16 -0.17 0.33 0.69 0.41
2003-04 2.55 0.45 1.28 1.27 1.49 1.86 1.96 2.16
2004-05 0.15 -0.06 0.00 0.26 0.44 0.62 1.30 1.66
2005-06 1.15 0.76 0.84 0.60 0.80 0.80 1.12 1.35
2006-07 2.17 0.99 0.76 0.61 0.71 0.49 0.39 0.61
2007-08 -0.10 -1.45 -1.60 -1.34 -0.91 -0.88 0.22 0.83
2008-09 0.69 -0.14 0.09 0.74 1.03 1.66 1.54 1.21
2009-10 1.55 0.11 0.20 0.13 -0.11 -0.07 -0.05 0.18
2010-11 1.92 0.08 -0.22 0.30 0.40 0.42 0.81 0.87
2011-12 1.89 0.09 -0.20 -0.18 -0.11 -0.21 0.44 0.86
2012-13 1.72 -0.41 -0.02 -0.38 -0.35 -0.31 0.01 0.17
2013-14 0.39 -1.17 -0.72 -0.27 -0.03 0.19 0.09 0.76
2014-15 2.12 0.42 0.20 -0.04 -0.23 -0.08 0.12 0.51
2015-16 2.24 1.32 0.59 0.68 0.69 1.03 1.14 0.96
2016-17 1.19 0.59 0.28 0.55 0.60 0.60 0.72 0.77
2017-18 0.45 -0.40 -0.30 -0.23 -0.22 -0.01 0.04 0.81
2018-19 1.74 0.32 -0.14 0.04 -0.13 0.45 0.56 1.27
2019-20 2.21 1.13 0.55 0.43 0.46 0.36 0.28 0.57
2020-21 1.41 0.93 0.73 0.79 0.77 1.11 1.26 1.54
2021-22 0.06 -0.03 0.20 0.04 0.16 -0.11 0.10 0.46
2022-23 1.63 0.42 0.1 0.46 0.52 0.68 1.22 1.37
2023-24 0.20 -0.38 -0.58 -0.10 0.21 0.18 0.23 0.11
2024-25 1.13 0.43 -0.02 -0.07 0.07 0.15 0.36 0.74
2025-26 1.82 1.43 0.64 0.51 0.32 0.27 0.41 0.63
  Bottom trawl investigations
1994-95 0.66 0.68 0.19 0.20 0.70 0.93 1.19 0.89
1995-96 1.91 1.20 0.88 0.56 0.84 1.14 1.92 1.88
1996-97 1.42 0.91 0.87 0.46 0.84 1.41 1.62 1.42
1997-98 2.32 1.39 0.64 0.77 1.04 1.23 1.18 1.81
1998-99 1.96 0.97 0.68 1.00 0.91 1.35 1.23 2.09
1999-00 0.67 0.35 0.37 0.48 0.83 1.03 1.31 1.45
2000-01 0.50 0.28 0.23 0.45 1.08 1.04 1.36 1.43
2001-02 0.53 -0.42 0.28 0.58 0.59 0.97 1.46 1.30
2002-03 -0.66 0.11 -0.07 0.38 0.49 0.96 1.13 0.77
2003-04 2.52 0.03 0.71 0.86 0.78 0.78 0.94 1.04
2004-05 0.40 -0.02 0.15 0.58 0.87 0.97 2.08 2.01
2005-06 1.08 0.62 0.77 0.66 0.86 0.49 1.14 1.03
2006-07 0.60 -0.22 -0.09 0.52 0.73 0.61 0.70 0.82
2007-08 1.76 0.64 0.18 0.13 0.53 -0.24 1.07 1.34
2008-09 0.66 -0.21 -0.01 0.31 0.61 0.81 0.65 0.44
2009-10 1.41 -0.03 0.10 0.24 0.42 0.43 0.47 0.90
2010-11 1.52 0.11 -0.31 -0.13 0.11 0.33 0.88 0.95
2011-12 1.82 1.09 0.28 0.40 0.36 0.04 0.76 0.60
2012-13 1.59 0.38 -0.41 0.02 -0.18 0.34 0.55 0.37
2013-14 0.82 -0.46 -0.31 0.25 0.11 0.21 0.20 0.75
2014-15 1.29 0.28 -0.01 -0.45 -0.25 -0.28 0.11 -0.01
2015-16 1.68 1.24 0.06 0.19 0.26 0.45 0.96 0.80
2016-17 0.88 0.53 0.47 0.47 0.74 1.10 1.01 1.25
2017-18 0.25 -0.08 -0.03 0.01 0.28 0.20 0.38 1.04
2018-19 1.58 0.58 -0.25 -0.18 -0.25 0.67 0.66 1.16
2019-20 1.88 0.86 0.56 0.31 0.66 0.47 0.31 0.63
2020-21 1.55 0.90 0.69 0.36 0.89 1.11 1.30 1.21
2021-22 0.21 -0.40 0.23 0.32 0.52 0.20 0.22 0.87
2022-23 1.41 0.47 0.27 0.65 0.70 0.72 1.14 1.40
2023-24 -0.01 -0.20 -0.43 0.09 0.44 0.43 0.69 0.47
2024-25 1.15 0.69 0.17 0.09 0.20 0.24 0.40 0.53
2025-26 1.29 1.02 0.39 0.23 0.31 0.35 0.44 0.88

Table A5.9. COD. Survey mortality from surveys in the Barents Sea winter 1994-2026.

Age/ Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1994 11.3 17.9 30.2 44.6 55.2 65.7 73.9 78.9 87.4 97.2 97.6 104.7 + -
1995 12.2 18.1 29.0 42.2 53.9 63.9 75.4 80.4 85.9 99.1 90.1 109.0 - -
1996 12.1 18.8 28.8 40.5 49.4 60.9 71.8 85.1 92.4 94.9 96.1 104.2 103.9 +
19971 10.8 16.9 29.7 41.0 50.6 59.4 69.6 81.2 92.3 80.4 + - - -
19981 10.5 17.8 30.8 40.9 50.9 58.5 67.7 76.7 87.2 103.0 111.4 - + -
1999 12.0 18.4 29.0 40.0 50.4 59.4 70.4 78.4 88.5 87.6 + + + -
2000 12.8 20.7 28.4 39.7 51.5 61.4 70.4 76.3 84.9 84.3 100.0 + + -
2001 11.6 22.6 33.0 41.2 52.2 63.3 70.4 78.3 86.0 95.7 104.7 - - -
2002 12.0 19.6 28.9 43.6 52.1 61.9 71.4 79.5 91.2 89.7 103.7 - - -
2003 11.4 18.1 29.1 39.7 53.4 61.7 70.6 80.8 89.1 90.1 105.4 - + +
2004 10.6 18.4 31.7 40.6 51.7 61.6 68.6 79.7 90.9 90.4 92.2 + + -
2005 11.2 18.3 29.5 43.4 51.1 60.4 71.0 79.6 89.0 96.4 109.3 + 129.6 +
20062 12.0 19.4 30.9 42.1 53.8 60.3 66.7 76.7 84.9 98.9 95.4 84.9 - -
20071 13.2 20.7 29.6 41.1 52.8 62.5 70.4 78.2 87.5 92.7 101.8 121.6 + -
2008 12.1 22.3 33.0 43.2 51.8 64.0 69.9 81.3 88.7 95.3 + + + -
2009 11.2 21.1 32.1 42.6 53.2 61.9 76.6 81.8 89.5 97.8 99.5 + + -
2010 11.2 18.4 31.4 42.7 52.4 60.7 70.5 80.4 88.8 96.3 102.2 + + 126.0
2011 11.9 19.5 29.4 41.9 51.0 60.7 68.1 78.3 86.1 95.4 102.2 110.4 114.3 +
20122 10.6 18.4 29.7 41.0 52.4 58.1 66.5 75.6 86.0 91.8 105.9 114.0 119.0 +
2013 11.2 19.3 31.1 41.1 51.7 62.0 69.7 76.5 81.2 95.3 93.7 110.7 110.8 +
2014 9.7 17.1 29.5 40.5 52.0 59.6 70.2 76.8 81.8 87.1 97.4 98.9 107.8 +
2015 10.5 15.9 30.0 40.3 51.1 60.2 68.8 77.5 81.2 88.7 94.0 101.9 127.5 +
2016 12.2 18.3 27.7 40.6 49.8 60.5 68.3 76.6 85.5 86.5 90.5 94.1 112.0 122.5
20172 12.3 22.2 31.2 42.5 51.2 60.5 69.6 75.5 85.2 90.9 96.0 92.6 108.6 108.7
2018 11.2 19.1 32.7 42.4 51.2 61.6 69.0 77.5 83.4 87.6 97.0 99.3 101.8 106.8
2019 11.7 17.5 31.2 42.4 51.0 59.6 69.7 77.0 84.1 87.1 99.3 103.4 104.6 109.8
20202 12.0 17.5 25.5 39.5 50.2 58.6 66.7 74.8 83.0 90.0 93.9 92.4 111.2 113.9
20212 11.6 19.9 26.5 37.4 48.0 58.5 66.7 74.9 84.0 91.7 97.7 102.1 105.8 +
2022 10.8 20.4 32.4 39.1 49.3 58.4 68.7 75.3 84.1 92.5 98.2 102.6 113.2 -
2023 11.4 19.7 32.3 42.2 50.0 59.1 67.6 75.9 81.7 86.8 104.2 104.1 115.6 -
2024 11.3 18.1 30.9 42.2 50.7 59.6 66.7 76.0 80.4 85.9 96.6 99.5 + +
2025 11.6 17.3 27.8 41.0 50.4 58.3 67.9 73.7 81.6 86.2 91.8 101.0 108.2 119.0
2026 10.5 18.0 26.8 37.8 49.0 59.5 68.1 75.2 84.7 89.2 94.7 105.1 + -

Table A5.10 COD. Mean length (cm) at age from bottom trawl surveys in the Barents Sea winter 1994-2026. Bootstrap mean estimates. “+” indicates few samples (< 3), while “–“ indicates no samples. Lengths are not adjusted for incomplete coverage.

1 REZ not covered. 2 REZ partly covered.

Age/ Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1994 13 56 262 796 1470 2386 3481 4603 6777 8195 8516 13972 + -
1995 15 54 240 658 1336 2207 3570 4715 5712 8816 6817 12331 - -
1996 15 62 232 627 1084 1980 3343 5514 7722 8873 9613 12865 12556 +
19971 13 52 230 638 1175 1797 2931 4875 7529 5739 + - - -
19981 11 52 280 635 1182 1728 2588 4026 6076 11257 14391 - + -
1999 14 59 231 592 1178 1829 2991 4128 6321 7342 + + + -
2000 16 74 210 558 1210 1963 3036 3867 5401 6154 10023 + + -
2001 14 106 336 646 1288 2233 3088 4439 5732 8442 11429 - - -
2002 14 67 238 747 1229 2063 3199 4578 7525 6598 12292 - - -
2003 13 61 234 597 1316 2014 2989 4715 6517 7500 12812 - + +
2004 11 59 275 608 1143 1947 2623 4137 6673 7368 8109 + + -
2005 13 61 246 723 1146 1866 2949 4226 6436 8646 12537 + 24221 -
20062 13 69 280 669 1420 1970 2641 4260 5914 10179 9439 8328 - -
20071 19 73 235 639 1302 2190 3039 4411 6394 8056 10826 20104 + -
2008 15 90 335 798 1399 2442 3235 5210 6981 9641 + + + -
2009 13 83 294 704 1302 2065 4067 5087 6874 9460 9511 + + -
2010 12 64 304 700 1296 2033 3162 4743 6562 8984 10315 + + 22766
2011 15 66 246 668 1131 1940 2726 4013 5969 8275 10309 13159 14868 +
20122 13 62 252 609 1276 1681 2489 3764 5920 7809 12199 15006 17582 +
2013 11 65 269 602 1208 2055 2809 3843 4822 8447 9101 15108 14743 +
2014 8 50 246 603 1226 1780 2866 3930 4927 6203 8570 9566 12239 +
2015 10 44 242 602 1221 1929 2741 4043 4804 6817 7759 11544 21652 +
2016 13 53 200 593 1049 1928 2674 3830 5540 6129 7110 8272 15256 21945
20172 15 102 292 720 1178 1972 3056 3962 5901 7429 9301 8599 12958 14894
2018 12 69 320 688 1228 2062 2803 4154 5409 6632 9156 10510 11810 12443
2019 12 48 273 685 1164 1870 2916 3974 5394 6068 9637 11507 12371 13993
20202 14 44 153 548 1077 1692 2476 3625 5074 6758 8040 8107 14892 15793
20212 14 68 164 462 910 1682 2484 3620 5379 7160 9313 10923 12410 +
2022 11 77 311 535 1052 1716 2885 3855 5321 7751 9538 11432 14940 -
2023 12 71 316 694 1111 1757 2802 4097 5119 6443 10937 10668 14732 -
2024 12 57 278 701 1133 1855 2571 3834 4994 5931 8809 10805 + +
2025 13 51 217 648 1176 1778 2678 3516 5033 6267 7722 10640 13730 13010
2026 11 53 195 488 996 1791 2612 3506 5387 6473 7981 12239 + -

Table A5.11. COD. Mean weight (g) at age from bottom trawl surveys in the Barents Sea winter 1994-2026. Bootstrap mean estimates. “+” indicates few samples (< 3), while “–“ indicates no samples. Weights are not adjusted for incomplete coverage.

1 REZ not covered. 2 REZ partly covered.

Age/ Year 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10
1994-95 41 184 396 540 737 1184 1234 1109 2039
1995-96 47 178 387 426 644 1136 1944 3007 3161
1996-97 37 168 406 548 713 951 1532 2015 -1983
1997-98 39 228 405 544 553 791 1095 1201 3728
1998-99 48 179 312 543 647 1263 1540 2295 1266
1999-00 60 151 327 618 785 1207 876 1273 -167
2000-01 90 262 436 730 1023 1125 1403 1865 3041
2001-02 53 132 411 583 775 966 1490 3086 866
2002-03 47 167 359 569 785 926 1516 1939 -25
2003-04 46 214 374 546 631 609 1148 1958 851
2004-05 50 187 448 538 723 1002 1603 2299 1973
2005-06 56 219 423 697 824 775 1311 1688 3743
2006-07 60 166 359 633 770 1069 1770 2134 2142
2007-08 71 262 563 760 1140 1045 2171 2570 3247
2008-09 68 204 369 504 666 1625 1852 1664 2479
2009-10 51 221 406 592 731 1097 676 1475 2110
2010-11 54 182 364 431 644 693 851 1226 1713
2011-12 47 186 363 608 550 549 1038 1907 1840
2012-13 52 207 350 599 779 1128 1354 1058 2527
2013-14 39 181 334 624 572 811 1121 1084 1381
2014-15 36 192 356 618 703 961 1177 874 1890
2015-16 43 156 351 447 707 745 1089 1497 1325
2016-17 89 239 520 585 923 1128 1288 2071 1889
2017-18 54 218 396 508 884 831 1098 1447 731
2018-19 36 204 365 476 642 854 1171 1240 659
2019-20 32 105 275 392 528 606 709 1100 1364
2020-21 54 120 309 362 605 792 1144 1754 2086
2021-22 63 243 371 590 806 1203 1371 1701 2372
2022-23 60 239 383 576 705 1086 1212 1264 1122
2023-24 45 207 385 439 744 814 1032 897 812
2024-25 39 160 359 475 645 823 945 1199 1273
2025-26 40 144 271 348 615 834 828 1871 1440

Table A5.12. COD. Yearly weight increment (g) from bottom trawl surveys in the Barents Sea winter 1994-2026.

Age/ Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1994 0.00 0.00 0.00 0.00 0.06 0.14 0.31 0.71 0.92 1.00 0.83 1.00 + -
1995 0.00 0.00 0.00 0.01 0.05 0.26 0.32 0.51 0.85 0.91 1.00 1.00 - -
1996 0.00 0.00 0.00 0.00 0.01 0.16 0.33 0.51 1.00 1.00 1.00 1.00 1.00 +
1997 0.00 0.00 0.00 0.00 0.01 0.08 0.38 0.80 1.00 0.83 + - - -
1998 0.00 0.00 0.00 0.01 0.04 0.18 0.33 0.64 0.84 1.00 - + - -
1999 - 0.00 0.00 0.00 0.01 0.12 0.37 0.70 0.88 + + + - +
2000 0.00 0.00 0.00 0.00 0.05 0.28 0.85 0.86 1.00 1.00 + + - +
2001 0.00 0.00 0.00 0.01 0.05 0.27 0.43 0.70 0.91 1.00 - - - -
2002 - 0.00 0.00 0.01 0.04 0.29 0.47 0.56 0.87 1.00 - - - -
2003 - 0.00 0.00 0.00 0.05 0.21 0.40 0.69 0.94 1.00 - + + -
2004 - 0.00 0.00 0.01 0.05 0.25 0.53 0.72 0.87 0.88 + + - +
2005 0.00 0.00 0.00 0.00 0.04 0.18 0.49 0.80 0.92 1.00 1.00 + 1.00 -
2006 0.00 0.00 0.00 0.03 0.05 0.20 0.39 0.74 0.72 1.00 1.00 1.00 - -
2007 0.00 0.00 0.00 0.01 0.05 0.33 0.57 0.84 0.98 1.00 1.00 1.00 + -
2008 0.00 0.00 0.01 0.01 0.12 0.32 0.54 0.74 0.82 1.00 1.00 + + -
2009 0.00 0.00 0.00 0.00 0.08 0.25 0.49 0.64 0.91 0.96 0.86 + + -
2010 - 0.00 0.01 0.01 0.10 0.37 0.50 0.79 0.89 0.95 0.93 + + 1.00
2011 0.00 0.00 0.00 0.00 0.03 0.22 0.43 0.54 0.84 0.88 1.00 1.00 1.00 +
2012 0.00 0.00 0.00 0.00 0.09 0.21 0.42 0.67 0.85 0.93 1.00 1.00 1.00 +
2013 0.00 0.00 0.00 0.00 0.01 0.11 0.40 0.69 0.79 0.98 0.95 1.00 1.00 +
2014 0.00 0.00 0.00 0.00 0.03 0.10 0.41 0.76 0.87 0.97 0.98 0.96 1.00 +
2015 0.00 0.00 0.00 0.00 0.00 0.06 0.16 0.65 0.91 0.97 0.95 1.00 1.00 +
2016 0.00 0.00 0.00 0.00 0.00 0.04 0.16 0.54 0.78 0.95 0.95 1.00 1.00 1.00
2017 0.00 0.00 0.00 0.02 0.00 0.09 0.34 0.65 0.89 1.00 1.00 0.97 1.00 1.00
2018 0.00 0.00 0.00 0.00 0.02 0.13 0.32 0.56 0.84 0.96 1.00 0.97 0.97 1.00
2019 0.00 0.00 0.00 0.00 0.01 0.12 0.34 0.76 0.89 0.86 0.95 1.00 1.00 1.00
2020 0.00 0.00 0.00 0.00 0.01 0.11 0.29 0.63 0.82 0.89 1.00 1.00 1.00 1.00
2021 0.00 0.01* 0.00 0.00 0.00 0.14 0.33 0.58 0.84 0.95 0.96 1.00 1.00 +
2022 0.00 0.00 0.02 0.00 0.00 0.06 0.39 0.63 0.66 0.96 1.00 0.96 1.00 -
2023 0.00 0.00 0.01 0.03 0.03 0.07 0.42 0.73 0.91 0.88 1.00 1.00 1.00 -
2024 0.00 0.00 0.00 0.01 0.02 0.13 0.40 0.71 0.98 1.00 1.00 1.00 1.00 1.00
2025 0.00 0.00 0.00 0.01 0.02 0.09 0.33 0.57 0.81 0.95 1.00 1.00 1.00 1.00
2026 0.00 0.00 0.00 0.01 0.02 0.12 0.37 0.61 0.93 0.97 0.97 1.00 + -

Table A5.13. COD. Proportion mature at age from bottom trawl surveys in the Barents Sea winter 1994-2026. Bootstrap mean estimate. The proportion mature is the number of fish classified as maturity category 2 and 3, divided by the total number of fish assigned categories 1-3.

* Based on one sample only.

    no. stomachs sampled % empty stomachs mean stomach fullness
Year Stations <20 cm 20-34 cm 35-49 cm >=50 cm <20 cm 20-34 cm 35-49 cm >=50 cm <20 cm 20-34 cm 35-49 cm >=50 cm
1984 31 176 288 242 381 18.8 14.9 5.0 4.5 1.59 2.05 1.80 1.46
1985 49 106 494 582 612 44.3 34.0 19.8 20.6 1.55 3.58 4.46 3.43
1986 73 231 309 398 427 43.3 32.4 26.9 19.0 0.73 2.48 2.90 2.94
1987 52 133 415 501 409 32.3 48.9 45.3 48.9        
1988 79 29 418 844 704 34.5 40.2 31.6 29.7 1.01 1.29 0.91 0.84
1989 82 82 378 890 1132 40.2 21.2 16.3 20.6 1.45 2.28 2.12 1.47
1990 60 177 300 450 870 39.0 22.7 18.4 16.4 1.84 2.18 2.01 1.60
1991 70 271 463 450 1107 40.6 25.5 11.3 9.5 0.95 2.28 3.73 4.27
1992 100 229 382 471 922 65.9 45.8 31.4 38.2 1.79 3.15 3.05 1.92
1993 117 139 393 570 1073 76.3 38.4 21.2 26.7 1.86 3.34 2.99 3.05
1994 138 296 370 580 1163 64.9 34.9 25.0 24.3 0.76 2.04 2.00 1.63
1995 161 452 517 638 1482 52.2 36.4 32.0 30.8 1.16 1.39 0.93 0.80
1996 254 483 507 540 1338 55.7 39.1 28.0 27.4 0.92 1.32 1.38 1.02
1997 149 305 337 358 1105 57.0 34.1 20.7 29.5 0.98 1.60 1.81 1.48
1998 197 496 492 564 1042 64.7 48.2 29.3 28.6 2.20 1.93 1.67 1.22
1999 211 310 471 554 849 61.3 38.6 27.4 25.9 2.11 1.90 2.06 1.76
2000 243 413 645 669 1069 53.8 28.7 21.2 21.1 1.36 1.98 2.41 1.74
2001 361 644 728 884 1485 72.4 42.3 29.3 32.2 2.32 2.98 3.33 2.79
2002 345 393 704 799 1423 69.2 42.8 30.9 30.9 1.57 2.78 2.36 1.88
2003 285 325 499 637 1468 61.5 39.5 22.6 24.4 5.55 2.78 2.55 2.28
2004 329 508 525 663 1522 51.8 37.9 24.1 27.6 1.94 2.02 1.76 1.55
2005 335 509 651 648 1423 43.6 34.7 26.5 25.4 2.29 2.22 1.79 1.65
2006 259 402 464 534 1059 59.2 42.5 21.9 24.5 1.80 1.88 2.56 1.80
2007 273 386 483 592 1341 60.6 45.3 30.7 30.1 1.68 1.87 1.83 1.50
2008 326 260 733 933 1655 61.9 38.5 26.0 23.0 1.94 2.42 2.93 2.19
2009 319 385 547 798 1657 56.1 35.1 22.3 23.9 1.57 1.89 2.02 1.58
2010 360 594 552 748 2079 51.5 38.6 23.0 25.5 1.83 2.19 2.72 2.49
2011 359 515 628 506 1821 56.7 37.7 17.2 23.9 2.08 2.06 2.47 2.49
2012 297 373 408 431 1626 42.6 27.5 13.9 21.0 1.80 2.45 2.28 1.67
2013 279 209 352 425 1435 44.0 28.4 12.7 17.2 1.49 2.25 2.36 1.93
2014 434 570 686 686 2004 42.8 26.7 18.4 19.8 1.59 2.17 2.11 1.33
2015 356 664 562 670 1735 45.8 29.9 20.1 23.1 1.53 2.09 1.96 1.59
2016 387 427 616 728 1971 52.5 32.0 25.4 24.2 1.51 1.92 2.03 1.56
2017 293 339 465 529 1416 46.0 35.5 28.5 28.2 1.90 1.99 1.66 1.50
2018 432 638 850 935 2086 44.8 28.1 19.4 17.5 1.50 2.07 2.29 1.74
2019 506 787 974 1095 2302 46.1 29.6 19.1 17.2 1.60 1.95 2.04 1.87
2020 458 633 952 992 2369 38.1 28.2 18.2 18.0 1.71 1.98 2.33 2.16
2021 447 385 824 899 1842 49.1 23.1 12.7 16.5 2.53 1.71 1.80 2.05
2022 467 824 543 787 1953 52.5 31.1 17.7 14.3 2.90 2.12 2.30 1.75
2023 417 625 572 602 1634 44.3 20.5 12.0 13.8 2.02 2.60 3.17 2.33
2024 494 745 1030 832 1791 41.9 24.9 17.4 13.6 1.87 2.51 2.34 1.79
2025 480 618 764 1049 1868 55.3 33.5 21.4 17.1 1.81 1.95 2.24 1.64

Table A5.14. Number of stations and stomachs sampled, % empty stomachs, and mean stomach fullness by length group in the Barents Sea winter 1984-2025.

Year Amphipods Krill Shrimp Other invertebrates Capelin Herring Polar cod Blue whiting Cod Haddock Redfish Long rough dab Norway pout Other fish
1984 1.2 7.7 37.5 4.5 13.3           35.8      
1985 15.5 7.9 27.9 44.4                   4.3
1986 14.3 3.8 34.0 14.4 15.2                 18.3
1987 24.8 17.7 10.9 0.2 25.4   21.0              
1988 3.5 19.2   64.3             13.0      
1989 41.1 27.9   31.0                    
1990 5.5 14.2 38.4 3.7 3.8           3.2     31.2
1991 12.2 18.7 6.9 8.4 53.8                  
1992 3.7 3.8 6.9 54.3 17.7                 13.6
1993 35.3 59.0   5.7                    
1994 19.1 40.8 10.9 11.6                   17.6
1995 12.9 6.7 33.9 3.5 7.4   27.8   6.2         1.6
1996 16.3 25.4 15.0 27.4 9.4                 6.5
1997 23.3 35.9 26.5 0.3                   14.0
1998 20.9 30.3 17.2 12.4 16.9             2.3    
1999 9.9 18.4 34.0 6.5   18.0 13.2              
2000 3.3 57.1 17.8 0.0 17.3                 4.5
2001 7.0 31.2 10.1 10.7 26.8 8.6               5.6
2002 15.0 32.1 21.1 13.9 17.9                  
2003 1.6 80.0 10.4 1.4 6.6                  
2004 11.0 44.7 5.9 9.1 14.3 4.2 10.8              
2005 17.2 22.8 16.2 0.3 35.8                 7.7
2006 9.7 49.9 7.8 20.5 12.1                  
2007 6.0 74.6 6.1 0.5 11.6             1.2    
2008 7.3 47.6 31.3 8.7 0.7             0.3   4.1
2009 4.7 61.4 1.9 8.8 18.1                 5.1
2010 3.5 41.7 1.4 1.6 48.2           0.7     2.9
2011 1.5 24.8 14.6 4.0 29.6           8.2     17.3
2012 4.7 20.2 8.5 4.0 53.0                 9.6
2013 2.2 66.2   17.8                   13.8
2014 8.9 42.6 12.7 8.9 26.8                 0.1
2015 2.8 44.8 10.6 13.6 22.1                 6.1
2016 15.7 39.7 9.6 5.6 21.5                 7.9
2017 12.7 6.9 1.0 38.0 0.9           31.0     9.5
2018 9.0 43.9 11.2 9.6 19.0                 7.3
2019 7.5 34.9 13.9 9.8 27.7               2.2 4.0
2020 10.4 53.9 4.4 9.1 13.2       2.2     1.4   5.4
2021 6.0 45.2 8.4 2.5 31.7             2.1 4.1  
2022 2.7 37.3   7.6 49.9                 2.5
2023 7.7 26.7 4.6 11.1 45.7 1.9               2.3
2024 6.1 21.3 6.7 4.5 40.9 11.7               8.8
2025 10.8 18.5 21.1 9.4 36.1 2.7         1.4      

 

Table A5.15. Mean stomach content composition (% of total SFI) of cod ≤ 19 cm from the survey in the Barents Sea winter 1984-2025.

Year Amphipods Krill Shrimp Other invertebrates Capelin Herring Polar cod Blue whiting Cod Haddock Redfish Long rough dab Norway pout Other fish
1984 0.1 0.1 21.0 2.7 40.2   8.1       26.3 0.2   1.3
1985 0.2 0.1 17.0 2.0 69.2 9.3       1.1 0.2     0.9
1986 2.0 1.1 5.9 2.8 56.2 7.0       0.8 23.3     0.9
1987 0.5 1.9 25.2 0.3 53.7       6.6   11.4     0.4
1988 0.9 0.2 20.7 7.0 52.9           18.3      
1989 11.9 7.1 9.0 5.6 33.2   5.4   1.6   25.4 0.5   0.3
1990 0.6 0.5 18.5 0.7 66.7           8.4     4.6
1991 0.1 0.2 4.3 0.2 92.5           2.0     0.7
1992 0.4 0.8 6.4 1.2 88.1       0.4   2.5     0.2
1993 0.1 0.6 8.1 0.3 78.4 5.9 3.8   0.9 1.1 0.1     0.7
1994 1.2 10.2 8.3 1.7 54.9 14.2 4.8   1.7   1.2     1.8
1995 1.4 1.5 9.4 1.8 45.8   10.8 0.6 13.3 3.4 9.3     2.7
1996 1.9 0.5 13.6 1.3 48.9   5.3   24.9   1.8 0.3 0.8 0.7
1997 1.1 3.4 17.6 1.6 42.6   1.2 5.4 10.0         17.1
1998 2.2 2.6 23.5 1.6 47.8 3.4     10.3     5.6   3.0
1999 2.3 4.0 24.5 3.4 45.6 13.5 0.8   3.2 2.7        
2000 0.7 8.0 14.2 0.3 59.4 4.2 5.3   3.6 2.1   0.1   2.1
2001 0.9 2.8 8.5 2.8 69.4 4.7 5.6   4.0         1.3
2002 0.5 1.6 12.2 2.9 71.2 0.7 7.0     1.9       2.0
2003 0.5 2.4 7.3 0.7 71.9 14.4     2.1     0.1 0.5 0.1
2004 2.1 5.2 9.7 1.9 60.6 5.9 6.4   1.9 4.2       2.1
2005 0.6 2.3 12.0 0.9 61.2 3.6 7.7   5.7       4.9 1.1
2006 1.4 1.5 11.8 3.2 66.6 1.6 2.8 2.1   3.4     4.9 0.7
2007 2.3 4.8 15.0 7.3 58.8 0.1       7.7 3.7     0.3
2008 0.5 3.8 11.1 4.7 63.3   3.5     2.4 4.2 1.0   5.5
2009 0.5 6.6 8.8 5.6 71.2   2.4   1.5   0.2     3.2
2010 0.7 5.2 7.4 1.8 74.2 1.0     6.4   2.2     1.1
2011 0.9 3.3 8.3 3.7 74.3       1.1   6.0 0.1 1.1 1.2
2012 0.4 2.6 7.2 2.3 77.1 0.4     7.7         2.3
2013 0.3 7.2 10.4 3.4 68.0   2.1   4.3   0.3 0.1   3.9
2014 2.6 3.5 6.3 5.8 74.7 1.7     1.5 0.1       3.8
2015 0.9 2.4 9.8 3.4 75.9       3.7 1.6   0.3   2.0
2016 2.7 5.8 9.1 6.0 65.2         3.7 0.7     6.8
2017 0.4 3.3 7.8 4.6 67.0 1.7       4.5 2.0 6.7   2.0
2018 1.2 6.5 4.9 6.5 64.6 3.0     7.8 1.7 0.1   2.0 1.7
2019 0.6 4.4 9.2 9.1 64.7 0.5     7.6 1.4       2.5
2020 2.8 12.4 7.4 7.0 64.5       1.4 0.5 0.7 0.4   2.9
2021 2.2 14.1 16.2 10.3 42.1   2.6       4.3 0.9   7.3
2022 0.8 8.4 8.0 3.4 56.1 0.4 5.1   13 0.2 1 0.5   3.1
2023 0.7 2.2 8.5 5.9 68.7 10.1     1.0   0.2 0.1 1.2 1.4
2024 0.9 2.5 6.1 2.3 80.0 4.6 0.9   1.0 1.0       0.7
2025 0.9 1.5 7.6 7.1 74.4 2.9     2 1.9 0.1 0.1   1.5

Table A5.16. Mean stomach content composition (% of total SFI) of cod 20-34 cm from the survey in the Barents Sea winter 1984-2025.

Year Amphipods Krill Shrimp Other invertebrates Capelin Herring Polar cod Blue whiting Cod Haddock Redfish Long rough dab Norway pout Other fish
1984 0.5   18.2 1.3 41.5       0.7 2.6 34.5 0.1 0.6  
1985 0.5   4.7 0.2 88.7 4.2     0.5 0.2 0.9     0.1
1986 0.8 2.5 6.8 3.6 58.4 12.4         15.3     0.2
1987 0.5 0.2 22.9 1.7 47.9 9.2 1.8   4.4 2.0 5.5   3.8 0.1
1988 1.0 1.9 29.1 6.3 51.2     1.5     8.8     0.2
1989 4.1 1.8 11.3 3.3 50.2   7.9   0.2   18.6 0.8 0.2 1.6
1990 0.1 0.1 7.4 1.6 84.8 2.0       1.3 2.5   0.2  
1991 0.1 0.1 1.8 0.6 94.0         1.5 1.2 0.1   0.6
1992   0.1 3.3 3.7 79.7 9.1     0.3 0.3 1.2   1.7 0.6
1993 0.1 0.2 6.0 0.6 85.4 5.6 0.5   0.2 0.4   0.2 0.8  
1994 0.9 14.2 6.9 1.2 48.9 13.5 9.1   2.2 0.4 0.3     2.4
1995 0.9 0.6 12.8 2.2 44.7 6.2 1.2   17.9 8.6 4.7     0.2
1996 1.8 0.7 10.0 2.2 21.6 1.5 2.1 5.5 37.4 6.7 2.5   6.9 1.1
1997 0.9 0.3 14.8 4.3 40.3   5.2 3.6 17.1 3.7 0.5 0.1 1.2 8.0
1998 1.1 0.4 23.2 6.8 50.3 8.5 1.2 1.8 4.1 1.5 0.8     0.3
1999 0.3 0.4 28.0 1.8 44.9 12.0 2.4   1.9 5.7 0.5 0.1 0.4 1.6
2000 0.9 0.3 8.2 0.6 83.5 4.1 0.4   0.7 0.3       1.0
2001 0.4 0.2 6.3 3.3 73.6 5.2 7.3 1.4 1.1 0.5   0.3   0.4
2002 0.2 0.6 10.4 4.2 68.3 2.3 4.8 0.8 3.2 3.9   0.5 0.4 0.4
2003 0.3 1.1 8.2 1.6 68.4 11.1 1.2 0.2 2.7 4.9       0.3
2004 0.9 1.6 14.5 4.5 61.7 6.5 2.3 1.0 4.1 1.5     1.0 0.4
2005 0.7 0.7 13.7 2.1 58.3 3.1 3.6 1.9 0.2 13.2   0.3 1.4 0.8
2006 0.1 0.2 13.1 1.5 64.8 2.0 1.3 1.6 1.1 12.7   0.2 0.3 1.1
2007 3.5 0.8 18.7 2.4 47.6 7.8   0.2 1.1 13.1 0.4 0.4 3.3 0.7
2008 0.3 0.9 11.7 1.3 71.9 2.7 7.4     0.9 1.1 0.3 0.4 1.1
2009 0.8 1.7 6.9 6.9 75.9 1.8 2.4   1.7 0.4 0.6 0.1 0.8  
2010 1.0 1.2 6.3 1.3 81.2 0.4 0.3   2.2 3.6 1.4 0.1 0.6 0.4
2011 0.1 0.7 7.5 3.2 76.0 1.5   1.4 4.2 0.9 2.3 0.1 1.4 0.7
2012 0.5 0.9 7.7 4.3 71.2 0.5 0.8 0.3 4.2 4.4 0.8 0.3 2.6 1.5
2013 0.4 1.5 7.9 4.6 77.9   1.1   3.3 1.6 0.3 0.1 0.3 1.0
2014 0.3 0.6 10.5 3.9 74.4 1.8     1.6 4.3 0.6 0.1 0.9 1.0
2015 0.5 3.2 7.9 2.3 77.1 1.3 0.2 2.3 2.4 1.1 0.3 0.4   1.0
2016 3.3 1.0 8.8 5.7 68.2 1.3     2.2 5.7 1.1 0.7 0.7 1.3
2017 0.1 1.1 12.3 4.1 70.5       0.4 5.6 0.7   2.6 2.6
2018 0.2 2.0 6.5 2.4 70.0 5.9     7.0 5.0 0.3   0.2 0.5
2019 0.5 1.1 9.8 3.0 69.8 3.9     6.1 4.0 0.4 0.1   1.3
2020 1.6 2.5 7.5 3.1 81.1 2.0     1.5 0.1 0.2 0.2   0.2
2021 2.6 3.5 20.0 5.7 55.9 1.4 2.6 0.4 0.6 0.6 4.7 0.5   1.5
2022 0.6 3.2 9.7 2.7 67.2 0.3 3.2   5.7 3.7 2.1 0.4   1.2
2023 0.1 0.3 6.3 3.2 81.7 2.3     1.5 2.7 0.6 0.1 0.3 0.9
2024 0.2 1.2 8.9 2.1 77.5 1.3     2.2 5.5   0.6   0.5
2025 0.2 0.1 4.8 7.2 78.5 0.7 0.3 0.1   7.2 0.5 0.1   0.3

Table A5.17. Mean stomach content composition (% of total SFI) of cod 35-49 cm from the survey in the Barents Sea winter 1984-2025.

Year Amphipods Krill Shrimp Other invertebrates Capelin Herring Polar cod Blue whiting Cod Haddock Redfish Long rough dab Norway pout Other fish
1984 0.4   16.3 1.3 48.1   0.6   3.5 2.4 26.4 0.3   0.7
1985 0.2   5.2 0.4 85.8 3.0   0.3 2.1 0.6 1.2 1.1 0.1  
1986 0.6 0.2 4.4 3.9 53.9 3.2   2.5 9.5 7.9 7.7 0.1 4.1 2.0
1987 1.9 0.1 7.4 6.5 2.2 3.6 3.1 3.3 15.6   35.3 0.3 18.9 1.8
1988 0.9 0.7 11.7 7.0 11.9     4.8 0.0   16.3 4.7   42.0
1989 0.8 1.0 10.1 7.2 50.9   1.1   0.0 0.5 25.1 1.2 0.8 1.3
1990 0.1 0.3 5.2 1.8 74.4 1.1   5.2 0.1 4.8 4.0 0.9 1.8 0.3
1991     1.2 0.5 94.1 0.4     0.6 0.9 1.0 0.1 0.4 0.8
1992 0.2 0.1 5.6 3.8 56.7 17.6 0.1   2.3 4.1 3.7 2.3 2.6 0.9
1993   0.3 2.2 11.4 54.9 16.0 0.3 0.6 5.2 4.3 0.9 0.0 3.8 0.1
1994 0.5 12.9 5.9 2.8 35.4 7.1 4.4 0.2 12.0 4.3 5.8 1.1   7.6
1995 0.5 0.3 5.0 2.2 8.4 8.0 0.7   18.3 20.4 18.8 2.2 0.2 15.0
1996 0.5 0.2 4.1 2.7 9.3 14.6 2.5 0.4 27.2 27.8 6.2 1.8 2.6 0.1
1997 0.2 0.2 10.1 0.8 45.8 5.0 1.1 3.4 5.3 8.2 4.3 0.8 0.6 14.2
1998 1.2 0.2 22.7 3.8 34.5 7.3 1.0 1.2 6.2 6.6 4.1 3.7 2.6 4.9
1999 0.2 0.1 25.8 6.3 26.5 9.8 2.5 0.7 10.3 5.0 0.4 1.4 0.5 10.5
2000 0.9 0.4 7.9 1.6 68.9 6.5 0.8 2.3 2.8 3.4 0.7 1.5   2.3
2001 0.7 0.2 4.4 4.6 71.7 4.4 1.6 2.5 3.3 2.6 0.3 1.9 0.4 1.4
2002 0.2 0.7 5.9 6.5 50.9 3.0 4.2 2.0 9.0 13.0 1.0 1.7 0.7 1.2
2003 0.1 0.2 5.5 4.9 59.1 10.6 1.5 1.1 4.3 9.1 0.5 1.4 0.4 1.3
2004 0.2 0.2 6.5 3.2 48.2 4.9 0.5 2.6 7.6 17.0 1.6 2.7 1.6 3.2
2005 0.3 0.3 5.8 4.2 33.2 2.9 0.8 5.6 7.9 31.2   1.5 2.5 3.8
2006 0.1 0.1 4.6 4.8 45.8 1.8 0.6 6.1 1.8 28.3 1.6 1.8 1.5 1.1
2007 0.5 0.2 8.3 5.0 29.2 18.4   1.9 7.8 20.8 2.0 2.3 2.7 0.9
2008 0.1 0.4 4.9 2.7 60.7 7.5 0.3 0.4 0.9 17.4 0.8 1.8 0.9 1.2
2009 0.2 0.3 5.5 4.2 53.0 8.6 0.8 0.4 4.1 12.9 1.5 2.9 3.9 1.7
2010 0.6 0.3 2.5 2.3 72.7 1.7 0.2 0.1 3.5 10.6 0.9 2.0 2.5 0.1
2011 0.1 0.3 3.1 2.9 82.0 0.4 0.6   2.6 5.2 0.9 0.5 1.1 0.3
2012 0.1 0.2 4.0 7.1 60.9   0.1 0.1 2.6 16.7 0.5 1.1 3.8 2.8
2013 0.3 0.7 4.1 7.6 67.9 0.2 0.4 0.6 5.1 8.3 0.9 1.4 1.8 0.7
2014 0.5 0.5 5.6 10.4 55.4 2.2   0.2 6.3 10.9 1.0 3.1 1.6 2.3
2015 0.2 0.1 4.1 6.7 69.9 1.1   1.1 2.9 6.8 2.1 1.3 2.4 1.3
2016 1.0 0.9 3.4 14.8 60.0 2.9 0.1 0.7 5.3 6.5 0.7 2.7 0.4 0.6
2017 0.1 0.6 2.9 4.2 74.2 1.4   1.5 0.6 10.7 1.3 1.2 1.0 0.3
2018 0.1 0.9 3.7 9.5 51.7 2.5 0.1 0.1 8.1 19.3 0.7 2.0 0.7 0.6
2019 0.4 0.5 3.8 6.6 68.4 2.8 0.1 0.2 5.5 7.4 1.0 0.5 1.9 0.9
2020 0.4 0.8 2.6 7.5 59.3 5.5 0.0 0.2 13.4 4.8 1.8 1.9 1.0 0.8
2021 0.4 1.1 5.2 9.3 51.0 10.6 3.9 0.1 3.6 8.1 2.3 2.8   1.6
2022 0.3 0.8 4.9 13.7 57.8 2.1 1.6 0.3 3.1 6.1 2.9 3.9 0.3 2.2
2023 0.1 0.5 4.0 10.5 61.2 7.0 0.1 0.1 4.4 4.9 2.5 1.0 0.6 3.1
2024 0.2 0.5 5.5 10.0 53.0 3.8 1.4 0.1 8.1 10.2 2.5 1.4 1.1 2.5
2025 0.1 0.1 4.3 9.1 48.5 3.8   0.1 1.5 27.7 1.5 1.3 0.6 1.4

Table A5.18. Mean stomach content composition (% of total SFI) of cod ≥ 50 cm from the survey in the Barents Sea winter 1984-2025.

Age group   Total   Biomass   (‘000 t)  
Area  1   2   3   4   5   6   7   8   9   10   11   12   13   14   15+  
A  139.57 52.24 9.03 5.92 5.95 0.89 0.63 0.50 0.49 0.11 0.00 0.00 0.00 0.00 0.00 215.34 23.7
B  19.80 15.17 7.88 4.27 4.30 0.78 0.33 0.36 0.14 0.00 0.02 0.00 0.00 0.00 0.00 53.04 14.4
C  120.34 42.79 4.59 4.68 5.12 1.07 1.03 0.31 0.19 0.06 0.00 0.02 0.00 0.00 0.00 180.21 20.2
D  599.20 309.73 64.37 104.74 50.50 5.90 3.41 2.77 1.79 0.31 0.00 0.00 0.00 0.00 0.00 1142.72 156.1
D' 15.35 233.54 57.35 60.66 25.99 1.85 0.21 0.14 0.12 0.00 0.00 0.00 0.00 0.00 0.00 395.20 76.7
E  22.44 1.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.04 0.6
S  109.94 16.35 4.74 1.82 0.87 0.04 0.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 133.85 7.2
N  273.77 25.01 4.55 4.97 4.41 0.08 0.04 0.03 0.00 0.01 0.00 0.00 0.00 0.00 0.00 312.88 21.5
ABCD  878.90 419.93 85.87 119.60 65.88 8.65 5.40 3.94 2.61 0.48 0.02 0.02 0.00 0.00 0.00 1591.31 214.4
Sum  1300.40 696.44 152.52 187.04 97.15 10.62 5.72 4.11 2.74 0.49 0.02 0.02 0.00 0.00 0.00 2457.27 320.4

 

11.3 - Haddock

Table A6.1. HADDOCK. Abundance indices (numbers in millions) for the main areas of the Barents Sea from acoustic survey winter 2026 estimated by StoX software.

Age group Total Biomass (‘000 t)
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15+
1994 887.82 187.96 348.73 626.65 121.38 8.55 0.70 0.33 0.61 0.48 1.46 0.16 0.00 0.00 0.00 2184.83 643.51
1995 1198.18 88.59 41.47 121.49 395.37 47.61 2.80 0.05 0.12 0.03 0.00 0.54 0.14 0.00 0.00 1896.39 508.78
1996 132.60 94.52 29.97 22.09 68.65 143.69 5.67 0.93 0.00 0.01 0.00 0.02 0.04 0.00 0.00 498.19 248.35
19971 508.87 26.51 57.27 22.22 15.47 56.13 62.77 4.68 0.07 0.00 0.00 0.01 0.05 0.06 0.00 754.11 201.67
19981 210.96 150.99 33.78 58.79 24.20 7.70 14.06 20.69 1.44 0.02 0.04 0.00 0.00 0.00 0.12 522.78 150.98
1999 653.40 30.11 83.67 21.64 22.10 6.17 1.55 3.88 2.72 0.03 0.00 0.02 0.00 0.00 0.00 825.29 107.86
2000 1063.01 404.77 36.39 75.53 14.01 12.61 1.57 0.53 2.01 0.69 0.17 0.13 0.02 0.00 0.00 1611.44 189.81
2001 753.01 266.12 233.45 40.20 41.38 2.20 1.61 0.15 0.09 0.14 0.28 0.09 0.09 0.00 0.02 1338.83 206.40
2002 1315.15 267.90 255.20 201.84 18.47 11.70 1.59 0.29 0.03 0.13 0.26 0.09 0.05 0.00 0.00 2072.70 298.25
2003 2743.74 362.35 203.68 184.57 136.04 12.26 6.01 0.26 0.14 0.26 0.34 0.09 0.07 0.00 0.00 3649.81 444.48
2004 528.97 466.54 151.01 101.85 107.82 57.68 7.61 1.15 0.29 0.04 0.05 0.05 0.04 0.08 0.00 1423.18 322.95
2005 2276.46 143.98 221.33 115.67 57.43 56.71 12.69 0.38 0.32 0.01 0.00 0.00 0.00 0.00 0.00 2884.98 305.99
20062 2091.11 624.78 56.32 123.84 47.37 19.26 13.64 3.23 0.08 0.15 0.00 0.03 0.00 0.00 0.09 2979.90 297.84
20071 2015.71 953.50 209.28 46.14 80.57 28.92 10.00 5.05 2.26 0.30 0.18 0.00 0.00 0.00 0.05 3351.97 401.72
2008 778.39 1753.54 812.41 303.04 90.02 74.12 7.41 12.77 1.63 0.14 0.16 0.18 0.00 0.00 0.00 3833.81 920.38
2009 443.93 209.05 883.68 629.98 266.65 38.87 14.57 1.26 0.34 0.66 0.00 0.05 0.00 0.00 0.00 2489.04 865.44
2010 1559.42 86.03 128.07 631.03 603.99 166.96 12.07 2.94 0.96 0.99 0.10 0.06 0.00 0.00 0.00 3192.62 1035.93
2011 428.46 288.27 54.16 84.23 313.02 292.21 54.91 1.71 0.96 0.23 0.00 0.20 0.07 0.00 0.00 1518.43 712.08
20123 1583.44 94.54 191.63 48.84 88.12 310.60 172.52 30.09 0.52 0.34 0.02 0.13 0.00 0.00 0.00 2520.79 814.60
2013 292.71 407.16 67.29 146.77 35.41 53.03 223.77 102.68 14.12 0.25 0.00 0.00 0.00 0.00 0.00 1343.19 759.62
2014 1838.71 109.92 334.82 39.12 108.72 23.18 34.77 86.36 36.63 1.66 0.52 0.00 0.00 0.01 0.00 2614.42 583.94
2015 1593.12 246.59 24.35 189.40 26.63 46.13 9.22 22.45 21.33 9.86 0.56 0.15 0.09 0.00 0.00 2189.88 387.71
2016 1276.00 107.18 71.81 12.08 59.62 12.52 17.28 7.48 17.21 12.74 2.76 0.48 0.00 0.03 0.02 1597.21 274.45
20173 3343.93 331.42 81.15 65.05 4.81 34.81 6.24 7.93 1.78 7.06 6.10 2.34 0.44 0.00 0.00 3893.06 338.87
2018 2925.90 810.16 171.03 62.74 64.40 6.77 15.57 2.75 2.57 1.56 5.56 2.99 1.87 0.14 0.00 4074.01 410.39
2019 1544.96 687.80 507.61 146.22 31.73 21.88 4.72 3.46 1.37 1.57 0.38 0.39 0.33 0.06 0.09 2952.57 396.54
20203 272.94 260.72 286.32 306.38 79.18 22.38 11.59 1.84 1.36 0.83 0.85 1.22 0.99 0.96 0.12 1247.68 381.58
20213 431.68 15.69 50.76 130.37 181.80 19.35 5.44 0.94 0.81 0.48 0.07 0.21 0.07 0.05 0.08 837.80 258.47
2022 1797.1 70.2 11.4 63.4 95.3 101.2 11.8 0.82 0.14 0.20 0.70 0.00 0.00 0.07 0.00 2152.2 282.60
2023 1032.7 511.1 77.0 9.02 51.3 53.3 38.1 2.69 0.13 0.28 0.01 0.02 0.00 0.00 0.05 1775.5 275.0
2024 1690.20 634.03 337.40 44.03 3.70 14.95 12.49 7.80 0.21 0.00 0.12 0.00 0.00 0.00 0.00 2744.93 280.3
2025 4070.49 529.17 369.45 173.10 22.81 3.68 10.10 7.51 3.44 0.17 0.04 0.00 0.00 0.00 0.00 5189.96 383.58
2026 1300.40 696.44 152.52 187.04 97.15 10.62 5.72 4.11 2.74 0.49 0.02 0.02 0.00 0.00 0.00 2457.27 320.4

Table A6.2. HADDOCK. Abundance indices (numbers in millions) from acoustic surveys in the Barents Sea winter 1994-2026 estimated by StoX software.

1 Indices raised to also represent the Russian EEZ. 2 Not complete coverage in southeast due to restrictions, strata 7 area set to default and strata 13 as in 2005. 3 Indices raised to also represent uncovered parts of the Russian EEZ.

Age group Total Biomass (‘000 t)
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15+
2014 135.0 0.88 10.3 0.92 0.81 0.80 0.96 1.84 1.31 0.20 0.02 0 0 0 0 153.0 17.9
2015 71.2 22.2 0.71 17.9 1.10 6.77 0.90 1.31 4.01 3.03 0.14 0 0.09 0 0 129.4 48.2
2016 15.7 1.77 3.32 0.26 3.67 0.70 0.71 0.62 1.75 0.83 0.33 0 0 0 0 29.7 16.1
2017 80.1 8.20 1.23 2.28 0.40 2.60 0.40 0.92 0.29 0.64 0.61 0.33 0 0 0 98.0 18.1
2018 855.7 46.4 11.7 2.57 3.48 1.15 2.97 0.45 0.33 0.25 0.54 0.39 0.38 0 0 926.4 54.6
2019 67.68 25.50 16.12 5.59 1.07 1.01 0.13 0.11 0.05 0.03 0.03 0.09 0.03 0.05 0.00 118.11 17.84
2020 1.54 1.18 12.6 12.4 3.09 2.40 0.55 0.49 0.16 0.09 0.04 0.08 0.08 0.05 0 34.8 22.7
2021 5.47 0.44 0.23 4.87 7.44 0.73 0.28 0.14 0.08 0.01 0.05 0.02 0.05 0.00 0.00 19.8 13.4
2022 102.5 3.81 0.05 0.61 3.72 1.70 0.31 0.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 112.7 51.8
2023 129.6 9.22 0.52 0.00 0.13 0.71 0.17 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 140.4 6.43
2024 295.73 13.84 8.39 0.66 0.02 0.04 0.18 0.14 0.02 0.00 0.00 0.00 0.00 0.00 0.00 319.01 13.0
2025 238.78 5.60 7.70 8.03 0.37 0.01 0.07 0.08 0.02 0.00 0.01 0.00 0.00 0.00 0.00 260.68 16.6
2026 273.77 25.01 4.55 4.97 4.41 0.08 0.04 0.03 0.00 0.01 0.00 0.00 0.00 0.00 0.00 312.88 21.5

Table A6.3. HADDOCK. Abundance indices (numbers in millions) for new strata 24-26 from acoustic surveys in the Barents Sea winter 2014-2026 estimated by StoX software. In 2020, the main index was revised to include these strata.

Age group
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1994 11 12 10 9 12 21 44 53 39 55 31 103 - -
1995 16 22 24 15 10 15 34 128 85 114 - 55 90 -
1996 20 27 31 23 16 15 22 44 - 120 - 98 108 -
19971 12 17 14 16 16 12 14 33 53 - - 121 63 74
19981 14 15 15 13 14 21 17 15 50 107 109 - - -
1999 19 24 21 28 22 23 32 34 26 118 - 123 - -
2000 9 9 21 12 18 17 28 45 30 39 72 102 104 -
2001 17 16 16 25 16 30 35 65 66 96 62 94 86 -
2002 8 10 12 10 16 16 29 51 111 69 60 53 71 -
2003 11 11 11 9 15 25 38 80 106 90 76 102 107 -
2004 37 23 23 30 33 17 21 26 45 65 65 86 64 66
2005 10 16 11 15 12 16 19 59 76 104 - - - -
20062 12 10 27 20 12 15 20 33 66 67 - 78 - -
20071 9 7 9 12 12 15 21 29 40 52 88 - - -
2008 13 10 10 10 21 24 29 62 94 263 84 137 - -
2009 14 13 9 11 14 19 19 43 79 48 - 107 - -
2010 15 17 10 10 9 13 27 34 49 49 108 92 - -
2011 15 13 16 12 11 10 15 40 58 94 - 84 115 -
20122 16 28 16 35 24 20 20 27 86 50 105 68 - -
2013 14 13 22 11 22 16 13 15 26 59 - - - -
2014 13 19 12 20 18 17 16 15 15 44 79 - - 109
2015 14 17 24 13 23 21 27 23 20 55 64 65 - -
2016 11 15 15 19 12 14 15 19 17 15 30 43 - 70
20172 6 9 15 13 22 16 22 23 34 29 24 36 67 -
2018 8 8 9 13 17 29 22 29 34 30 27 28 54 81
2019 9 8 8 8 13 14 29 26 48 35 64 35 72 115
20202 15 14 11 12 12 14 19 26 30 48 54 49 43 50
20212 15 25 19 34 45 21 37 48 78 94 61 121 57 87
2022 14 17 26 15 13 13 20 41 71 77 57 - - 86
2023 11 12 15 19 16 15 17 30 77 113 116 117 - -
2024 9 13 14 22 27 16 18 19 71 - 92 - - -
2025 8 10 14 14 17 21 17 19 20 54 83 - - -
2026 10 13 16 16 14 18 22 20 20 35 132 111 - -

Table A6.4. HADDOCK. Estimates of coefficients of variation (%) for acoustic abundance indices. Barents Sea winter 1994-2026.

1 Russian EEZ not covered. 2 Russian EEZ partly covered.

Age group   Total   Biomass   (‘000 t)  
Area  1   2   3   4   5   6   7   8   9   10   11   12   13   14   15+  
A  174.02 98.64 13.84 7.74 6.60 0.89 0.70 0.47 0.54 0.10 0.00 0.00 0.00 0.00 0.00 303.54 31.4
B  32.06 24.46 15.36 5.69 5.09 0.43 0.19 1.50 0.15 0.00 0.02 0.00 0.00 0.00 0.00 84.95 20.6
C  87.28 41.28 3.67 3.06 4.58 0.56 0.56 0.35 0.30 0.04 0.00 0.02 0.00 0.00 0.00 141.7 16.0
D  777.71 388.97 69.34 155.42 57.07 5.89 4.77 2.56 1.66 0.40 0.00 0.00 0.00 0.00 0.00 1463.79 191.5
D'  27.99 426.59 104.85 98.27 51.69 5.69 0.22 0.19 0.16 0.00 0.00 0.00 0.00 0.00 0.00 715.64 138.4
E  61.65 4.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66.23 1.5
S  99.80 25.82 5.93 2.28 1.07 0.03 0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 135.02 9.2
N  352.06 32.19 5.37 5.22 5.71 0.04 0.03 0.03 0.00 0.01 0.00 0.00 0.00 0.00 0.00 400.66 28.5
ABCD  1071.07 553.35 102.20 171.91 73.35 7.78 6.22 4.88 2.65 0.54 0.02 0.02 0.00 0.00 0.00 1993.99 259.5
Sum  1612.56 1042.53 218.35 277.67 131.82 13.54 6.56 5.11 2.81 0.56 0.02 0.02 0.00 0.00 0.00 3311.54 437.1

Table A6.5. HADDOCK. Abundance indices from bottom trawl hauls for main areas of the Barents Sea winter 2026 (numbers in millions). Bootstrap mean estimates.

Age group Total Biomass (‘000 t)4
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15+
1994 604.20 224.79 314.53 436.25 46.18 3.54 0.16 0.13 0.20 0.15 0.47 0.03 0.00 0.00 0.00 1026.43 403.7
1995 1429.04 199.52 54.86 167.10 343.38 29.62 1.44 0.03 0.04 0.02 0.00 0.29 0.09 0.00 0.00 2225.43 443.9
1996 300.78 265.08 55.84 31.33 150.77 238.11 16.13 1.15 0.00 0.01 0.00 0.03 0.03 0.00 0.00 1059.26 431.9
19971 1117.83 90.81 79.63 39.86 18.25 61.57 88.41 3.28 0.08 0.00 0.00 0.00 0.03 0.02 0.00 1499.77 273.3
19981 248.27 196.70 21.68 36.75 11.84 1.29 9.20 7.21 0.65 0.02 0.02 0.00 0.00 0.00 0.03 533.66 91.7
1999 1207.98 83.20 56.92 15.87 9.42 2.83 0.81 1.28 0.77 0.02 0.00 0.02 0.00 0.00 0.00 1379.12 86.7
2000 832.30 437.22 24.08 35.24 6.79 4.13 0.68 0.08 0.80 0.22 0.03 0.03 0.01 0.00 0.00 1341.61 124.1
2001 1230.98 446.84 294.00 26.25 23.00 1.63 0.75 0.06 0.06 0.05 0.16 0.09 0.02 0.00 0.00 2023.89 227.7
2002 1700.19 475.31 312.87 185.45 12.42 8.04 0.85 0.22 0.01 0.09 0.16 0.04 0.04 0.00 0.00 2695.69 308.4
2003 3327.32 471.68 352.24 174.45 72.71 5.10 1.68 0.12 0.10 0.10 0.10 0.01 0.01 0.00 0.00 4405.62 411.5
2004 700.86 706.61 173.13 100.52 77.02 51.28 7.41 0.91 0.13 0.04 0.05 0.04 0.04 0.07 0.00 1818.11 307.6
2005 4473.16 386.39 317.89 141.06 50.66 61.19 10.08 0.25 0.08 0.01 0.00 0.00 0.00 0.00 0.00 5440.77 431.0
20062 4944.60 1310.22 78.80 130.76 46.05 20.87 16.21 3.18 0.09 0.15 0.00 0.05 0.00 0.00 0.04 6551.02 454.2
20071 3731.19 1684.83 443.27 81.78 84.67 26.28 5.41 2.20 1.38 0.80 0.07 0.00 0.00 0.00 0.03 6061.91 594.8
2008 853.09 2042.01 1591.03 583.61 53.08 54.73 6.79 10.25 0.23 0.05 0.08 0.05 0.00 0.00 0.00 5195.00 1100.5
2009 562.61 317.05 1230.43 751.01 368.33 25.41 12.44 0.85 0.09 0.35 0.00 0.01 0.00 0.00 0.00 3268.58 976.7
2010 1634.82 79.89 102.45 510.45 443.76 139.32 7.99 1.02 0.39 0.47 0.05 0.05 0.00 0.00 0.00 2920.66 759.4
2011 676.31 353.87 52.88 123.63 469.48 290.04 65.24 1.42 1.12 0.00 0.00 0.15 0.03 0.00 0.00 2034.17 827.5
20123 1866.96 137.38 316.08 28.79 74.71 267.94 154.60 24.77 3.11 0.28 0.04 0.08 0.00 0.00 0.00 2874.74 740.3
2013 344.58 490.28 57.44 143.98 22.02 33.62 191.14 69.38 6.11 0.08 0.00 0.00 0.00 0.00 0.00 1358.63 600.9
2014 1281.40 123.95 381.17 32.73 104.40 23.26 50.04 97.54 38.69 1.82 0.59 0.00 0.00 0.02 0.00 2135.61 656.0
2015 1133.97 342.02 30.61 187.04 43.60 39.44 14.67 18.73 30.74 9.70 0.33 0.14 0.02 0.00 0.00 1851.01 404.4
2016 2299.37 561.96 163.38 34.34 115.60 22.41 41.95 12.44 32.40 27.64 4.34 0.98 0.00 0.14 0.05 3317.00 569.4
20173 5065.43 770.04 134.94 105.48 7.55 55.34 9.69 15.60 2.53 10.33 8.74 4.06 0.73 0.00 0.00 6190.46 566.0
2018 3823.29 1675.64 336.31 86.66 65.76 7.77 15.59 3.62 2.56 1.70 4.72 4.00 1.38 0.13 0.00 6029.13 574.8
2019 1898.20 1125.27 1075.55 187.22 49.40 17.00 4.04 2.95 0.74 1.08 0.19 0.35 0.20 0.05 0.00 4362.24 600.0
20203 110.62 267.79 424.22 586.99 99.12 22.08 6.06 2.61 1.04 0.67 0.23 0.71 0.70 0.49 0.02 1523.35 537.8
20213  405.82 24.99 111.35 176.57 265.49 19.32 3.57 0.68 0.19 0.11 0.08 0.29 0.17 0.04 0.03 1008.70 342.0
2022 1662.10 110.30 12.20 86.50 121.70 113.60 9.10 0.62 0.11 0.16 0.24 0.00 0.00 0.04 0.00 2116.67 316.7
2023 1343.80 583.90 82.50 8.10 50.80 49.30 33.50 2.17 0.11 0.24 0.02 0.02 0.00 0.00 0.05 2154.51 275.0
2024 2179.51 650.98 346.71 40.85 3.34 15.76 12.59 7.72 0.36 0.00 0.12 0.00 0.00 0.00 0.00 3257.94 294.40
2025 4369.68 843.01 477.03 186.55 17.78 2.42 7.56 5.05 2.56 0.11 0.04 0.00 0.00 0.00 0.00 5911.80 434.8
2026 1612.56 1042.53 218.35 277.67 131.82 13.54 6.56 5.11 2.81 0.56 0.02 0.02 0.00 0.00 0.00 3311.54 437.1

 

Table A6.6. HADDOCK. Abundance indices (numbers in millions) from bottom trawl surveys in the Barents Sea winter 1994-2026. Bootstrap mean estimates.

1 Indices raised to also represent the Russian EEZ. 2 Not complete coverage in southeast due to restrictions, strata 7 area set to default and strata 13 as in 2005. 3 Indices raised to also represent uncovered parts of the Russian EEZ. 4 1994-2020: for years with raising, estimated based on relationship between unraised numbers-at-age and biomass-at-age from StoX baseline run. From 2021: estimated based on relationship between unraised numbers-at-age and biomass-at-age bootstrap mean estimates from StoX.

Age group Total Biomass (‘000 t)
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15+
2014 128.7 1.26 12.3 0.65 2.22 0.12 3.38 1.16 0.74 0.07 0.0 0.0 0.0 0.0 0 150.6 20.9
2015 49.0 17.4 0.33 13.2 0.46 4.30 0.88 0.56 3.51 2.16 0.0 0.0 0.0 0.0 0 91.8 34.5
2016 42.6 4.50 10.2 0.51 9.69 2.45 1.43 2.41 4.80 3.13 0.36 0.0 0.0 0.0 0 82.0 45.7
2017 199.6 15.7 3.76 5.83 2.18 7.56 0.80 2.07 1.06 1.82 2.39 0.72 0.0 0.0 0 243.5 51.6
2018 1141.9 65.3 17.9 3.20 5.03 2.27 3.66 0.90 0.54 0.35 0.72 0.48 0.56 0.0 0 1242.8 77.9
2019 115.3 45.6 30.1 7.74 3.03 1.13 0.15 0.14 0.0 0.07 0.0 0.06 0.0 0.0 0.02 203.4 29.9
2020 3.61 3.93 35.1 33.1 8.11 7.89 1.93 1.05 0.54 0.28 0.13 0.25 0.27 0.11 0 96.3 63.2
2021 12.6 1.08 0.40 7.74 13.4 1.29 0.61 0.14 0.09 0.02 0.06 0.09 0.11 0.00 0.00 37.6 22.8
2022 79.3 2.86 0.04 0.32 3.00 0.59 0.09 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.2 6.81
2023 129.6 9.22 0.52 0.00 0.13 0.71 0.17 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 140.4 6.43
2024 413.96 14.58 7.52 0.44 0.00 0.03 0.16 0.14 0.02 0.00 0.00 0.00 0.00 0.00 0.00 436.9 15.6
2025 370.95 8.60 10.67 10.66 0.47 0.01 0.09 0.12 0.03 0.00 0.01 0.00 0.00 0.00 0.00 401.61 25.5
2026 352.06 32.19 5.37 5.22 5.71 0.04 0.03 0.03 0.00 0.01 0.00 0.00 0.00 0.00 0.00 400.66 28.5

 

Table A6.7. HADDOCK. Abundance indices (numbers in millions) for new strata 24-26 from bottom trawl surveys in the Barents Sea winter 2014-2026. 2014-2020: baseline estimates, from 2021: bootstrap mean estimates.

Age group
Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1994 11 13 15 13 15 29 52 45 33 52 38 97 - -
1995 12 19 28 29 16 21 38 180 75 97 - 58 97 -
1996 14 13 12 25 30 24 61 64 - 98 - 95 96 -
19971 13 35 13 15 17 21 18 57 54 - - - 64 92
19981 15 13 13 14 16 25 18 16 34 107 106 - - -
1999 15 37 14 24 21 24 25 31 22 89 - 97 - -
2000 9 9 18 9 16 14 34 51 31 34 63 91 105 -
2001 12 17 12 20 11 36 33 47 59 51 47 86 62 -
2002 9 11 10 10 22 17 27 39 81 60 48 51 75 -
2003 16 24 28 13 11 19 31 59 60 71 56 92 93 -
2004 9 12 15 16 10 13 28 24 43 56 58 93 60 54
2005 9 17 12 22 14 22 14 70 48 93 - - - -
20062 14 14 18 12 13 16 21 30 44 70 - 63 - -
20071 10 8 9 19 12 17 24 26 44 50 61 - - -
2008 12 17 15 13 19 30 27 81 42 81 68 88 - -
2009 13 20 15 21 24 18 32 27 91 68 - 94 - -
2010 10 17 18 22 18 18 25 29 42 55 144 167 - -
2011 10 10 14 25 18 13 20 38 73 - - 81 84 -
20122 19 28 17 16 15 13 15 33 73 48 83 61 - -
2013 12 12 13 14 27 24 27 14 26 50 - - - -
2014 7 26 12 22 16 22 20 14 24 40 55 - - 99
2015 7 13 26 14 44 11 25 18 21 28 40 51 97 -
2016 22 25 13 42 11 15 20 15 15 19 27 51 - 62
20172 5 13 15 12 20 14 21 27 25 18 21 36 77 -
2018 7 16 13 12 10 17 15 23 18 18 18 20 32 52
2019 9 11 15 12 27 12 40 20 30 30 35 29 35 46
20202 16 9 11 14 14 19 22 29 27 40 39 29 24 37
20212 12 22 17 16 22 13 21 25 47 46 47 66 42 69
2022 10 12 27 17 23 18 19 25 52 66 49 - - 65
2023  8  11  16  15  19  14  14  18  58  50  94  134  -  - 
2024 9 11 17 24 19 16 12 15 51 - 81 - - -
2025 14 16 21 17 13 18 13 11 17 43 62 - - -
2026 8 11 16 26 18 29 33 27 18 29 99 94 - -

Table A6.8. HADDOCK. Estimates of coefficients of variation (%) for swept area abundance indices. Barents Sea winter 1994-2026.

1 Russian EEZ not covered. 2 Russian EEZ partly covered.

Year 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9
      Acoustic investigations      
1994-95 2.30 1.51 1.05 0.46 0.94 1.12 2.64 1.01
1995-96 2.54 1.08 0.63 0.57 1.01 2.13 1.09 -
1996-97 1.61 0.50 0.30 0.35 0.20 0.83 0.19 2.60
1997-98 1.21 -0.24 -0.03 -0.09 0.70 1.38 1.11 1.18
1998-99 1.95 0.59 0.45 0.98 1.37 1.60 1.29 2.03
1999-00 0.48 -0.19 0.10 0.43 0.56 1.37 1.07 0.66
2000-01 1.38 0.55 -0.10 0.60 1.85 2.06 2.28 1.77
2001-02 1.03 0.04 0.15 0.78 1.26 0.32 1.71 1.67
2002-03 1.29 0.27 0.32 0.39 0.41 0.67 1.81 0.73
2003-04 1.77 0.88 0.69 0.54 0.86 0.48 1.65 -0.11
2004-05 1.30 0.75 0.27 0.57 0.64 1.51 3.00 1.28
2005-06 1.29 0.94 0.58 0.89 1.09 1.43 1.37 1.56
2006-07 0.79 1.09 0.20 0.43 0.49 0.66 0.99 0.36
2007-08 0.14 0.16 -0.37 -0.67 0.08 1.36 -0.25 1.13
2008-09 1.31 0.69 0.25 0.13 0.84 1.62 1.77 3.63
2009-10 1.64 0.49 0.34 0.04 0.47 1.17 1.60 0.27
2010-11 1.69 0.46 0.42 0.70 0.73 1.11 1.95 1.12
2011-12 1.51 0.41 0.10 -0.05 0.01 0.53 0.60 1.20
2012-13 1.36 0.34 0.27 0.32 0.51 0.33 0.52 0.76
2013-14 0.98 0.20 0.54 0.30 0.42 0.42 0.95 1.03
2014-15 2.01 1.51 0.57 0.39 0.86 0.92 0.44 1.40
2015-16 2.70 1.23 0.70 1.16 0.76 0.98 0.21 0.26
2016-17 1.35 0.28 0.10 0.92 0.54 0.69 0.78 1.43
2017-18 1.42 0.67 0.25 0.01 -0.36 0.79 0.82 1.13
2018-19 1.45 0.46 0.15 0.68 1.08 0.34 1.57 0.70
2019-20 1.78 0.88 0.50 0.61 0.35 0.64 0.98 0.88
2020-21 2.86 1.64 0.79 0.52 1.41 1.41 2.51 0.82
2021-22 1.82 0.32 -0.22 0.31 0.59 0.49 1.89 1.90
2022-23 1.26 -0.09 0.23 0.21 0.58 0.98 1.48 1.84
2023-24 0.49 0.42 0.56 0.89 1.23 1.45 1.59 2.55
2024-25 1.16 0.54 0.67 0.66 0.01 0.39 0.51 0.82
2025-26 1.77 1.24 0.68 0.58 0.76 -0.44 0.90 1.01
    Bottom trawl investigations    
1994-95 1.11 1.41 0.63 0.24 0.44 0.90 1.87 1.10
1995-96 1.68 1.27 0.56 0.10 0.37 0.61 0.23 -
1996-97 1.20 1.20 0.34 0.54 0.90 0.99 1.59 2.64
1997-98 1.74 1.43 0.77 1.21 2.65 1.90 2.51 1.62
1998-99 1.09 1.24 0.31 1.36 1.43 0.47 1.97 2.24
1999-00 1.02 1.24 0.48 0.85 0.82 1.42 2.27 0.47
2000-01 0.62 0.40 -0.09 0.43 1.42 1.70 2.47 0.33
2001-02 0.95 0.36 0.46 0.75 1.05 0.66 1.24 1.84
2002-03 1.28 0.30 0.58 0.94 0.89 1.56 1.96 0.74
2003-04 1.55 1.00 1.25 0.82 0.35 -0.37 0.61 -0.11
2004-05 0.60 0.80 0.20 0.69 0.23 1.63 3.39 2.43
2005-06 1.23 1.59 0.89 1.12 0.89 1.33 1.15 0.97
2006-07 1.08 1.08 -0.04 0.43 0.56 1.35 2.00 0.84
2007-08 0.60 0.06 -0.28 0.43 0.44 1.35 -0.64 2.25
2008-09 0.99 0.51 0.75 0.46 0.74 1.48 2.08 4.73
2009-10 1.95 1.13 0.88 0.53 0.97 1.16 2.50 0.79
2010-11 1.53 0.41 -0.19 0.08 0.43 0.76 1.73 -0.10
2011-12 1.59 0.11 0.61 0.50 0.56 0.63 0.97 -0.79
2012-13 1.34 0.87 0.79 0.27 0.80 0.34 0.80 1.40
2013-14 1.02 0.25 0.56 0.32 -0.05 -0.40 0.67 0.58
2014-15 1.32 1.40 0.71 -0.29 0.97 0.46 0.98 1.15
2015-16 0.70 0.74 -0.11 0.48 0.67 -0.06 0.17 -0.55
2016-17 1.09 1.43 0.44 1.51 0.74 0.84 0.99 1.59
2017-18 1.11 0.83 0.44 0.47 -0.03 1.27 0.98 1.81
2018-19 1.22 0.44 0.59 0.56 1.35 0.65 1.67 1.59
2019-20 1.96 0.98 0.61 0.64 0.81 1.03 0.44 1.04
2020-21  1.49  0.88  0.88  0.79  1.64  1.82  2.19  2.62 
2021-22  1.30  0.72  0.25  0.37  0.85  0.75  1.75  1.82 
2022-23  1.05  0.29  0.41  0.53  0.90  1.22  1.43  1.73 
2023-24 0.72 0.52 0.70 0.89 1.17 1.37 1.47 1.80
2024-25 0.95 0.31 0.62 0.83 0.32 0.73 0.91 1.1
2025-26 1.43 1.35 0.54 0.35 0.27 -1.00 0.39 0.59

Table A6.9. HADDOCK. Survey mortality from surveys in the Barents Sea winter 1994-2026.

Age/ Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1994 14.5 19.9 29.3 38.1 47.8 54.0 61.0 64.3 70.4 64.8 64.1 + - -
1995 15.1 18.2 28.6 34.0 42.8 51.3 58.9 + + + - + + -
1996 15.3 20.8 28.0 36.9 41.2 47.2 55.0 59.9 - + - + + -
1997 15.7 19.7 27.4 34.1 39.5 47.3 50.7 55.0 62.8 - - - + +
1998 14.5 22.5 29.3 37.3 43.1 48.4 52.1 53.3 58.2 + + - - -
1999 14.4 18.3 32.3 38.8 46.5 51.9 56.0 55.2 58.8 + - + - -
2000 15.5 21.6 29.9 42.0 47.0 51.1 53.4 59.1 59.3 62.0 + + + -
2001 14.6 22.1 32.1 37.6 48.0 50.4 59.1 56.2 64.6 66.5 68.2 + + -
2002 15.1 20.8 29.1 39.8 45.2 51.7 57.8 60.7 + + 64.6 68.0 + -
2003 15.8 23.9 26.4 36.6 45.8 49.7 54.8 60.9 63.9 61.6 67.3 + + -
2004 14.2 22.1 30.1 35.7 42.8 49.8 49.8 59.0 63.0 73.5 75.9 + + 74.1
2005 14.8 20.5 29.9 36.1 40.5 48.3 51.6 55.7 60.8 + - - - -
2006 14.5 22.0 30.7 37.9 43.3 47.3 50.7 56.7 60.4 + - + - -
2007 15.5 22.9 29.0 35.7 45.8 48.0 53.5 57.4 57.3 68.7 + - - -
2008 15.7 23.8 29.6 37.8 42.8 46.5 53.1 53.8 59.5 + + + - -
2009 14.3 22.3 29.7 35.5 41.7 48.1 49.7 56.5 + 62.8 - + - -
2010 14.4 19.9 30.8 36.9 41.1 45.3 49.7 58.9 59.4 62.0 + + - -
2011 13.6 23.2 28.5 39.4 42.9 46.1 48.3 62.5 53.8 - - + + -
2012 14.7 19.3 31.6 35.1 43.6 47.1 50.1 51.2 53.4 65.3 + 71.7 - -
2013 14.5 22.9 30.0 40.9 42.8 48.7 52.2 52.9 55.7 67.3 - - - -
2014 15.4 18.5 31.9 38.4 46.4 52.4 53.6 55.3 55.2 61.0 58.9 - - +
2015 14.5 20.4 26.2 39.8 45.7 52.5 53.6 57.5 57.0 59.9 59.9 67.3 + -
2016 14.9 18.4 30.9 36.8 47.8 53.1 56.0 58.6 61.1 60.4 60.1 63.6 - +
2017 15.8 20.5 30.5 40.0 49.6 52.9 56.1 60.6 61.2 63.2 62.5 64.7 67.3 -
2018 14.5 21.7 30.4 39.6 47.8 54.4 58.0 61.3 64.2 65.6 64.6 63.9 66.5 68.9
2019 14.8 21.5 29.7 37.1 46.1 52.5 53.6 60.5 64.3 65.7 67.5 67.3 69.5 69.3
2020 15.4 21.9 30.0 36.3 42.7 52.1 57.4 62.2 63.7 68.1 69.7 67.4 69.0 70.3
2021 14.4 19.5 29.1 36.2 42.7 49.2 55.0 60.5 66.7 69.4 73.0 71.6 71.7 +
2022 14.1 20.2 31.2 37.4 42.6 47.1 51.6 61.4 65.0 68.5 69.0 - - +
2023 15.0 22.4 27.9 40.5 44.5 48.1 51.0 55.1 65.0 64.0 + + - -
2024 13.9 22.1 31.3 37.7 47.1 50.2 52.3 53.9 59.0 - 73.2 - - -
2025 14.7 19.5 28.7 38.1 44.9 51.5 54.3 56.9 59.1 65.9 + - - -
2026 15.0 20.9 28.4 35.5 43.4 48.2 56.1 55.1 58.3 67.3 + + - -

Table A6.10. HADDOCK. Mean length (cm) at age from bottom trawl surveys in the Barents Sea winter 1994-2026. Bootstrap mean estimates. “+” indicates few samples (< 3), while “–“ indicates no samples. Lengths are not adjusted for incomplete coverage.

Age/ Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1994 25 85 244 539 1060 1599 2146 2719 3349 2722 2662 + - -
1995 30 69 219 382 775 1357 1954 + + + - 2537 + -
1996 32 92 218 473 669 1022 1627 1948 - + - + 3626 -
1997 35 82 193 381 616 1051 1300 1680 2476 - - - + +
1998 27 113 247 543 863 1166 1417 1583 2046 + + - - -
1999 28 77 334 580 1020 1445 1775 1730 2020 + - + - -
2000 33 109 275 736 1050 1367 1586 2093 2219 2575 + + + -
2001 28 106 337 582 1146 1422 2140 2029 2939 3139 3105 + + -
2002 30 85 244 621 923 1388 1927 2242 + + 2692 3280 + -
2003 36 128 192 492 959 1204 1534 1982 2580 2675 3179 + + -
2004 23 98 271 458 752 1162 1222 1978 2611 3875 4186 + + 4036
2005 29 97 263 471 669 1087 1376 1881 2120 + - - - -
2006 26 109 301 559 812 1086 1362 1925 2075 + - + - -
2007 32 109 253 519 1016 1193 1718 2043 2258 3443 + - - -
2008 32 114 247 551 835 1115 1573 1599 2167 + + + - -
2009 26 94 227 444 746 1147 1315 1732 + 2567 - + - -
2010 28 87 275 473 677 957 1261 1889 2204 2492 + + - -
2011 21 117 220 520 729 943 1171 2264 1641 - - + + -
2012 29 75 306 432 819 1015 1280 1313 1700 2693 + 3287 - -
2013 25 114 272 645 782 1138 1351 1502 1850 3117 - - - -
2014 32 68 352 589 1002 1428 1566 1674 1704 2212 2156 - - +
2015 23 88 200 590 885 1418 1501 1915 1848 2085 2298 3148 + -
2016 27 74 285 495 1058 1466 1754 2089 2290 2263 2402 2716 - +
2017 33 95 293 637 1247 1542 1822 2294 2420 2640 2633 2890 3241 -
2018 26 95 275 627 1051 1663 1967 2349 2699 2820 2681 2648 3011 3415
2019 25 90 242 510 968 1411 1618 2083 2722 2916 3072 3220 3475 3229
2020 27 89 244 458 806 1385 1863 2426 2658 2887 3334 3013 3366 3600
2021 27 86 208 447 735 1159 1591 2201 3156 3172 3835 3533 3771 +
2022 24 96 292 478 731 1027 1386 2316 2774 3052 3357 - - +
2023 28 107 225 656 849 1134 1385 1855 2930 2660 + + - -
2024 23 98 299 529 1040 1266 1460 1646 2213 - 3856 - - -
2025 25 78 226 547 894 1376 1640 1874 2162 - + - - -
2026 28 82 210 419 796 1076 1709 1687 1939 3084 + + - -

Table A6.11. HADDOCK. Mean weight (g) at age from bottom trawl surveys in the Barents Sea winter 1994-2026. Bootstrap mean estimates. “+” indicates few samples (< 3), while “–“ indicates no samples. Weights are not adjusted for incomplete coverage.

Age/ Year 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10
1994-95 44 134 137 235 297 355 - - -
1995-96 61 148 253 287 247 270 -5 - -
1996-97 50 101 164 143 382 278 53 528 -
1997-98 78 165 349 481 550 366 283 366 -
1998-99 50 221 333 478 582 609 313 437 -
1999-00 81 198 403 470 347 141 318 489 554
2000-01 74 227 308 409 372 773 444 846 920
2001-02 57 138 285 341 242 505 102 - -
2002-03 98 106 248 338 281 146 54 338 -
2003-04 62 143 267 261 203 18 444 629 1295
2004-05 74 165 200 210 335 214 660 142 -
2005-06 80 204 296 341 417 275 550 194 -
2006-07 84 144 218 457 381 632 681 333 1368
2007-08 82 138 298 316 99 380 -119 124 -
2008-09 62 113 197 196 311 199 160 - 400
2009-10 61 181 246 233 211 115 574 472 -
2010-11 89 133 245 256 266 214 1003 -248 -
2011-12 53 189 212 299 285 337 142 -565 1052
2012-13 85 197 339 349 319 336 221 537 1418
2013-14 43 238 317 357 646 428 323 202 362
2014-15 56 132 238 296 416 73 348 175 381
2015-16 51 197 295 468 580 337 588 375 414
2016-17 68 219 352 753 483 356 540 331 350
2017-18 61 180 334 414 416 426 527 405 400
2018-19 64 148 235 341 361 -45 116 373 217
2019-20 64 155 216 296 417 452 808 575 165
2020-21 58 120 202 278 350 199 337 733 519
2021-22 69 206 270 284 292 227 725 573 -104
2022-23 83 129 364 371 403 358 469 614 -114
2023-24 70 192 304 384 417 326 261 358 -
2024-25 55 128 248 365 336 374 414 516 -
2025-26 57 132 193 249 182 333 47 65 922

Table A6.12. HADDOCK. Yearly weight increment (g) from bottom trawl surveys in the Barents Sea winter 1994-2026.

Age/ Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1994 0.00 0.00 0.00 0.02 0.16 0.41 0.44 1.00 0.88 0.74 0.74 + - -
1995 0.00 0.00 0.01 0.04 0.18 0.38 0.41 + + + - 0.63 + -
1996 0.00 0.00 0.00 0.04 0.08 0.27 0.40 0.78 - + - + 0.00 -
1997 0.00 0.00 0.00 0.00 0.15 0.33 0.64 0.31 0.70 - - - + +
1998 0.02 0.00 0.00 0.04 0.15 0.54 0.50 0.79 0.95 + + - - -
1999 0.00 0.00 0.00 0.06 0.24 0.38 0.77 0.81 0.98 + - + - -
2000 0.00 0.00 0.00 0.24 0.54 0.66 0.82 1.00 0.90 0.86 + + + -
2001 0.00 0.00 0.00 0.22 0.54 0.49 0.89 1.00 1.00 0.70 1.00 + + -
2002 0.00 0.00 0.01 0.12 0.45 0.60 0.95 0.90 + + 0.79 1.00 + -
2003 0.00 0.00 0.00 0.04 0.40 0.59 0.73 0.60 0.64 0.68 1.00 + + -
2004 0.00 0.00 0.02 0.03 0.14 0.61 0.56 0.46 0.87 1.00 1.00 + + 1.00
2005 0.00 0.00 0.01 0.06 0.19 0.43 0.76 0.34 1.00 + - - - -
2006 0.00 0.00 0.00 0.12 0.41 0.59 0.84 0.86 0.50 + - + - -
2007 0.00 0.00 0.01 0.19 0.46 0.67 0.82 0.95 0.84 1.00 + - - -
2008 0.13 0.02 0.02 0.09 0.47 0.66 0.83 0.84 0.99 + + + - -
2009 0.00 0.00 0.00 0.04 0.16 0.29 0.64 0.65 + 0.41 - + - -
2010 0.00 0.00 0.05 0.08 0.20 0.41 0.60 0.75 0.91 0.89 + + - -
2011 - 0.00 0.00 0.07 0.14 0.41 0.38 0.38 0.79 - - + + -
2012 0.00 0.00 0.01 0.06 0.38 0.51 0.61 0.71 0.26 1.00 + 0.68 - -
2013 0.00 0.00 0.01 0.04 0.17 0.49 0.61 0.62 0.63 1.00 - - - -
2014 0.00 0.01 0.02 0.13 0.28 0.73 0.73 0.71 0.76 0.94 0.95 - - +
2015 0.00 0.00 0.03 0.05 0.15 0.44 0.64 0.67 0.39 0.54 1.00 0.68 + -
2016 0.00 0.00 0.00 0.02 0.32 0.70 0.83 0.82 0.89 0.83 0.94 1.00 - +
2017 0.00 0.00 0.01 0.15 0.32 0.63 0.74 0.95 0.93 0.97 0.98 1.00 1.00 -
2018 0.00 0.00 0.01 0.12 0.31 0.55 0.87 0.76 0.93 0.84 0.86 0.93 0.94 1.00
2019 0.00 0.00 0.02 0.08 0.18 0.59 0.66 0.83 0.92 0.97 1.00 1.00 1.00 1.00
2020 0.00 0.00 0.01 0.04 0.18 0.56 0.75 0.82 0.91 0.89 0.98 1.00 0.89 0.93
2021 0.00 0.00 0.00 0.06 0.14 0.47 0.64 0.73 0.81 1.00 1.00 0.79 0.88 +
2022 0.00 0.00 0.08 0.05 0.18 0.50 0.79 0.66 0.51 0.49 0.84 - - +
2023 0.00 0.00 0.02 0.40 0.38 0.71 0.84 0.95 1.00 1.00 + + - -
2024 0.00 0.01 0.04 0.14 0.56 0.66 0.86 0.86 1.00 - 1.00 - - 0.00
2025 0.00 0.00 0.02 0.14 0.38 0.89 0.88 0.90 0.97 1.00 + - - -
2026 0.00 0.00 0.06 0.15 0.41 0.64 0.82 0.80 0.88 1.00 + + - -

Table A6.13. HADDOCK. Proportion mature at age from bottom trawl surveys in the Barents Sea winter 1994-2026. Bootstrap mean estimates. The proportion mature is the number of fish classified as maturity category 2 and 3, divided by the total number of fish assigned categories 1-5. “+” indicates few samples (< 3), while “–“ indicates no samples.

  Length group (cm)
Year 5-10 10-15 15-20 20-25 25-30 30-35 35-40 40-45 45-50 50-55 55-59 >60 Tot Biomass (t)
1994 979 11 351 7 085 5 808 4 876 6 798 6 824 5 710 2 254 995 229   52 909 31 850
1995 380 4 582 13 476 13 147 10 570 16 141 16 821 11 058 3 286 859 432 135 90 887 3 991
1996 40 727 3 325 5 975 8 647 13 643 15 512 7 356 2 674 888 164 167 59 118 34 796
19971   302 1 005 2 532 6 150 16 461 21 321 8 727 2 649 1 144 284 122 60 697 38 808
19981 63 2 701 1 453 6 116 40 247 23 602 12 402 6 483 1 634 459 137   95 297 42 214
1999 178 933 2 104 4 111 5 459 8 302 7 331 5 915 2 796 741 71   37 941 15 906
2000 521 1 076 1 472 4 087 4 765 5 050 3 500 1 861 612 461 85   23 490 9 379
2001 53 395 385 2 475 5 786 5 400 4 441 3 155 1 186 327 92 36 23 731 13 192
2002 124 938 1 859 1 879 4 200 4 743 3 423 3 489 1 630 592 184 28 23 089 13 127
2003   954 1 649 2 140 4 706 4 352 2 788 3 028 1 965 608 140 392 22 722 12 718
2004 755 196 441 1 198 2 978 4 398 6 240 4 528 2 452 553 144 45 23 928 17 379
2005   126 210 356 1 093 2 096 3 874 4 683 2 781 1 287 290 122 16 918 16 504
20062       182 2 551 5 579 6 338 4 193 3 208 955 128 12 23 146 18 928
20071     40 95 370 973 2 880 4 232 3 561 1 521 275 50 13 997 16 013
2008 1 737 2 539 197 177 444 708 1 957 2 498 2 991 1 226 154 19 14 647 12 303
2009 35 70 85   38 484 1 747 3 694 4 142 1 956 268 217 12 736 17 117
2010 377 1 973 1 146 510 138 82 833 1 098 2 078 1 610 206 130 10 181 9 670
2011 332 3 131 2 070 272 390 120 272 2 299 3 014 2 043 129 358 14 430 13 480
20123 813 4 361 4 172 1 954 565 308 902 3 698 4 130 1 788 315 82 23 088 15 782
2013 73 7 582 4 990 3 934 1 576 371 865 824 1 287 1 593 378 455 23 928 11 119
2014 121 1 015 1 434 3 022 3 305 1 009 505 1 435 2 159 1 183 627 190 16 005 12 102
2015 127 875 1 405 2 892 2 572 1 920 426 712 1 213 1 192 814 81 14 229 9 796
2016 669 1 228 1 438 2 274 4 115 3 576 3 350 1 659 2 161 2 313 1 128 256 24 167 19 700
20173 341 1 288 877 1 051 4 522 9 481 6 774 3 030 2 106 1 786 596 491 32 343 25 635
2018 1 133 2 762 1 811 1 674 3 253 4 610 6 206 4 308 2 000 1 610 717 296 30 380 22 649
2019 532 3 187 2 183 1 759 2 768 3 797 10 735 9 740 6 156 1 693 504 414 43 468 37 175
20203 651 675 1 367 1 057 1 915 2 442 6 472 8 773 6 459 2 779 488 147 33 225 33 048
20213 47 306 763 1 075 1 002 1 574 4 215 6 115 5 488 2 822 1 204 248 24 859 30 053
2022 1 794 1 768 537 1 370 1 970 2 638 7 967 10 787 6 951 2 667 720 189 39 358 39 358
2023 474 1 878 557 1 634 1 441 1 488 2 321 3 911 4 854 2 501 114 89 21 262 20 603
2024 381 2 874 5 445 666 1 116 1 579 2 366 2 895 2 606 1 384 493   21 805 15 110
2025   1 622 2 120 2 024 714 1 381 3 240 4 676 6 952 3 932 859 149 27 669 29 027
2026 268 1584 2835 2624 1160 1133 3005 4939 3526 2564 929 118 24685 21962

11.4 - Redfish

Table A7.1. GOLDEN REDFISH (Sebastes norvegicus). Abundance indices (numbers in thousands) from bottom trawl surveys in the Barents Sea standard area winter 1994-2026.

1 Indices raised to also represent the Russian EEZ. 2 Not complete coverage in southeast due to restrictions, strata 7 area set to default and strata 13 as in 2005. 3 Indices not raised to also represent uncovered parts of the Russian EEZ.

  Length group (cm)
Year 5-10 10-15 15-20 20-25 25-30 30-35 35-40 40-45 45-50 >50 Tot Biomass (t)
2014 32 339 355 1 436 2 578 1 315 211 499   399 7 164 2 945
2015   199 195 127 809 804 363   31 124 2 652 1 258
2016     103 304 584 1 146 794 102   29 3 062 1 382
2017   67 98 588 526 674 546 97 32 34 2 662 1 055
2018 58 823 753 661 660 987 1 895 544 51 0 6 432 2 647
2019 26 959 981 334 640 1 531 1 329 516 76 26 6 418 2 772
2020 30 248 1 110 832 1 184 2 252 1 820 906 338 0 8 720 4 400
2021 24 304 1 065 1 169 434 885 826 373 121 0 5 201 1 978
2022 25 168 301 1 136 1 167 342 379 53 46 0 3 617 1 085
2023   189 189 872 1 300 961 162 62   0 3 735 1 110
2024   152 470 584 965 978 142 58 20 39 3 408 1 250
2025   112 315 263 1 315 1 854 595 249 114 0 4 817 2 016
2026 29 259 325 856 1629 955 327 58     4428 2042

Table A7.2. GOLDEN REDFISH (Sebastes norvegicus). Abundance indices (numbers in thousands) for new strata 24-26 from bottom trawl surveys in the Barents Sea winter 2014-2026.

  Length group (cm)
Year 5-10 10-15 15-20 20-25 25-30 30-35 35-40 40-45 45-50 50-55 55-59
1994 48 58 34 31 24 20 19 23 19 25 45
1995 48 41 36 31 19 35 33 33 23 25 38
1996 71 51 49 29 18 29 27 24 18 24 44
19971   39 27 23 15 48 57 22 13 17 31
19981 53 27 25 57 89 72 53 42 24 27 47
1999 65 41 38 38 28 23 31 57 56 27 62
2000 34 30 20 22 21 25 27 27 19 22 64
2001 60 31 26 26 32 30 41 53 29 28 43
2002 51 56 46 23 26 21 24 34 39 24 42
2003   33 30 30 24 25 15 20 28 38 74
2004 72 38 29 28 33 55 48 27 23 28 50
2005   68 45 32 21 27 31 19 20 30 67
20062       53 49 44 33 28 22 21 39
20071   71 58 59 27 22 23 24 22 17 30
2008 33 28 42 64 36 23 21 26 20 24 50
2009 104 104 68   72 31 32 24 24 22 35
2010 58 26 47 49 40 56 31 29 18 20 35
2011 41 39 23 43 29 49 41 66 43 36 51
20123 33 41 21 21 35 40 23 40 43 29 40
2013 56 40 25 16 21 39 37 37 32 22 44
2014 54 30 26 17 20 36 34 37 29 26 24
2015 61 39 30 27 19 17 24 38 26 22 31
2016 50 30 22 19 25 20 17 25 23 21 31
20173 94 40 41 27 30 65 36 31 27 36 30
2018 32 21 17 21 19 17 22 17 22 22 27
2019 39 26 18 20 18 17 22 33 33 19 34
20203 90 26 22 20 21 30 32 46 34 30 45
20213 67 28 19 17 20 29 36 40 42 36 38
2022 87 86 74 71 70 63 68 68 70 69 83
2023 52 30 30 24 21 18 21 42 33 18 49
2024 91 41 73 25 25 18 19 18 15 19 48
2025   24 20 19 22 22 20 26 22 34 31
2026 45 33 24 24 22 25 25 33 21 22 26

Table A7.3. GOLDEN REDFISH (Sebastes norvegicus). Estimates of coefficients of variation (%) for swept area abundance indices. Barents Sea standard area winter 1994-2026.

1 Russian EEZ not covered. 2 Russian EEZ partly covered. 3 Indices not raised to represent uncovered parts of the Russian EEZ.

  Length group (cm)
  Year 5-9 10-14 15-19 20-24 25-29 30-34 35-39 40-44 >45 Total Biomass ('000 t)
  1994 6 192 335 351 55 70 24 3 0 1 036 161
  1995 299 81 521 347 74 51 23 3 0 1 400 87
  1996 212 100 199 341 136 42 17 1 0 1 048 128
  19972 59 128 28 271 252 66 38 4 0 846 166
  19982 1 85 61 102 206 41 13 2 0 511 97
  1999 2 7 68 37 169 74 22 3 0 381 102
  2000 9 13 40 77 141 96 27 7 2 411 110
  2001 9 23 7 56 76 73 9 1 0 255 64
  2002 16 7 19 36 96 116 24 1 0 315 90
  2003 4 4 11 13 76 220 51 7 0 387 152
  2004 2 3 7 19 33 86 31 2 0 183 68
  2005   6 7 11 28 154 87 4 0 298 132
  20062 100 2 10 14 22 103 82 3 1 336 107
  20072 374 132 2 8 13 142 160 8 0 842 172
  2008 863 359 27 5 12 103 164 5 0 1 536 168
  2009 95 322 135 5 9 69 165 6 0 806 157
  2010 654 272 214 64 7 73 190 6 0 1 480 197
  2011 505 239 220 153 14 44 156 5 1 1 336 177
  20122 131 284 86 125 48 15 158 18 0 865 177
  2013 252 227 248 160 145 36 193 27 0 1 288 246
  2014 91 174 247 112 122 50 114 14 0 923 168
  2015 171 109 212 296 279 208 168 18 0 1 461 334
  2016 611 105 149 329 214 165 126 14 1 1 713 268
  20172 567 184 69 207 290 313 231 11 0 1 872 416
  2018 191 253 83 111 194 271 215 22 1 1 342 353
  2019 44 307 279 101 159 237 189 18 0 1 335 319
  20202 195 119 205 92 118 232 210 25 3 1 199 314
  20212 878 125 139 125 81 187 172 22 10 1 739 276
  2022 578 999 53 110 76 87 155 20 0 2 078 226
  2023 44 966 346 103 150 133 194 31 1 1 966 307
  2024 17 183 631 67 201 135 154 28 1 1 418 300
  2025 19 77 530 320 122 140 195 27 1 1 431 331
  2026 151 16 135 566 148 195 215 27 1 1454 379

Table A7.4. BEAKED REDFISH (Sebastes mentella)1. Abundance indices (numbers in millions) from bottom trawl surveys in the Barents Sea standard area winter 1994-2026.

Year 5-9 10-14 15-19 20-24 25-29 30-34 35-39 40-44 >45 Total Biomass ('000 t)
2014 20 9 12 7 5 2 2 0 0 58 5.6
2015 14 5 8 11 11 5 4 0 0 59 9.2
2016 54 3 2 4 5 4 1 0 0 75 4.8
2017 82 13 1 4 6 6 4 1 0 117 7.4
2018 47 75 2 2 5 6 6 1 0 143 10.3
2019 16 12 8 1 1 1 2 0 0 42 3.0
2020 11 3 4 2 2 7 5 1 0 34 7.4
2021 107 1 4 6 3 16 10 0 0 148 14.9
2022 60 47 1 4 2 6 7 0 0 128 9.2
2023 6 137 24 2 3 2 3 1 0 177 8.7
2024 16 16 41 1 1 0 1 0 0 77 5.0
2025 32 1 25 13 1 1 2 0 0 75 5.9
2026 136 2 3 13 1 2 1 0 0 159 3.6

1Includes unidentified  Sebastes  specimens, mostly less than 10cm. 2Indices not raised to represent uncovered parts of the Russian EEZ.


Table A7.5. BEAKED REDFISH (Sebastes mentella)1 . Abundance indices (numbers in millions) for new strata 24-26 from bottom trawl surveys in the Barents Sea winter 2014-2026.

1 Includes unidentified Sebastes specimens, mostly less than 10cm.

Length group (cm)
Year 5-9 10-14 15-19 20-24 25-29 30-34 35-39 40-44
1994 27 15 46 51 38 40 36 57
1995 16 26 22 21 17 18 22 32
1996 17 22 28 19 17 34 23 35
19972 21 18 18 18 15 19 22 40
19982 33 15 20 14 18 18 22 33
1999 20 18 15 13 21 23 27 54
2000 15 13 13 13 16 22 33 70
2001 15 15 16 13 14 19 15 24
2002 55 13 13 18 17 20 17 26
2003 57 15 17 18 18 28 30 44
2004 19 15 15 19 14 13 18 19
2005   25 17 16 17 20 23 37
20062 14 51 26 30 20 19 16 22
20072 14 24 17 14 15 22 19 41
2008 12 14 25 19 16 23 21 25
2009 12 9 17 22 36 30 25 22
2010 14 11 11 15 20 33 32 20
2011 12 10 11 15 19 33 25 21
20122 16 11 13 15 19 28 36 55
2013 18 17 35 21 26 28 28 30
2014 10 10 11 13 17 20 28 25
2015 13 12 12 16 25 23 19 31
2016 9 10 13 20 16 15 18 17
20172 9 13 15 14 14 15 16 19
2018 9 10 12 14 12 12 16 21
2019 10 11 13 13 16 16 19 21
20202 11 13 10 11 15 14 12 18
20212 13 35 12 17 18 23 19 19
2022 15 24 15 13 13 12 14 18
2023 14 19 22 15 16 15 14 16
2024 15 18 26 16 20 15 13 20
2025 24 28 31 25 19 16 13 15
2026 14 13 12 19 18 12 10 19

Table A7.6. BEAKED REDFISH (Sebastes mentella)1. Estimates of coefficients of variation (%) for swept area abundance indices. Barents Sea standard area winter 1994-2026.

1 Includes unidentified Sebastes specimens, mostly less than 10cm. 2 REZ not covered. 3 REZ partly covered.

Length group (cm)
Year 5-9 10-14 15-19 20-24 25-29 >30 Total
1994 63 458 59 975 12 538 13 718 610 0 150 299
1995 9 024 63 856 21 839 8 601 2 718 389 106 427
1996 441 45 326 44 933 37 182 5 763 93 133 738
19971 636 20 930 39 393 32 760 5 432 138 99 289
19981 612 8 352 39 332 20 191 2 865 88 71 440
1999 1 550 10 173 11 815 2 997 707 37 27 279
2000 931 4 821 36 694 21 640 2 064 135 66 285
2001 248 2 205 30 436 34 252 3 751 123 71 015
2002 317 3 251 17 596 15 136 1 263 91 37 654
2003 234 4 300 21 436 29 373 4 148 212 59 703
2004 141 1 879 25 588 34 543 3 357 330 65 838
2005 165 1 566 16 658 38 477 6 324 372 63 562
20061 804 4 554 3 651 10 261 2 283 220 21 773
20071 681 5 040 13 794 28 954 2 358 119 50 946
2008 0 1 747 5 840 20 805 4 436 35 32 863
2009 491 519 3 042 10 769 3 382 430 18 633
2010 1 730 457 9 907 51 551 7 370 24 71 039
2011 573 1 601 2 170 7 761 2 257 116 14 478
20121 612 4 059 4 024 28 235 6 005 74 43 009
2013 1 163 9 354 3 300 24 153 8 887 103 46 960
2014 11 671 18 293 21 755 64 830 14 815 1 901 133 265
2015 7 380 27 879 31 481 66 526 9 534 114 142 914
2016 2 733 26 175 18 250 29 103 11 301 915 88 477
20171 3 962 59 558 21 741 22 492 5 713 422 113 888
2018 805 25 003 61 578 37 377 26 371 1 333 152 467
2019 196 13 463 55 385 34 144 7 242 1 484 111 914
20201 601 3 422 57 394 46 436 15 126 911 123 890
20211 1 267 9 082 82 395 74 755 19 412 698 187 609
2022 2 076 2 984 39 046 55 848 3 764 773 104 491
2023 12 217 15 817 23 271 45 309 27 535 741 124 890
2024 855 25 823 45 002 76 747 7 867 639 156 933
2025 563 10 549 24 338 94 979 6 489 1 271 138 189
2026 273 8 448 39 903 95 926 17 425 805 139 189

Table A7.7. NORWAY REDFISH (Sebastes viviparus). Abundance indices (numbers in thousands) from bottom trawl surveys in the Barents Sea standard area winter 1994-2026.

1 Indices not raised to represent the REZ or uncovered parts, Sebastes viviparus is mainly found in NEZ.

Length group (cm)
Year 5-9 10-14 15-19 20-24 25-29 >30 Total
2014 0 97 50 0 0 0 147
2015 0 0 33 0 0 0 33
2016 0 0 111 0 0 0 111
2017 0 0 0 0 0 0 0
2018 0 0 0 0 0 0 0
2019 0 0 105 0 0 0 105
2020 0 0 63 60 0 0 123
2021 51 0 0 73 0 0 124
2022 0 75 33 30 0 0 138
2023 0 36 28 0 28 0 92
2024 37 144 19 19 0 0 219
2025 0 22 43 0 0 0 65
2026 0 0 0 23 0 0 23

Table A7.8. NORWAY REDFISH (Sebastes viviparus). Abundance indices (numbers in thousands) for new strata 24-26 from bottom trawl surveys in the Barents Sea winter 2014-2026.

Length group (cm)
Year 5-9 10-14 15-19 20-24 25-29 30-34
1994 72 59 53 69 72  
1995 49 37 49 39 70 93
1996 66 24 31 38 46 60
19971 84 34 45 52 42 63
19981 40 27 49 75 80 75
1999 79 57 30 24 36 67
2000 53 33 47 44 39 50
2001 41 26 35 33 38 84
2002 64 36 20 24 41 79
2003 74 37 38 33 33 74
2004 49 35 38 35 26 64
2005 71 32 38 33 36 69
20062 71 72 22 26 24 54
20071 70 74 36 35 29 67
2008   59 33 32 43 65
2009 65 51 29 27 31 62
2010 46 37 48 53 57 98
2011 52 46 46 40 43 72
20121 47 27 42 43 42 95
2013 61 32 26 41 48 95
2014 41 34 39 39 44 82
2015 36 26 27 41 39 78
2016 39 31 30 27 23 51
20171 49 63 27 32 27 54
2018 48 46 37 45 35 59
2019 60 60 47 33 28 73
20201 64 30 40 41 59 48
20211 51 33 45 43 46 77
2022 64 35 42 39 35 50
2023 80 64 45 32 71 34
2024 43 45 55 39 40 51
2025 63 24 40 39 36 54
2026 58 42 46 40 48 49

Table A7.9. NORWAY REDFISH (Sebastes viviparous). Estimates of coefficients of variation (%) for swept area abundance indices. Barents Sea standard area winter 1994-2026.

1 REZ not covered. 2 REZ partly covered

    Length group (cm) Biomass (tons)
  Year ≤ 14 15-19 20-24 25-29 30-34 35-39 40-44 45-49 50-54 55-59 60-64 65-69 70-74 75-79 ≥ 80 Total
  1994 0 0 21 79 161 1199 4409 6745 5323 2702 1314 754 19 0 0 22724 27095
  1995 320 0 0 0 130 157 3169 7962 6169 2181 1667 893 484 76 0 23207 29540
  1996 9040 0 0 0 69 139 3869 10497 5956 3114 1678 782 426 81 0 35652 34772
  19971 146 215 0 0 177 404 1365 6168 6777 3669 1289 728 810 81 24 21852 31168
  19981 242 348 2064 882 791 805 1598 5133 8236 4513 2525 851 382 97 21 28490 37228
  19992 187 116 526 580 713 265 1180 1904 3740 2231 1624 1261 108 78 0 14513 21096
  2000 158 203 380 931 1921 4355 2518 1696 2322 1896 1293 672 275 79 0 18697 18877
  2001 75 56 159 241 1028 1643 4109 3604 2498 2245 1171 553 168 52 0 17601 19996
  2002 300 0 64 31 416 1378 2022 4460 3915 2733 1196 1231 254 162 112 18275 24737
  20032 136 0 121 22 552 1018 2406 3937 5876 2739 878 690 282 142 0 18798 24464
  20042 103 103 15 0 552 1896 1626 1967 2385 1292 987 296 144 94 27 11485 13385
  2005 260 72 159 1157 2317 2845 4849 4013 4309 2178 1066 649 362 136 0 24372 24606
  20062 0 84 99 413 2101 5531 4893 6091 4749 2265 928 464 285 40 0 27942 27374
  20071 0 19 144 1765 1368 3270 5171 5310 4370 2084 699 744 421 78 19 25462 26624
  2008 0 0 0 261 1778 6253 4920 6505 5963 3921 839 640 175 81 49 31385 32564
  2009 53 0 0 23 1102 4749 8702 5078 4386 2798 1040 623 431 297 119 29400 31526
  20102 0 0 0 103 835 3799 6410 7970 6161 3041 1245 542 225 272 20 30622 33755
  2011 50 0 0 0 214 4385 6261 6243 5850 4352 703 1013 338 254 100 29763 35222
  20122 130 0 0 0 53 1189 5571 6195 6456 4012 1784 243 77 0 0 25709 30718
  2013 0 0 0 0 0 516 6088 6421 6331 4288 2047 1027 347 308 0 27374 36590
  2014 0 0 46 89 155 417 2323 5663 6088 3683 2290 1451 154 251 77 22690 31678
  2015 347 0 59 0 277 1620 3180 6550 7508 6920 3423 1982 590 336 0 32791 47913
  2016 201 0 120 515 987 2182 3663 4982 5929 6232 1991 2486 644 100 52 30085 39334
  20172 54 0 0 80 591 1245 2061 3879 4700 4776 1857 1987 308 193 23 21756 32201
  2018 0 0 64 0 481 1460 2145 3698 4644 3616 2179 1598 793 264 20 20961 31570
  2019 0 0 0 369 282 1674 3264 4141 5128 4233 3580 2518 1317 531 97 27131 45581
  20202 77 85 259 465 783 2275 4345 5128 4901 4631 3276 1809 878 376 176 29461 43305
  2021 0 157 935 922 2375 2971 3857 4262 3548 3011 2398 1655 662 685 155 27594 37352
  2022 0 0 827 2200 3725 1845 3371 5360 5657 3639 2227 1546 807 415 139 31758 39681
  2023 0 0 59 711 6385 8743 4865 5800 7834 4215 2256 1560 1048 126 276 43879 48147
  2024 474 0 1299 795 2735 6156 9562 5883 5936 5103 3649 1488 974 516 0 44571 52345
  2025 0 190 243 1608 3536 2888 5940 7637 7597 5501 2850 2121 790 209 250 41358 52170
  2026 222 217 1621 5321 5636 7322 5139 8670 5820 3719 2365 1500 886 177 73 48686 46856

11.5 - Greenland halibut

Table A8.1. GREENLAND HALIBUT. Abundance indices (numbers in thousands) from bottom trawl surveys in the Barents Sea standard area winter 1994-2026.

  Length group (cm) Biomass (tons)
Year ≤ 14 15-19 20-24 25-29 30-34 35-39 40-44 45-49 50-54 55-59 60-64 65-69 70-74 75-79 ≥ 80 Total
2014 0 142 146 0 152 460 1382 1479 1383 310 822 42 118 0 0 6434 7462
2015 0 0 0 400 28 323 638 1043 668 675 654 64 103 37 0 4632 5913
2016 747 1055 706 497 365 452 340 733 343 250 68 33 144 0 33 5768 3119
2017 33 0 0 468 1389 1460 1247 1016 585 31 347 32 0 36 0 6646 5151
2018 136 28 0 926 1590 3343 1304 1123 1193 818 478 863 0 0 0 11803 11126
2019 295 325 285 284 375 1870 1813 2938 2140 1155 1365 567 25 37 0 13472 16607
20201 33 325 285 284 284 1015 722 2119 1564 599 934 347 0 0 0 8510 10726
2021 1843 4062 3900 2175 1212 875 1518 1634 1148 891 495 193 23 0 0 19969 10348
2022 260 0 1175 691 3072 3200 5412 5945 2041 890 329 275 78 0 0 23368 18423
2023 874 0 0 262 1503 1099 763 139 331 297 69 35 35 0 0 5408 3034
2024 4100 2562 6559 801 887 3378 3131 3081 516 117 354 0 25 0 0 25512 9630
2025 2094 3847 2743 4760 3003 2921 4212 2729 625 559 119 189 241 21 0 28064 13443
2026 2138 1068 1584 824 1008 878 746 584 198 60 21 39 0 21 0 9169 2894

1Indices raised to also represent REZ. 2Indices raised to also represent uncovered parts of the REZ Note that in 2024, the entire time-series were recalculated in the new Stox, using complete strata areas. The abundance and biomass levels will differ from previous reports, but the trends remain the same.


Table A8.2. GREENLAND HALIBUT. Abundance indices (numbers in thousands) for new strata 24-26 from bottom trawl surveys in the Barents Sea winter 2014-2026.

1Indices raised to also represent uncovered parts of the REZ. Note that in 2024, the entire time-series were recalculated in the new version of Stox, using complete strata areas. The abundance and biomass levels will differ from previous reports, but the trends remain the same.

  Length group (cm)
Year 0-5 5-10 10-15 15-20 20-24 25-29 30-34 35-39 40-44 45-49 50-54 55-59 60-64 65-69 70-74 75-79 80-84
1994 - - - - 94 54 40 25 21 20 17 18 22 24 104 - -
1995 - 77 99 - - - 69 43 19 23 23 23 30 39 64 100 -
1996 - 9 19 - - - 70 43 7 9 17 12 23 26 37 55 -
19971 - - - 64 - - 83 50 26 22 20 20 33 41 39 69 98
19981 - - 76 59 33 47 47 26 30 25 29 33 37 31 42 50 94
19992 - - 98 58 48 29 29 29 25 23 18 14 12 19 49 53 -
2000 - 92 73 70 72 84 55 58 38 16 23 22 21 31 43 57 -
2001 - - 72 91 79 46 42 48 42 45 35 18 21 34 34 57 -
2002 - 99 68 - 70 101 32 30 17 16 20 20 15 26 30 35 57
20032 - - 70 - 63 92 35 26 21 48 41 36 47 32 40 42 -
20042 94 98 63 49 101 - 28 20 18 16 17 16 22 30 35 46 94
2005 - - 65 65 41 45 33 15 18 17 17 18 25 28 31 69 -
20062 - - - 75 73 63 30 16 19 13 15 16 20 25 29 70 -
20071 - - - 94 27 21 30 41 38 31 26 16 29 42 44 44 94
2008 - - - - - 39 23 18 12 12 14 14 19 21 43 49 72
2009 - 97 99 - - 97 24 15 13 14 16 16 21 23 27 49 49
20102 - - - - 89 63 66 20 24 23 23 21 20 25 45 60 100
2011 - - 71 - - - 48 16 15 14 17 16 26 29 33 41 70
20122 - 97 - - - - 43 27 16 20 22 29 39 63 76 - -
2013 - - - - - - - 41 36 19 19 25 21 34 53 51 -
2014 - - - 93 77 69 60 33 24 16 19 18 25 24 49 56 74
2015 - 104 87   97 61 48 22 18 15 14 18 29 38 30 41 -
2016 56 55 69 66 53 45 33 26 18 26 23 30 20 22 25 68 72
20172 - 98 97   - 71 41 27 21 20 14 16 23 24 44 55 100
2018 - 66 - 97 93 73 36 25 16 15 15 15 19 31 33 63 101
2019 - 54 41 97 94 51 45 26 18 20 16 15 16 17 24 26 69
20202 99 - 99 80 93 57 38 18 15 14 15 15 14 17 30 37 54
2021 99 - 56 63 34 39 34 22 14 17 22 16 18 18 27 29 52
2022 - 36 56   42 46 41 27 30 20 14 15 16 16 23 40 56
2023 - 70 37   99 49 34 25 27 26 19 17 18 21 30 67 41
2024 91 36 34 52 53 39 16 16 15 22 14 17 17 21 21 36 -
2025 - 40 35 40 36 37 20 21 19 16 13 18 16 20 30 38 41
2026 - 62 61 46 24 21 17 11 12 12 12 13 16 19 22 44 79

Table A8.3. GREENLAND HALIBUT. Estimates of coefficients of variation (%) for swept area abundance indices. Barents Sea standard area winter, 1994-2026.

1 Russian EEZ not covered. 2 Russian EEZ partly covered.

  Length group (cm)   Biomass
Year 5-9 10-14 15-19 20-24 25-29 30-34 35-39 ≥40 Total (‘000 t)
1994 0 0 1.2 13.6 25.7 10.9 1.1 0.1 52.6 NA
1995 0 0.5 0.8 2.4 10.3 10.8 3.9 0.2 29.0 NA
1996 0 80.0 1371.8 8.4 18.6 7.1 3.8 0.1 1489.9 38.2
1997 0 608.7 681.5 273.8 3.1 5.3 1.8 0.1 1574.3 NA
1998 0 1.2 34.5 42.2 3.6 1.5 1.4 0.1 84.5 NA
1999 0 0.02 11.0 40.0 16.1 5.0 1.7 0.1 74.0 NA
2000 0 12.3 557.5 44.1 25.7 4.4 0.7 0.1 644.9 NA
2001 0.04 311.6 1420.8 631.5 46.0 5.4 1.6 0.1 2417.0 NA
2002 0 0.9 428.9 636.3 77.6 17.5 3.2 0.1 1164.4 56.6
2003 0 3.9 220.5 493.4 73.4 28.0 4.0 0.3 823.4 48.1
2004 0 7.1 712.0 821.6 276.2 37.8 1.1 0.2 1856.0 95.8
2005 0 125.1 717.2 984.7 223.3 31.8 0.1 0.1 2082.4 105.0
2006 0 0 164.4 1500.5 598.0 69.0 2.0 0.1 2333.9 172.9
2007 0 0 4.0 628.0 299.3 23.5 1.6 0.4 956.8 79.8
2008 0 0 0.3 12.1 126.1 19.8 1.3 0.1 159.7 20.6
2009 0 0 0.02 2.7 50.6 21.2 1.5 0.02 76.1 11.4
2010 0 0 0.5 1.6 9.4 16.9 1.0 0 29.4 5.2
2011 0 0 0.1 0.3 2.8 5.1 2.5 0 10.6 2.2
2012 0 85.6 674.6 1.1 1.8 5.3 2.0 0.3 770.7 18.2
2013 0 0 75.3 395.9 12.6 11.5 6.8 0.1 502.2 28.6
2014 0 0 182.1 34.2 9.7 1.6 1.5 0.04 229.2 8.5
2015 0 115.6 907.4 141.2 40.8 8.8 7.4 0 1221.3 34.2
2016 0 0.1 260.0 367.6 38.0 6.3 3.0 0.1 674.9 39.1
2017 0 0 29.1 939.6 279.2 26.1 11.5 0.05 1285.6 99.7
2018 0 0.02 0.8 45.4 50.2 8.3 1.7 0 106.5 10.5
2019 0.1 1.7 54.4 4.5 35.9 13.0 1.0 0.09 110.7 9.2
2020 0.2 14.3 154.9 25.4 7.9 8.1 0.6 0 212.8 11.5
2021 0 1.5 857.8 88.9 11.1 2.1 0.2 0 961.9 37.5
2022 0 13.3 311.0 260.6 11.6 3.5 1.3 0 601.4 25.9
2023 0 0 41.0 226.7 66.0 8.1 1.1 0.1 343.0 23.3
2024 0 0 38.0 92.9 18.5 4.9 0.5 0 154.7 10.0
2025 0 0.8 500.9 48.1 98.8 22.9 1.9 0.1 673.4 34.0
2026 0 1.0 299.7 176.2 159.6 67.0 5.2 0.0 708.6 52.5

11.6 - Blue whiting

Table A9.1. BLUE WHITING. Abundance indices (numbers in millions) from bottom trawl surveys in the Barents Sea standard area winter 1994-2026.

  Length group (cm) Total Biomass
Year 5-9 10-14 15-19 20-24 25-29 30-34 35-39 ≥40 (‘000 t)
2014 0 0 0.29 0.28 0.10 0.19 0.13 0 1.0 0.12
2015 0 0 0.16 0.10 0.25 0.78 0.42 0 1.7 0.27
2016 0 0 2.12 5.35 1.54 0.46 0.35 0 9.8 0.84
2017 0 0 0.08 20.91 4.10 1.34 0.39 0 26.8 1.98
2018 0 0 0 0.16 0.37 0.23 0.16 0 0.9 0.13
2019 0 0 0.03 0.21 0.71 0.70 0.24 0 1.9 0.34
2020 0 0 0.11 0.27 0 0.13 0 0 0.5 0.05
2021 0 0 9.60 3.53 0.48 0.41 0.07 0 14.1 0.63
2022 0 0 1.77 4.15 0.17 0.10 0 0 6.2 0.32
2023 0 0 0.08 0.98 1.1 1.41 0.33 0 3.9 0.56
2024 0 0 0 0.08 0.06 0.24 0.02 0 0.39 0.06
2025 0 0 1.22 0.51 0.63 1.09 0.06 0 3.5 0.36
2026 0 0 1.03 3.13 6.78 4.48 0.46 0 15.9 2.15

Table A9.2. BLUE WHITING. Abundance indices (numbers in millions) for new strata 24-26 from bottom trawl surveys in the Barents Sea winter 2014-2026.

  Length group (cm)
Year 5-9 10-14 15-19 20-24 25-29 30-34 35-39 40-44
1994 - - 94 68 51 28 31 49
1995 - 59 55 51 66 32 28 48
1996 - 49 79 56 49 30 33 59
1997 - 30 29 33 36 29 37 70
1998 - 91 60 33 35 33 28 70
1999 - 98 26 27 28 31 43 71
2000 - 37 21 20 25 29 31 95
2001 69 21 18 25 26 35 39 90
2002 - 56 25 17 20 33 52 69
2003 - 87 47 23 17 27 58 83
2004 - 86 23 19 15 14 30 61
2005 - 28 25 16 24 24 71 90
2006 - - 17 12 13 26 46 61
2007 - - 50 16 12 17 42 84
2008 - - 51 59 27 22 47 82
2009 - - 97 60 21 20 61 95
2010 - - 91 80 29 25 33 -
2011 - - 100 88 45 48 62 -
2012 - 32 30 39 45 38 29 98
2013 - - 70 31 57 44 44 99
2014 - - 23 23 24 27 18 137
2015 - 50 21 21 31 31 37 -
2016 - 96 33 24 17 27 29 97
2017 - - 24 16 16 16 42 101
2018 - 102 49 25 17 19 32 -
2019 68 37 38 29 35 31 50 101
2020 94 90 39 27 28 29 46 -
2021 - 48 23 30 32 24 45 -
2022 - 73 25 18 29 34 72 -
2023 - - 32 24 21 33 47 100
2024 - 100 69 72 30 36 71 97
2025 - 98 37 43 18 27 71 98
2026 - 83 31 33 19 19 30 -

Table A9.3. BLUE WHITING. Estimates of coefficients of variation (%) for swept area abundance indices. Barents Sea standard area winter 1994-2026.

12 - Appendix 2. Survey design and methods for target species index calculation

Photo of research vessel at sea.

12.1 - Introduction

The Institute of Marine Research (IMR), Bergen, has performed acoustic measurements of demersal fish in the Barents Sea since 1976. Since 1981 a bottom trawl survey has been combined with the acoustic survey. Typical effort of the combined survey has been 10-14 vessel-weeks, and about 350 bottom trawl hauls have been made each year. After 2018, the Russian zone has been relatively well-covered and around 500 bottom trawl hauls have been made each year. Most years three vessels have participated from about February 1 to March 15.

The purpose of the investigations is presently:

  • Obtain acoustic abundance indices by length and age for cod and haddock

  • Obtain swept area abundance indices by length and age for cod and haddock

  • Obtain swept area abundance indices by length for redfish, Greenland halibut and blue whiting

  • Map the geographical distribution of those fish stocks

  • Estimate length, weight and maturity at age for cod and haddock

  • Collect stomach samples from cod, for estimating predation by cod

  • Map the distribution of capelin (pre-spawning) and polar cod

Data and results from the survey are used both for stock assessments in the ICES Arctic Fisheries Working Group (AFWG) and by several research projects at IMR and PINRO, the Polar branch of the Russian Federal Research Institute of Fisheries and Oceanography (VNIRO).

From 1981 to 1992 the survey area was fixed (strata 1-12, main areas ABCD in Fig. 2.1). Due to warmer climate and increasing stock size in the early 1990s, the cod distribution area increased. Consequently, in 1993 and further in 1994 the survey area was extended to the north and east (strata 13-23, main areas D’ES in Fig. 2.1) to obtain a more complete coverage of the younger age groups of cod, and since then the survey has aimed at covering the whole cod distribution area in open water. For the same reason, the survey area was extended further northwards in the western part in 2014 (strata 24-26 in Fig. 2.1). In many years since 1997 Norwegian research vessels have had limited access to the Russian EEZ, and in 1997, 1998, 2007 and 2016 the vessels were not allowed to work in the Russian EEZ. In 1999 a rather unusually wide ice-extension partly limited the coverage. Since 2000, except in 2006, 2007 and 2017, Russian research vessels have participated in the survey and the coverage has been better, but for various reasons incomplete in most years. Table 1.4 in the main report summarizes degree of coverage and main reasons for incomplete coverage in the survey.

According to the joint IMR-VNIRO long-term monitoring plan for the Barents Sea, developed during a series of meeting between the institutes, and agreed to be implemented at the annual meeting between Russian and Norwegian scientists in Tromsø, 13-15 March 2018, the winter survey is from 2019 a joint IMR-VNIRO survey with commitments from both institutes to obtain a total coverage of the main demersal fish resources in the area.

12.2 - Methods

12.2.1 - Swept area measurements

All vessels were equipped with the standard research bottom trawl Campelen 1800 shrimp trawl with 80 mm (stretched) mesh size in the front. Prior to 1994 a cod-end with 35-40 mm (stretched) mesh size and a cover net with 70 mm mesh size were mostly used. Since this mesh size may lead to considerable escapement of 1-year-old cod, the cod-ends were in 1994 replaced by cod-ends with 22 mm mesh size. At present a cover net with 116 mm meshes is mostly used.

The trawl is now equipped with a rockhopper ground gear (Engås and Godø 1989). Until and including 1988 a bobbins gear was used, and the cod and haddock indices from the period 1981-1988 have since been recalculated to ‘rockhopper indices’ and adjusted for length dependent catch efficiency and/or sweep width (Godø and Sunnanå 1992, Aglen and Nakken 1997). The sweep wire length is 40 m, plus 12 m wire for connection to the doors.

In the Norwegian Barents Sea shrimp survey (Aschan and Sunnanå 1997) the Campelen trawl has been rigged with some extra floats (45 along the ground rope and 18 along the under belly and trunk, all with 20mm diameter) to reduce problems on very soft bottom. This rigging has been referred to as “Tromsø rigging”. When the shrimp survey was terminated 2004 and later merged with the Barents Sea Ecosystem survey in 2005, improved shrimp data were also requested from the winter survey, and the “Tromsø rigging” was used in parts of the shrimp areas in 2004 (11 stations) and 2005 (9 stations). In 2006-2014 “Tromsø rigging” was used for nearly all bottom trawl stations taken by Norwegian vessels in the winter survey, while since 2015 this rigging has not been applied.

Vaco doors (6 m2, 1500kg), were previously standard trawl doors on board the Norwegian research vessels. On the Russian vessels and hired vessels V-type doors (ca 7 m2) have been used. In 2019 the Russian vessel used 5 m2 “Sparrow” trawl doors weighing 2000 kg. In 2004, R/V “Johan Hjort” and R/V “G.O. Sars” started using a V-type door for bottom trawling (Steinshamn W-9, 7.1m2 , 2050 kg), the same type as used on the Russian research vessels. In 2010 the V-doors were replaced by 125” Thyborøn trawl doors. R/V “Helmer Hanssen” has used Thyborøn trawl doors since the 2008 survey. To achieve constant sampling width of a trawl haul independent of e.g. depth and wire length, a 10-15 m rope “locks” the distance between the trawl wires 80-150 m in front of the trawl doors on the Norwegian vessels. This is called “strapping”. The distance between the trawl doors is then in most hauls restricted to the range 48-52 m regardless of depth (Engås and Ona 1993, Engås 1995). Strapping was first attempted in the 1993 survey on board one vessel, in 1994 it was used on every third haul and in 1995-1997 on every second haul on all vessels. Since 1998 it has been used on all hauls when weather conditions permitted. Strapping is not applied on the Russians vessels, but the normal distance between the doors is about 50 m (D. Prozorkevich, pers. comm.).

Standard tow duration is now 15 minutes (until 1985 the tow duration was 60 min. and from 1986 to 2010 30 min.). Trawl performance is constantly monitored by Scanmar trawl sensors, i.e., distance between the doors, vertical opening of the trawl and bottom contact control. In 2005-2008 sensors monitoring the roll and pitch angle of the doors were used due to problems with the Steinshamn W-9 doors. The data is logged on files but have so far not been used for further evaluation of the quality of the trawl hauls.

At the start of the survey at least two of the trawls on the Norwegian vessels undergo a “sea test”. The purpose of the test is to check that the geometry of the trawl is within the specified limits and that the trawl performance is satisfactory, especially that the bottom contact is stable. It is further checked that the trawl sensors operate as they should.

The positions of the trawl stations are pre-defined. When the swept area investigations started in 1981 the survey area was divided into four main areas (A, B, C and D, Fig 2.1) and 35 strata.

Map showing survey strata (1-26), in turn grouped in to main areas (A-D, D', E, S, N).
Figure 2.1. Strata (1-23) and main areas (A,B,C,D,D’,E and S) used for swept area estimations and acoustic estimations with StoX. Additional strata (24-26, main area N) are covered since 2014, and are from 2020 included in the standard time series for haddock and from 2021 in the time series for cod.

During the first years, the number of trawl stations in each stratum was set based on expected fish distribution to reduce the variance, i.e., more hauls in strata where high and variable fish densities were expected to occur. During the 1990s trawl stations were spread out more evenly, yet the distance between stations in the most important cod strata is shorter (16 or 20 NM) compared to the less important strata (24, 30 or 32 NM). Considerable amounts of young cod were now distributed outside the initial four main areas, and in 1993 the investigated area was therefore enlarged by areas D’, E, and the ice-free part of Svalbard (S) (Fig. 2.1 and Table 1.4 in main report), 28 strata altogether. In the 1993-1995 survey reports, the Svalbard area was included in area A’ and the western part of area E (west of 30 ° E). Since 1996 a revised strata system with 23 strata has been used (Figure 2.1). The main reason for reducing the number of strata was the need for enough trawl stations in each stratum to get reliable estimates of density and variance. In 2014 the investigated area was enlarged by three new strata in northwest, 24-26 (main area N, Fig. 2.1). From 2020, these strata were included in the swept area and acoustic indices for haddock and from 2021, they were included for cod (see next section). They are not yet included in the standard time series for the other species but presented separately.

12.2.2 - Sampling of catch and age-length keys

Sorting, (sub)sampling, weighing, and measuring of the catch are done according to instructions given in Mjanger et al . (2021). Since 1999 all data except age are recorded electronically by Scantrol Fishmeter measuring board, connected to stabilized scales. The whole catch or a representative sub sample of most species is length measured at each station.

At each trawl station, one cod and haddock per 5 cm length-group is sampled for age (otoliths), individual weights, sex, and maturity. For cod, stomach samples are also taken from the same individuals. For the largest cod, other sampling schemes have been used in some years; in 2007-2009, all cod above 80 cm were sampled, and in 2010 all above 90 cm were sampled, limited to 10 per station. The stomach samples from cod are frozen and analysed after the survey. Greenland halibut otoliths are also sampled from one specimen per 5 cm length-group, while otoliths from the redfish species Sebastes norvegicus and S. mentella are sampled from two fish in every 5-cm length-group at every station. Table A2.1 in the annual report gives an account of the sampled material, and further details on the sampling protocol can be found in the sampling manual for the Winter survey (updated annually).

12.2.3 - Swept area fish density estimation

Swept area fish density estimates ( r k,l,s ) for each station s in stratum k are first estimated by length ( l ) for each bottom trawl haul by the equation:

Formel

Formel number of fish of length l per n.m.2 observed on trawl station s in stratum k

Formel estimated frequency of length l

Formel swept area:

Formel

Formel towed distance (nm)

Formel length dependent effective fishing width. The fishing width was previously fixed to 25 m = 0.0135 nm. Based on Dickson (1993a,b, Table 1), length dependent effective fishing width was included in the calculations for cod and haddock from 1995 (Korsbrekke et al ., 1995) as such:

Formel for Formel

Formel = Formel for Formel

Formel = Formel for Formel

Species l min l max
Cod 5.91 0.43 15 cm 62 cm
Haddock 2.08 0.75 15 cm 48 cm

Table 6 : Species-specific parameters from Dickson (1993a, b) used to calculate length-dependent effective fishing width for cod and haddock.

For redfish, Greenland halibut and other species, a fishing width of 25 m is applied, independent of fish length.

After applying the length-dependent effective fishing width, the station-specific length distributions (swept area density by length) are aggregated into 5 cm length groups.

Next, the abundance (N individuals) by 5 cm length group l and stratum k are calculated as:

Formel

Where A is the area (nmi2) of stratum k and ρk,l is the average swept area density by l in the stratum, given by:

Formel

Where n is the number of stations in the stratum.

A two-stage conversion process is used to convert the abundance of fish by length group to abundance of fish by age group. First, the abundance (Nk,l ) by length group and stratum is distributed on the length-measured individuals (j) to generate so-called “Super-individuals” (super-individuals represent fractions of a total; our use corresponds to a probability-based design where Formel is the inverse of the inclusion probability for a single fish sample), each representing an abundance estimated as:

Formel Where,

Formel

and m is the number of length-measured individuals.

Second, in instances where a super-individual is not aged, the missing age is filled in by a random data imputation. The imputation of missing age is first carried out at the station level, randomly selecting the value from aged super-individuals within the same length group. If no aged super-individual is available at the station level, the imputation is attempted at strata level, or lastly at survey level. In instances where no age information is available at any level for a specific length group, the abundance estimate is presented with unknown age (Johnsen et al., 2019).

12.2.4 - Acoustic measurements

The method is explained by Dalen and Smedstad (1979, 1983), Dalen and Nakken (1983), MacLennan and Simmonds (1991) and Jakobsen et al. (1997). The acoustic equipment has been continuously improved. Since the early 1990s Simrad EK500 echo sounder and Bergen Echo Integrator (BEI, Knudsen 1990) were used. The Simrad EK60 echo sounder replaced the EK500 on R/V “Johan Hjort” in 2005 and on R/V “Helmer Hanssen” since 2008. The latest R/V “G.O. Sars” has used EK60 since it replaced R/V “Sarsen” (former R/V “G.O. Sars”) in 2004. The Large Scale Survey System (LSSS, Korneliussen et al . 2016) replaced BEI on R/V “G.O. Sars” and R/V “Johan Hjort” in 2007 and on R/V “Helmer Hanssen” since 2008. On the Russian vessels EK 500 was used from 2000 to 2004 and ER60 since 2005. The new Simrad EK80 echo sounder has been used on R/V “G.O. Sars” since 2017 and on R/V “Johan Hjort” since 2018.

In the mid-1990s the echo sounder transducers were moved from the hull to a retractable centreboard, on R/V “Johan Hjort” since the 1994 survey, on R/V “Sarsen” (former R/V “G.O. Sars”) since 1997, on the latest R/V “G.O. Sars in 2004 and on R/V “Helmer Hanssen” since the 2008 survey. This latter change has largely reduced the signal loss due to air bubbles in the close to surface layer. None of the Russian vessels have retractable centreboards.

On both Norwegian and Russian vessels, acoustic backscattering values (sA = nautical area scattering coefficient NASC) are stored at high resolution in LSSS. After scrutinizing and allocating the values to species or species groups, the values are stored with 10 m vertical resolution and 1 nautical mile (NM) horizontal resolution. The procedure for allocation by species is based on:

  • composition in trawl catches (pelagic and demersal hauls)

  • the appearance of the echo recordings

  • inspection of target strength distributions

  • inspection of target frequency responses

For each trawl catch the relative sA-contribution from each species is calculated (Korsbrekke 1996) and used as a guideline for the allocation. In these calculations, the fish length dependent catching efficiency of cod and haddock in the bottom trawl (Aglen and Nakken 1997) is taken into account. There is no reason to believe that trawl catches give an accurate representation of species composition in the sea, so the calculated sA -contribution from the trawl hauls are used as a guidance only.

12.2.5 - Acoustic fish density estimation

Within each stratum, the acoustic course tracks are divided into transects that are separated by changes in heading. A distance of about 2 nautical miles around each turn is not included in the transects. When the time series 1994-2017 was converted to StoX, the specification of transects was done by first running a R-script tagging all the transects and then the transects were inspected and edited manually in StoX if necessary. Minimum length of a transect was set to 4 nautical miles and the location of trawl stations were used to cut the tracks into transects, i.e., they were limited by trawl location as well as the heading of the ship. In this process miles with obvious errors in the sA -values, e.g., bottom contribution, were removed from the transects. From 2018, all transects have been defined manually using the built-in functionality in the StoX software with the approach of stopping the transect for changes in heading only.

For each transect and stratum, an arithmetic mean sA is calculated for the water column. The conversion of mean NASC (m2 nmi−2 ) to density of fish follows a standard procedure where all trawl stations within a stratum with a catch of more than 5 individuals are assigned to each PSU. If less than 3 trawl stations had been carried out in a stratum, stations in neighbouring strata are manually assigned to the PSUs such that at least 3 stations are assigned to each PSU. From 2021, the criterion of having minimum 5 individuals in the catch was excluded as this type of filtration is not implemented in the new StoX version.

The combined length distribution ( d ) is calculated for each transect (PSU ( j )) as:

Formel

where dl,s,j is density (number by 1 NM tow distance) by 1 cm length group ( l ) for the stations ( s ) assigned to PSU ( j ).

The trawl catches are normalised to 1 NM towing distance and adjusted for length dependent catch efficiency as describe for swept area estimation above.

The areal density of fish (ρ) (n per nmi2 ) by length group l by transect j is calculated as

Formel

where NASCj,l is the mean nautical area scattering coefficient by transect (j) and length group (l) and σl is the acoustic backscattering cross-section for a fish of length l .

NASCj,l is calculated as:

Formel

where σl,p is the acoustic backscattering cross-section for a fish of length l multiplied with the proportion (p) of a fish of length l in the total length distribution and NASCj is the mean nautical area scattering coefficient in transect j .

The acoustic backscattering cross-section (m2 ) for a fish of length l is calculated as

Formel

where the target strength, TS , for a fish of length l (cm) is calculated as

Formel

Where m and a are constants. For cod and haddock, we apply:

Formel  (Foote, 1987) 

The fish abundance ( N ) by length group ( l ) for stratum k is then:

Formel ,

where A is stratum area and the mean density of fish of length group l and stratum k is:

Formel

where Formel (j= 1,2, nk) are the lengths of the nk sample transects.

Estimates by length are converted to estimates by age using the same imputation method described for the swept area index estimation. The abundance by stratum is then summed for defined main areas (Figure 2.1).

12.2.6 - Software for index estimation

The new Sea2Data software StoX has been applied to estimate acoustic indices with CVs for cod and haddock and swept area indices with CVs for cod, haddock, golden redfish, beaked redfish, Norway redfish, Greenland halibut and blue whiting (Mehl et al. 2016, 2018). The main difference between StoX and the SAS-based BEAM software previously used (years 1981-1993 of the time-series, see earlier survey reports for results and method details) is in the use of the age-length data. StoX does not use age-length keys (ALK) in the traditional sense with ALKs estimated for large areas. Missing age information is instead imputed from known age-length data within station, strata, or the entire survey (see below). In addition, in the acoustic abundance estimation, StoX transects are defined within each stratum (Figure 2.1) as primary sampling units (PSUs) and used to calculate acoustic density (Jolly and Hampton 1990), as opposed to the BEAM method that divided the survey area into rectangles, calculating average acoustic densities (sA ) in each. StoX also allows for uncertainty estimation by bootstrapping primary sampling units (PSUs). Another main feature is storing of all user input and software versions in a version controlled file.

The entire haddock time series was revised in 2020 using StoX, in connection with the ICES Benchmark Workshop for Demersal Species (ICES 2020). This involved including strata 24-26 in the official time series from 2014, the use of bootstrap mean instead of baseline estimates for abundance at age and standardising the length groups used in the length-dependent sweep width function (Fall 2020). The additional strata were also included in the acoustic index for haddock, while the other changes were made to the swept area index only. In 2021, the same changes were made to the cod time series (ICES 2021). The revised swept area index for haddock was produced with R version 3.5.3 (years 1994-2013) and R version 3.6.2 (years 2014-2019). From 2022, the haddock acoustic index is also presented as bootstrap mean abundances.

In the update of R to 3.6.X, the random seed generator was changed, which means that the same seed will give slightly different results compared to 3.5.X. This results in minor differences to the bootstrapped estimates if old StoX projects are run with the new R version.

12.2.7 - StoX input, filters and settings for cod and haddock

Input data for survey index estimation were downloaded from DatasetExplorer: https://datasetexplorer.hi.no/apps/datasetexplorer/v2/navigation. See section 3 in main report for information on what snapshot files were used in the current year.

The different functions and settings used in swept area estimation for cod and haddock in StoX are detailed in Table 2. The functions are divided into the three parts of the StoX estimation process: baseline, analysis, and report.

Function Settings Purpose
Baseline    
ReadBiotic FileNames: paths to xml-files in biotic folder Reads in versioned biotic files.
StoxBiotic - Converts and trims data (only keeps key variables, standardises variable names etc.) to a common format used in StoX.
AddToStoxBiotic StoxBioticData: StoxBiotic BioticData: ReadBiotic VariableNames: gearcondition, samplequality, stationtype, length, maturationstage, otolithtype Add variables required for filtering or that are needed in output data.
FilterStoxBiotic (1) StoxBioticData: AddToStoxBiotic FilterExpression: {"Haul": "Gear %in% c(\"3270\", \"3271\") & gearcondition %in% c(\"1\") & samplequality %in% c(\"1\", \"3\")", "Station": "stationtype %notin% \"2\""} FilterUpwards: true Data filtering; removes extra hauls taken on acoustic registrations and unsuccessful hauls, selecting data from bottom trawl only. See https://kvalitet.hi.no/docs/pub/DOK06839.pdf for explanation of the different codes used in the data.
FilterStoxBiotic (2) StoxBioticData: FilterStoxBiotic (1) FilterExpression: {"SpeciesCategory": "SpeciesCategory %in% \"torsk/164712/126436/Gadus morhua\""} FilterUpwards: false Data filtering; selecting data for the target species. For haddock, the SpeciesCategory is: "hyse/164744/126437/Melanogrammus aeglefinus\" Filter upwards set to FALSE in order to keep stations with zero catch of haddock to get representative average swept area densities.
DefineStratumPolygon DefinitionMethod: ResourceFile FileName: input/ vintertokt_barentshavny.txt StratumLabelName: “StratumName” SimplifyStratumPolygon: false The resource file contains polygon definitions for the strata used in the Winter survey.
StratumArea StratumPolygon: DefineStratumPolygon AreaMethod: Accurate Calculates the area of each stratum.
LengthDistribution StoxBioticData: FilterStoxBiotic (2) LengthDistributionType: Normalized RaisingFactorPriority: Weight Calculates length frequency distributions for each station and haul. ‘Normalized’ refers to a length distribution that is standardised to one nautical mile towing distance (i.e., weighted by CPUE). The RaisingFactorPriority relates to how weighting is handled when the haul contains different subsamples for the same species. See StoX documentation for more details on length distributions.
RegroupLengthDistribution (1) LengthDistributionData: LengthDistribution LengthInterval: 1 Sets the length distribution resolution to 1 cm, i.e., 1 cm length groups. There may be length distributions with finer resolution, this will standardise it.
LengthDependentCatch-Compensation LengthDistributionData: RegroupLengthDistribution (1) CompensationMethod: LengthDependentSweepWidth LengthDependentSweepWidth- Parameters: [{"SpeciesCategory": "torsk/164712/126436/Gadus morhua","Alpha":5.91, "Beta":0.43, "LMin":15,"LMax":62}] Adjusts the length distributions for increasing catchability with length (based on the Dixon experiments). For haddock, the parameters are: [{"SpeciesCategory": "hyse/164744/126437/Melanogrammus aeglefinus","Alpha": 2.08, "Beta": 0.75, "LMin": 15, "LMax": 48}
RegroupLengthDistribution (2) LengthDistributionData: LengthDependentCatch- Compensation LengthInterval: 5 Regroups the length distribution to the same resolution as the age sample stratification: 5 cm length groups.
MeanLengthDistribution LengthDistributionData: RegroupLengthDistribution (2) StratumPolygon: DefineStratumPolygon BioticPSU: DefineBioticPSU LayerDefinition: FunctionParameter LayerDefinitionMethod: WaterColumn SurveyDefinition: FunctionParameter SurveyDefinitionMethod: AllStrata PSUDefinition: FunctionParameter PSUDefinitionMethod: StationToPSU Calculates the mean length distribution for each PSU by summing vertically and averaging horizontally. This allows mean length distributions to be calculated across e.g., hauls taken at the same PSU (station) but different depths. For the cod and haddock projects there is only one haul per PSU, which means that the purpose of this function is to define PSUs and convert the LengthDistribution object to a MeanLengthDistribution object for use in further calculations.
SweptAreaDensity MeanLengthDistributionData: MeanLengthDistribution SweptAreaDensityMethod: LengthDistributed SweepWidthMethod: PreDefined DensityType: "AreaNumberDensity" Calculates the area density of fish (number of individuals per square nautical mile). The sweep width method is set to pre-defined since this is already taken care of by the LengthDependentCatchCompensation process.
MeanDensity DensityData: SweptAreaDensity Calculates the average swept area density in each stratum. The average is weighted by the number of hauls per PSU, meaning that for a standard swept area project with one haul per PSU, this will be an unweighted average. For acoustic projects, the mean acoustic density is weighted by the effective log distance.
Quantity MeanDensityData: MeanDensity StratumAreaData: StratumArea Calculates the total abundance of each length group (also species category and layer when relevant) in each stratum based on the mean swept area density and stratum area.
Individuals StoxBioticData: FilterStoXBiotic (2) MeanLengthDistributionData: MeanLengthDistribution QuantityType: SweptArea Defines the individual data that will be used to distribute the abundance on super individuals.
SuperIndividuals IndividualsData: Individuals QuantityData: Quantity LengthDistributionData: RegroupLengthDistribution (2) DistributionMethod: HaulDensity Distributes abundance on the individuals, turning them into “Superindividuals”, each representing a part of the total abundance. Abundance can be divided equally on all individuals, or it can be divided proportionally to the density of the individual’s length group in the haul in which it was caught. Needed to get indices by age and to weigh biological parameters by abundance.
ImputeSuperIndividuals SuperIndividualsData: SuperIndividuals ImputationMethod: RandomSampling ImputeAtMissing: [“IndividualAge”] ImputeByEqual: ["SpeciesCategory", "IndividualTotalLength"] ToImpute: ["IndividualAge", "maturationstage", "IndividualRoundWeight", "otolithtype"] Seed: 1 Identifies individuals that have missing data for a specified variable (here: age, as specified in “ImputeAtMissing”), and assigns the missing variables (and possibly others specified in “ToImpute”) by random sampling from other individuals in the same length group. First, the function looks for suitable individuals from the same haul. If there are none, the random draw extends to other hauls in the stratum, and lastly to the entire survey. Will return NA if no other individuals in the same length group have been aged in the survey. This has the advantage over a traditional age-length key in that it allows imputation of other variables than age.
Analysis    
Bootstrap BootstrapMethodTable: [{"ResampleFunction": "ResampleMeanLength-DistributionData", "ProcessName": "MeanLengthDistribution", "Seed":1}] NumberOfBootstraps: 500 OutputProcesses: ["ImputeSuperIndividuals", "SuperIndividuals"] UseOutputData: FALSE (not ticked) NumberOfCores: 8 BaselineSeedTable: [{"ProcessName": "ImputeSuperIndividuals", "Seed":1}] This function runs a subset of the baseline model several times (as specified in “NumberOfBootstraps”) after resampling trawl hauls in each stratum (with replacement). Here, the baseline model is rerun from MeanLengthDistribution to ImputeSuperIndividuals, calculating new length distributions based on the resampled trawl hauls and redoing the age imputation. The “UseOutputData” option can be used if, e.g., new reports are to be generated from a bootstrap object that has already been run – this option reads in the bootstrap object rather than running it again. The number of cores can be set higher if relevant (will use max number of cores if less than 8).
Report    
ReportBootstrap BootstrapData: Bootstrap BaselineProcess: ImputeSuperIndividuals TargetVariable: Abundance AggregationFunction: sum BootstrapReportFunction: summaryStox "Percentages": [5, 50, 95] GroupingVariables: ["Survey", "SpeciesCategory", "IndividualAge"] RemoveMissingValues: FALSE Report bootstrap abundance. This function gives specified quantiles and mean, sd and CV of abundance by age. The bootstrap mean abundance is used as the official estimate of swept area abundance for cod and haddock. The “Percentages” parameter defines the quantities to report, here it is set to 5 %, 50 % and 95 %. This is the same for the other reports defined below.
ReportBootstrap BootstrapData: Bootstrap BaselineProcess: ImputeSuperIndividuals TargetVariable: Biomass AggregationFunction: sum BootstrapReportFunction: summaryStox GroupingVariables: ["Survey", "SpeciesCategory", "IndividualAge"] RemoveMissingValues: FALSE Report bootstrap biomass.
ReportBootstrap BootstrapData: Bootstrap BaselineProcess: ImputeSuperIndividuals TargetVariable: Abundance AggregationFunction: sum BootstrapReportFunction: summaryStox GroupingVariables: ["Survey","SpeciesCategory, "Stratum", "IndividualAge"] RemoveMissingValues: FALSE Report bootstrap abundance by stratum and age.
ReportBootstrap BootstrapData: Bootstrap BaselineProcess: ImputeSuperIndividuals TargetVariable: Biomass AggregationFunction: sum BootstrapReportFunction: summaryStox GroupingVariables: ["Survey","SpeciesCategory", "Stratum", "IndividualAge"] RemoveMissingValues: FALSE Report bootstrap biomass by stratum and age.
ReportBootstrap BootstrapData: Bootstrap BaselineProcess: ImputeSuperIndividuals TargetVariable: length AggregationFunction: weighted.mean BootstrapReportFunction: summaryStox GroupingVariables: ["Survey","SpeciesCategory", "IndividualAge"] RemoveMissingValues: TRUE AggregationWeightingVariable: Abundance Report bootstrap mean length at age. The mean lengths are weighted by superindividual abundance at age (i.e., individuals from abundant length groups get higher weight).
  BootstrapData: Bootstrap BaselineProcess: ImputeSuperIndividuals TargetVariable: IndividualRoundWeight AggregationFunction: weighted.mean BootstrapReportFunction: summaryStox GroupingVariables: ["Survey","SpeciesCategory", "IndividualAge"] RemoveMissingValues: TRUE AggregationWeightingVariable: Abundance Report bootstrap mean weight at age. The mean weights are weighted by superindividual abundance at age (i.e., individuals from abundant length groups get higher weight).

Table 7 : StoX functions and settings used in the cod and haddock swept area estimations, split on the three parts of the StoX estimation process; baseline, analysis, and report. Updated for StoX v. 4.1.2.

*Note that this is the function name, not the process name – the latter can be freely decided by the user. If a function is used more than once, unique processes names must be given and care must be taken to refer to the right process in subsequent steps of the estimation process (as indicated by numbers after the function name).

Table 3 details the functions and settings used for cod and haddock acoustic estimation in StoX.

Function Settings Details
Baseline    
ReadAcoustic FileNames: paths to xml-files in acoustic folder Reads in versioned acoustic files.
StoxAcoustic - Converts and trims data (only keeps key variables, standardises variable names etc.) to a common format used in StoX.
FilterStoxAcoustic (1) StoxAcousticData: StoxAcoustic FilterExpression: {"Beam":"Frequency %in% 38000","ChannelReference": "ChannelReferenceType %in% \"P\""} FilterUpwards: FALSE Select data from 38 kHz only (in case data is stored on multiple frequencies) and select only pelagic channel data (which contains data from entire water column; the bottom channel “B” is just stored at a higher resolution).
FilterStoxAcoustic (2) StoxAcousticData: FilterStoxAcoustic(1) FilterExpression: {"AcousticCategory": "AcousticCategory %in% \"31\""} FilterUpwards: FALSE For haddock: "AcousticCategory %in% \"30\""
DefineTranslationBeam DefinitionMethod: TranslationTable TranslationTable: [{ "Beam": "38000/1", "NewValue": "38000/2" }] "ValueColumn": "Value", "NewValueColumn":"NewValue", "ConditionalValueColumns": "ConditionalValue" In some cases, the beam names are different on Norwegian and Russian vessels. This defines a key that connects the two names and is used to make sure all data from 38 kHz are included.
TranslateStox- AcousticBeam StoxAcousticData: FilterStoxAcoustic(2) Translation: DefineTranslationBeam Apply the translation to the acoustic data.
ReadBiotic FileNames: paths to xml-files in biotic folder As above.
StoxBiotic - As above.
AddToStoxBiotic StoxBioticData: StoxBiotic BioticData: ReadBiotic VariableNames: ["stationtype", “gearcondition”, “samplequality”] As above.
FilterStoxBiotic StoxBioticData: AddToStoxBiotic FilterExpression: {"Station":"stationtype %notin% \"2\"", "SpeciesCategory": "SpeciesCategory %in% \"torsk/164712/126436/Gadus morhua\"", "Haul": "gearcondition %in% c(\"1\", \"2\") & samplequality %in% c(\"1\", \"2\", \"3\")"} FilterUpwards: true Here we do not keep trawl stations without the target species (FilterUpwards: true), since it is the length samples that are of interest.
LengthDistribution StoxBioticData: FilterStoxBiotic LengthDistributionType: Normalized RaisingFactorPriority: Weight As above.
RegroupLength- Distribution LengthDistributionData: LengthDistribution LengthInterval: 1 As above.
LengthDependentCatch- Compensation LengthDistributionData: RegroupLengthDistribution CompensationMethod: LengthDependentSweepWidth LengthDependentSweep-WidthParameters: [{"SpeciesCategory": "torsk/164712/126436/Gadus morhua","Alpha":5.91, "Beta":0.43, "LMin":15,"LMax":62}] For haddock, the parameters are: [{"SpeciesCategory": "hyse/164744/126437/-Melanogrammus aeglefinus", "Alpha": 2.08, "Beta": 0.75, "LMin": 15, "LMax": 48}
RelativeLength- Distribution LengthDistributionData: LengthDependentCatch-Compensation Converts the length distribution to a relative one (in %).
DefineStratumPolygon   As above
StratumArea   As above
DefineAcousticPSU StoxAcousticData: TranslateStoxAcousticBeam DefinitionMethod: “Manual” Set to manual to define the transects by clicking in the GUI. After doing this once, the transect definitions are stored in the process data.
NASC StoxAcousticData: TranslateStoxAcousticBeam Converts the acoustic data to NASC data format.
MeanNASC NASCData: NASC AcousticPSU: DefineAcousticPSU LayerDefinition: FunctionParameter LayerDefinitionMethod: WaterColumn SurveyDefinition: FunctionParameter SurveyDefinitionMethod: AllStrata PSUDefinition: “ FunctionInput” Sums the NASC data vertically. Here: throughout the entire water column.
DefineBioticAssignment StoxBioticData: FilterStoxBiotic StratumPolygon: DefineStratumPolygon AcousticPSU: DefineAcousticPSU StoxACousticData: TranslateStoxAcousticBeam DefinitionMethod: Stratum LayerDefinition: FunctionParameter LayerDefinitionMethod: WaterColumn Assigns trawl stations to each acoustic PSU; all trawl stations within the same strata as the acoustic PSU will be assigned to that PSU. In the case of few trawl stations in a strata, additional trawls from neighbouring strata can be added manually in the map window.
BioticAssignmentWeighting BioticAssignment: DefineBioticAssignment LengthDistributionData: RegroupLengthDistribution WeightingMethod: SumWeightedNumber How to weight the trawl stations when calculating length distributions for each PSU. The “SumWeightedCount” option gives weighting values that are proportional to the normalized length distribution count (i.e., cpue) in the haul.
AssignmentLength- Distribution LengthDistributionData: RelativeLengthDistribution BioticAssignment: DefineBioticAssignment Calculates weighted average length distributions for each PSU (and layer).
DefineAcousticTarget- Strength DefinitionMethod: Table AcousticTargetStrengthModel: LengthDependent AcousticTargetStrengthTable: [ {"AcousticCategory":"31", "Frequency": 38000, "TargetStrength0": -68, "LengthExponent": 20}] Specifies the target strength-length relation for the target species. The same settings are used for cod and haddock, except that the AcousticCategory is set to “30”.
AcousticDensity MeanNASCData: MeanNASC AssignmentLength-DistributionData: AssignmentLength-Distribution AcousticTargetStrength: DefineAcousticTarget- Strength SpeciesLink: [{"AcousticCategory":"31", "SpeciesCategory": "torsk/164712/126436/Gadus morhua"}] Calculate number density based on the acoustic target strength-length relationship. For haddock: SpeciesLink: [{"AcousticCategory": "30","SpeciesCategory": "hyse/164744/126437/-Melanogrammus aeglefinus"}]
MeanDensity DensityData: AcousticDensity Calculates the weighted average density in each stratum. The weights are the effective log distance of each acoustic PSU.
Quantity MeanDensityData: MeanDensity StratumAreaData: StratumArea As above.
Individuals StoxBioticData: FilterStoxBiotic(2) BioticAssignment: BioStationWeighting AbundanceType: Acoustic As above.
SuperIndividuals IndividualsData: Individuals Quantity Data: Quantity LengthDistributionData: LengthDependentCatch-Compensation DistributionMethod: HaulDensity As above. Currently, the length distribution data is not regrouped to 5 cm length bins in the acoustic projects. This should be considered in the next revision.
ImputeSuperIndividuals SuperIndividualsData: SuperIndividuals ImputationMethod: RandomSampling ImputeAtMissing: ["IndividualAge"] ImputeByEqual: ["SpeciesCategory", "IndividualTotalLength"] ToImpute: ["IndividualRoundWeight", "LengthResolution", "WeightMeasurement", "IndividualSex", "IndividualAge"] Seed: 1 As above.
Analysis    
Bootstrap BootstrapMethodTable: [{"ResampleFunction": "ResampleMeanNASCData", "ProcessName": "MeanNASC", "Seed":4}, {"ResampleFunction": "ResampleBioticAssignment", "ProcessName": "BioticAssignmentWeighting", "Seed":7}] NumberOfBootstraps: 500 OutputProcesses: [ "ImputeSuperIndividuals"] UseOutputData: false NumberOfCores: 8 BaselineSeedTable: [{"ProcessName": "ImputeSuperIndividuals", "Seed":2}] As above.

Table 8 : StoX functions and settings used in the cod and haddock acoustic estimations, split on the baseline and analysis part of the StoX estimation procedure. For details on functions used also in the swept area index (including report generation), refer to table 2. Updated for StoX v. 4.1.2.

12.2.8 - Estimation of variance

The acoustic and swept area survey indices are presented together with an estimate of uncertainty (coefficient of variation; CV). These estimates are obtained from the bootstrap routine presented under the analysis section of Table 2. In the bootstrap of acoustic indices, each transect is treated as the primary sampling unit. In addition, a bootstrap routine for all trawl stations by strata is carried out within each run. The estimated CV (Standard Deviation ∙ 100/mean) is estimated from 500 iterations.

12.3 - References

See section 10 in main report.

13 - Appendix 3. Changes in survey design, methods, gear etc.

13.1 - Changes to survey design and equipment

Year Change from To
1984 Representative age sample, 100 per station Stratified age sample, 5 per 5-cm length group
1986 1 research vessel, 2 commercial trawlers 2 research vessels, 1 commercial trawler
1987 60 min. tow duration 30 min. tow duration
1989 Bobbins gear Rock-hopper gear
1990 Random stratified bottom trawl stations Fixed station grid, 20 nm distance
  Simrad EK400 echo sounder Simrad EK500 echo sounder and BEI post processing
1993 Fixed survey area (ABCD), 1 strata system, 35 strata Extended, variable survey area (ABCDD’ES), 2 strata systems, 53 + 10 strata
  Fixed station grid, 20 nm distance Fixed station grid, 20/30/40 nm distance
  No constraint technique (strapping) on bottom trawl doors Constraint technique on some bottom trawl hauls
  5 age samples per 5-cm group, 2 per stratum 2 age samples per 5-cm group, 4 per stratum (cod and haddock)
1994 35-40 mm mesh size in cod-end 22 mm mesh size in cod-end
  Strapping on some hauls Strapping on every 3. haul
  Hull mounted transducers Keel mounted transducers Johan Hjort
1995 Variable use of trawl sensors Trawl manual specifying use of sensors
  Strapping on every 3. haul Strapping on every 2. haul
  2 research vessels, 1 commercial trawler 3 research vessels
1996 2 strata systems and 63 strata, 20/30/40 nm distance 1 strata system and 23 strata, 16/24/32 nm distance
  2 age samples per 5-cm group, 4 per stratum 1 age sample per 5-cm group, all stations with > 10 specimens (cod and haddock)
1997 16/24/32 nm distance 20 nm distance
  Hull mounted transducers Keel mounted transducers G.O. Sars
1998 Strapping on every 2. haul Strapping on every haul
  20 nm distance 20/30 nm distance
2000 3 Norwegian research vessels 2 Norwegian and 1 Russian research vessel
2002 20/30 nm distance station grid 16/20/24/32 nm distance station grid
2003 Height trawl sensor for opening and bottom contact Trawl eye for opening and bottom contact
2004 Vaco trawl doors V- doors G.O. Sars and Johan Hjort
  EK 500 ER60 G.O. Sars
2005 EK 500 ER60 Johan Hjort and Russian vessels
2006 Standard Campelen rigging “Tromsø rigging” on Norwegian vessels
2007 BEI LSSS Norwegian vessels
2008 V trawl doors Thyborøn doors Jan Mayen/Helmer Hanssen
2010 V trawl doors Thyborøn doors G.O. Sars and Johan Hjort
2011 30 min. tow duration 15 min. tow duration
2014 1 strata system and 23 strata 1 strata system and 26 strata (extended area N)
2015 “Tromsø rigging” on Norwegian vessels Standard Campelen rigging
2017 EK 60 on G.O. Sars EK80 in EK 60 mode on G.O. Sars
2018 EK 60 on Johan Hjort EK80 in EK 60 modus on Johan Hjort

13.2 - Changes to estimation methods

Year Change from To Time series revised
1989 Uniform gear handling Correction for change from Bobbins gear to Rock-hopper gear for cod and haddock x
1993 TS = 21.8 log L – 74.9 for cod and haddock TS = 20 log L – 68 for all demersal species x
  Weighting of age-length keys by total catch Weighting of ALK by swept area estimate  
1995 Constant effective fishing width of the trawl Fish size dependent effective fishing width (time series corrected) x
2017 Swept area estimates by the Survey Program Swept area and CV estimates by StoX software x
2018 Acoustic estimates by the BEAM Program Acoustic and CV estimates by StoX software x
2020 Area N not included in standard time series Area N included in haddock survey indices x (haddock, area N presented separately for the other species)
2021 Area N not included in standard time series Area N included in cod survey indices x (cod, area N presented separately for b)

14 - Appendix 4. Scientific participants 2026

Research vessel Participants
“ Johan Hjort” (17.01-16.03) Part 1 (09.02-19.02) J. A. Godiksen (cruise leader) , R. Strømme, G. Torsheim, E. Holm, H. Savolainen, S. Maridal, A. Bruvik. Part 2 (19.02-25.02) J. A. Godiksen (cruise leader) , R. Strømme, G. Torsheim, E. Holm, H. Savolainen, S. Maridal, L. Solbakken. Part 3 (25.02-16.03) H. A. Midtun (cruise leader), R. Strømme, E. L. Langhelle, S. Grønnevik, H. Haraldsen-Lien, A. Sæverud, O. M. Aakre.
“ Kronprins Haakon” (24.01-07.03) Part 1 (24.01-11.02) T. Wenneck (cruise leader), E. L. Langhelle, S. Grønnevik, F. Midtøy, R. H. Robertsen, F. Frigstad, V. Fauskanger. Part 2 (11.02-19.02) T. Wenneck (cruise leader), E. L. Langhelle, S. Grønnevik, F. Midtøy, R. H. Robertsen, F. Frigstad, E. Eidset, A. Staby, C. A. Solberg, J. Høyer, M. Lomeli. Part 3 (19.02-17.03) T. Wenneck (cruise leader) , V. Fauskanger, L. J. Ohnstad, S. N. Larsen, E. Odland, S. Gundersen.
“ Vilnyus” (02.02-11.03) A. Russkikh (cruise leader) , M. Rybakov, A. Amelkin, I. Krupin, A. Zubkov, D. Draganov, V. Sivkova, A. Brykina, S. Harlin, D. Okatov, M. Gubanishchev, A. Kanishchev, A. Bessonov, T. Mishin

15 - Appendix 5. Annual survey reports

Dalen, J., Hylen, A. og Smedstad, O. M. 1981. Intern toktrapport unummerert. Havforskningsinstituttet.

Dalen, J., Hylen, A., Jakobsen, T., Nakken, O., Randa, K. and Smedstad, O. 1982. Norwegian investigations on young cod and haddock in the Barents Sea during the winter 1982. ICES CM 1982/G: 41, 20 pp.

Dalen, J., Hylen, A., Jakobsen, T., Nakken, O., Randa, K., and Smedstad, O. 1983. Preliminary report of the Norwegian investigations on young cod and haddock in the Barents Sea during the winter 1983. ICES CM 1983/G:15, 23 pp

Dalen, J., Hylen, A., Jakobsen, T., Nakken, O. and Randa, K. 1984. Preliminary report of the Norwegian Investigations on young cod and haddock in the Barents Sea during the winter 1984. ICES CM 1984/G:44, 26 pp.

Hylen, A., Jakobsen, T., Nakken, O. and Sunnanå, K. 1985. Preliminary report of the Norwegian Investigations on young cod and haddock in the Barents Sea during the winter 1985. ICES CM 1985/G:68, 28 pp.

Hylen, A., Jakobsen, T., Nakken, O., Nedreaas, K. and Sunnanå, K. 1986. Preliminary report of the Norwegian Investigations on young cod and haddock in the Barents Sea. ICES CM 1986/G:76, 25 pp.

Godø, O. R., Hylen, A., Jacobsen, J. A., Jakobsen, T., Mehl, S., Nedreaas, K. and Sunnanå, K. 1987. Estimates of stock size of Northeast Arctic cod and haddock from survey data 1986/1987. ICES CM 1987/G: 37.

Hylen, A., Jacobsen, J.A., Jakobsen, T., Mehl, S., Nedreaas, K. and Sunnanå, K. 1988. Estimates of stock size of Northeast Arctic cod and haddock, Sebastes mentella and Sebastes marinus from survey data, winter 1988. ICES CM 1988/G: 43.

Jakobsen, T., Mehl, S., Nakken, O., Nedreaas, K. and Sunnanå, S. 1989. Estimates of stock size of Northeast Arctic cod and haddock, Sebastes mentella and Sebastes marinus from survey data, winter 1989. ICES CM 1989/G: 42.

Jakobsen, T., Mehl, S. og Nedreaas, K. 1990. Kartlegging av mengde og utbredelse av torsk, hyse og uer i Barentshavet januar mars 1990. Intern toktrapport, Senter for marine ressurser, Havforskningsinstituttet, Bergen. Engelsk abstrakt, tabell og figurtekster. 29 s. (upubl.).

Hylen, A., Jakobsen, T., Mehl, S., og Nedreaas, K. 1991. Undersøkelser av torsk, hyse og uer i Barentshavet vinteren 1991. Intern toktrapport nr. 1 -1992, Senter for marine ressurser, Havforskningsinstituttet, Bergen. Engelsk abstrakt, tabell og figurtekster. 30 s. (upubl.).

Godø, O.R., Jakobsen, T., Mehl, S., Nedreaas, K. og Raknes, A. 1992. Undersøkelser av torsk, hyse og uer i Barentshavet vinteren 1992. Intern toktrapport 39/92, Senter for marine ressurser, Havforskningsinstituttet, Bergen. Engelsk abstrakt, tabell og figurtekster. 33 s. (upubl.).

Korsbrekke, K., Mehl, S., Nakken, O. and Nedreaas, K. 1993. Bunnfiskundersøkelser i Barentshavet vinteren 1993. Rapp. Senter Marine Ressurser nr. 14-1993. Engelsk abstrakt, tabell- og figurtekster. 47s. Havforskningsinstituttet, Bergen.

Mehl, S. og Nakken, O. 1994. Bunnfiskundersøkelser i Barentshavet vinteren 1994. Fisken Hav (6) 1994. 72 s. Havforskningsinstituttet, Bergen.

Korsbrekke, K., Mehl, S., Nakken, O. og Sunnanå, K. 1995. Bunnfiskundersøkelser i Barentshavet vinteren 1995. Fisken Hav (13) 1995. 86 s. Havforskningsinstituttet, Bergen.

Mehl, S. og Nakken, O. 1996. Botnfiskundersøkingar i Barentshavet vinteren 1996. Fisken Hav (11) 1996. 68 s. Havforskingsinstituttet, Bergen.

Mehl, S. 1997. Botnfiskundersøkingar i Barentshavet (norsk sone) vinteren 1997. Fisken Hav (11) 1997. 72 s. Havforskingsinstituttet, Bergen.

Mehl, S. 1998. Botnfiskundersøkingar i Barentshavet (redusert område) vinteren 1998. Fisken Hav (7) 1998. 69 s. Havforskingsinstituttet, Bergen.

Mehl, S. 1999. Botnfiskundersøkingar i Barentshavet vinteren 1999. Fisken Hav (13) 1999. 70 s. Havforskingsinstituttet, Bergen.

Aglen, A., Drevetnyak, K., Jakobsen, T., Korsbrekke, K., Lepesevich, Y., Mehl, S., Nakken, O. and Nedreaas, K. 2001. Investigations on demersal fish in the Barents Sea winter 2000. Detailed report. IMR-PINRO Joint Report Series no. 5, 2001. 74 pp.

Aglen, A., Alvsvåg, J, Korsbrekke, K., Lepesevich, Y., Mehl, S., Nedreaas, K., Sokolov, K. and Ågotnes, P. 2002. Investigations on demersal fish in the Barents Sea winter 2001. Detailed report. IMR-PINRO Joint Report Series no. 2 2002, 66 pp.

Aglen, A., Alvsvåg, J., Drevetnyak, K, Høines, Å., Korsbrekke, K., Mehl, S., and Sokolov, K. 2002. Investigations on demersal fish in the Barents Sea winter 2002. Detailed report. IMR/PINRO Joint report series no 6, 2002. 63 pp.

Aglen, A., Alvsvåg, J., Halland, T.I., Høines, Å., Nakken, O., Russkikh, A., and., Smirnov, O. 2003. Investigations on demersal fish in the Barents Sea winter 2003. Detailed report. IMR/PINRO Joint report series no 1, 2003. 56pp.

Aglen, A., Alvsvåg, J., Høines, Å., Korsbrekke, K., Smirnov, O., and Zhukova, N., 2004. Investigations on demersal fish in the Barents Sea winter 2004. Detailed report. IMR/PINRO Joint report series no 5/2004, ISSN 1502-8828. 58pp.

Aglen, A., Alvsvåg, J., Grekov, A., Høines, Å., Mehl, S., and Zhukova, N. 2005. Investigations of demersal fish in the Barents Sea winter 2005. IMR/PINRO Joint Report Series, No 4/2005. ISSN 1502-8828, 58 pp.

Aglen, A., Alvsvåg, J., Høines, Å., Johannesen, E. and Mehl, S. 2008. Investigations on demersal fish in the Barents Sea winter 2006. Detailed report. Fisken Hav13 (2008). 49 pp.

Aglen, A. 2007. Report from demersal fish survey in the Barents Sea February-March 2007. WD #8 ICES Arctic Fisheries Working Group, Vigo, Spain 19-28 April 2007.

Aglen, A., Høines, Å., Mehl, S., Prozorkevich, D., Smirnov, O. and Wenneck, T. de L. 2008. Results from the Joint IMR-PINRO Barents Sea demersal fish survey 25 January – 14 March 2008. WD #16 ICES Arctic Fisheries Working Group, ICES Headquarters 21-29 April 2008.

Aglen, A., Alexandrov, D., Høines, Å., Mehl, S., Prozorkevich, D. and Wenneck, T. de L. 2009. Results from the Joint IMR-PINRO Barents Sea demersal fish survey 1 February – 15 March 2009. WD #11 ICES Arctic Fisheries Working Group, San-Sebastian, Spain 21-27 April 2007.

Aglen, A., Alexandrov, D., Gjøsæter, H., Johannesen, E., Mehl, S. and Wenneck, T. de L. 2010. Results from the Joint IMR-PINRO Barents Sea demersal fish survey 1 February – 17 March 2010. WD #15 ICES Arctic Fisheries Working Group, Lisbon, Portugal/Bergen, Norway 22-28 April 2010.

Aglen, A., Alexandrov, D., Gjøsæter, H., Johannesen, E. and Mehl, S. 2011. Results from the Joint IMR-PINRO Barents Sea demersal fish survey 1 February – 14 March 2011. WD #3 ICES Arctic Fisheries Working Group, Hamburg, Germany 28 April - 4 May 2011.

Aglen, A., Dingsør, G., Mehl, S., Murashko, P. and Wenneck, T. de L. 2012. Results from the Joint IMR-PINRO Barents Sea demersal fish survey 21 January – 15 March 2012. WD #3 ICES Arctic Fisheries Working Group, Copenhagen, Denmark 20-26 April 2012.

Mehl, S., Aglen, A., Alexandrov, D.I., Bogstad, B., Dingsør, G.E., Gjøsæter, H., Johannesen, E., Korsbrekke, K., Murashko, P.A., Prozorkevich, D.V., Smirnov, O.V., Staby, A., and Wenneck, T. de Lange, 2013. Fish investigations in the Barents Sea winter 2007-2012. IMR/PINRO Joint Report Series 1-2013, 97 pp.

Aglen, A., Dingsør, G., Godiksen, J., Gjøsæter, H., Johannesen, E. and Murashko, P. 2013. Results from the Joint IMR-PINRO Barents Sea demersal fish survey 1 February – 13 March 2013. WD #3 ICES Arctic Fisheries Working Group, Copenhagen, Denmark 18-24 April 2013.

Aglen, A., Godiksen, J., Gjøsæter, H., Mehl, S., Russkikh, A. and Wenneck, T. de L. 2014. Results from the Joint IMR-PINRO Barents Sea demersal fish survey 22 January – 8 March 2014. WD #3 ICES Arctic Fisheries Working Group, Lisbon, Portugal 23-29 April 2014.

Mehl, S., Aglen, A., Bogstad, B., Dingsør, G.E., Gjøsæter, H., Godiksen, J., Johannesen, E., Korsbrekke, K., Murashko, P.A., Russkikh, A.A, Staby, A., Wenneck, T. de Lange, Wienerroither, R. 2014. Fish investigations in the Barents Sea winter 2013-2014. IMR/PINRO Joint Report Series 2014(2), 73 pp. ISSN 1502-8828.

Mehl, S. Aglen, A., Amelkin, A., Dingsør, G.E., Gjøsæter, H., Godiksen, Staby, A., Wenneck, T. de Lange, Wienerroither. 2015. Fish investigations in the Barents Sea, winter 2015. IMR-PINRO report series 2-2015. 61 pp.

Mehl, S., Aglen, A., Amelkin, A.V., Bogstad, B., Dingsør, G., Korsbrekke, K., Olsen, E., Russkikh, A.A., Staby, A., Wenneck, T. de Lange and Wienerroither, R. 2016. Fish investigations in the Barents Sea winter 2016. IMR/PINRO Joint Report Series 2016-4, 76pp.

Mehl, S., Aglen, A., Bogstad, B., Russkikh, A.A., Staby, A., Wenneck, T. de Lange and Wienerroither, R. 2017. Fish investigations in the Barents Sea winter 2017. IMR/PINRO Joint Report Series 2017-3, 87pp.

Mehl, S., Aglen, A., Gjøsæter, H., Godiksen, J. A., Russkikh, A.A., Staby, A., Tretyakov, I., Wenneck, T. de Lange and Wienerroither, R. 2018. Fish investigations in the Barents Sea winter 2018. IMR/PINRO Joint Report Series 2018-1, 82pp.

Mehl, S., Wenneck, T. de Lange, Aglen, A., Fuglebakk, E., Gjøsæter, H., Godiksen, J. A., Seim, S., Staby, A., Bogstad, B., Russkikh, A. and Fomin, K. 2019. Fish investigations in the Barents Sea winter 2019. IMR/PINRO Joint Report Series: 4-2019, 84pp.

Fall, J., de Lange Wenneck, T., Bogstad, B., Fuglebakk, E., Gjøsæter, H., Seim, S. E., Skage, M. L., Staby, A., Tranang, C. A., Windsland, K., Russkikh, A. A., Fomin, K. 2020. Fish investigations in the Barents Sea winter 2020. IMR/PINRO Joint Report Series: 2-2020, 98 pp.

Fall, J., de Lange Wenneck, T., Bogstad, B., Fuglebakk, E., Godiksen, J. A., Korsbrekke, K., Seim, S. E., Skage, M. L., Staby, A., Tranang, C. A., Windsland, K., Russkikh, A. A., Fomin, K. 2021. Fish investigations in the Barents Sea winter 2021. IMR/PINRO Joint Report Series: 1-2022, 100 pp.

Fall, J., de Lange Wenneck, T., Bogstad, B., Fuglebakk, E., Godiksen, J. A., Høines, Å., Korsbrekke, K., Skage, M. L., Staby, A., Tranang, C. A., Windsland, K., Russkikh, A. A., Kharlin, S. 2022. Fish investigations in the Barents Sea winter 2022. IMR/PINRO Joint Report Series: 1-2023, 93 pp.

Fall, J., de Lange Wenneck, T., Bogstad, B., Eidset, E., Fuglebakk, E., Godiksen, J. A., Høines, Å., Korsbrekke, K., Midtun, H. A., Skage, M. L., Skaret, G., Staby, A., Tranang, C. A., Windsland, K., Russkikh, A. A., Kharlin, S. 2024. Fish investigations in the Barents Sea winter 2023. IMR/PINRO Joint Report Series: 1-2024, 144 pp.

Godiksen, J. A., de Lange Wenneck, T., Bogstad, B., Eidset, E., Fall, J., Fuglebakk, E., Høines, Å., Johannesen, E., Midtun, H. A., Skage, M. L., Skaret, G., Staby, A., Tranang, C. A., Windsland, K., Russkikh, A. A., Kharlin, S. 2025. Fish investigations in the Barents Sea Winter 2025. IMR/PINRO Joint Report Series: 7-2025, 132 pp.

8